ML20155E781
| ML20155E781 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 09/30/1988 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| Shared Package | |
| ML20155E785 | List: |
| References | |
| NUDOCS 8810120412 | |
| Download: ML20155E781 (2) | |
See also: IR 05000424/1988039
Text
_ - _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _
_
_ _ _ _ _ _ _ _ _ .
_ _ _ _ _ _ _ _
_
_
__ _.
. _ _ _ _ _ _
.
- g
e
.
SEP 301988
Docket No. 50-424
Iicense No. NPF-68
,
pATTN:.orgia Power Company
Mr. W. G. Hairston, III
Senior Vice President -
Nuclear Operations
P. O. Box 4545
Atlanta, GA 30302
.
Gentlemen:
,
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT NO. 50-424/88-39)
'his refers to the Nuclear Regulatory Comission (NRC) inspection conducted by
!
D. C. Ward on August 29 - September 2, 1988.
The inspection included a review
of activities authorized for your Vogtle facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
i
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
Two violations were identified during the inspection. Since
'
all of the criteria for categorization of license identified violations were
met, one violation is not being cited. The details pertaining to the licensee
identiffeo violation are described in the enclosed Inspection Report
(Paragraph 2.f.).
The other violation identified by the inspector with
,
pertinent references, is described in the enclosed Notice of Violation.
Corrective actions to eliminate the violation and prevent reoccurrence were
completed prior to the end of the inspection, therefore, a reply to this Notice
of Violation is not required.
,
i
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
7
will be placed in the NRC Public Document Room.
!
l
j
l
!
l
!
8810120412 80093o
.
gDR
ADOCK 05000424
PNV
l
!
JN{ot
'
-
-
-
_ _ _ _ _ _ _ _ _ .
_ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
.
O,
$@> $h QQ
Georgia Power Company
2
Should you have any questions concerning this letter, please contact us.
Sincerely.
ORIGINAL SIGNED BY
ALAN R. HERDT
Alan R. Herdt, Chief
'
Engineering Branch
Division of Reactor Safety
l
Enclosures:
1.
Notice o' Violation
2.
NRC Inspiction Report
cc w/encis:
/R. P. Mcdonald, Executive Vice
, President, Nuclear Operations
/P. D. Rice, Vice President, Project
Director
vt. W. Haycs, Vogtle Quality
Assurance Manager
J. Bockhold, Jr. , General Manager,
Nuclear Operations
/J. P. Kane, Manager Licensing
and Engineering
/ . A. Bailey, Project Licensing
J
,
i
Manager
v . W. Churchill, Esq. , Shm,
6
Pittman, Potts and Trowbr1uge
/D. Kirkland, !!!, Counsel,
Office of the Consumer's Utility
d). Council
-
,
Feig, Georgians Against
!
Nuclear Energy
State of Georgia
bec w/encis:
jE. Reis OGC
V . Hopkins, NRR
J
M. Sinkule, R!!
DRS, Technical Assistant
/NRC Resident Inspector
i
Document Control Desk
!
J. Ulie, RIII
J. Singh, RIV
.-
C. Ramsey, RV
D. Kubicki, NRR
(
RI
Rg
RII
0[/
DWard:es
TConlon
MSinkule
9////88
1
9g/83
g4/88
.
.
.
._ _
_
. . _ _ _
_ __