Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20155D022 + (ML20155D022)
- ML20155D024 + (ML20155D024)
- ML20155D026 + (ML20155D026)
- ML20155D030 + (ML20155D030)
- ML20155D031 + (ML20155D031)
- ML20155D032 + (ML20155D032)
- ML20155D035 + (ML20155D035)
- ML20155D036 + (ML20155D036)
- JPN-88-027, Proposed Tech Spec 3.11.B.1,clarifying Term Compartment & Eliminating Conflict Between Tech Specs 3.11.B.1 & 4.11.B.1 Re Crescent Area Ventilation Operability & Surveillance Testing.Util Safety Evaluation of Proposed Change Encl + (ML20155D038)
- ML20155D041 + (ML20155D041)
- ML20155D042 + (ML20155D042)
- IR 05000285/1998017 + (ML20155D043)
- ML20155D044 + (ML20155D044)
- ML20155D045 + (ML20155D045)
- ML20155D048 + (ML20155D048)
- ML20155D049 + (ML20155D049)
- 05000352/LER-1988-017, :on 880509,reactor Encl Isolation & Nssss Group VI a & B Isolations Occurred.Caused by Component Failure. Instrument Air Supply to SV-76-144A Closed Following Second Reactor Encl Isolation + (ML20155D050)
- ML20155D051 + (ML20155D051)
- ML20155D052 + (ML20155D052)
- ML20155D054 + (ML20155D054)
- ML20155D055 + (ML20155D055)
- ML20155D056 + (ML20155D056)
- ML20155D059 + (ML20155D059)
- ML20155D060 + (ML20155D060)
- ML20155D062 + (ML20155D062)
- ML20155D063 + (ML20155D063)
- ML20155D067 + (ML20155D067)
- 05000341/LER-1988-020, :on 880508,incorrect HPCI Surveillance Test Procedure Performed Causing Reactor Scram.Procedure Intended to Be Performed in Cold Shutdown or Refueling Condition. Procedure 24.202.04 Revised + (ML20155D070)
- 05000374/LER-1985-032, :on 850524,discovered That Delta Temp Leak Detection for Divs 1 & 2 of RHR Rooms Improperly Designed. Caused by Failure of Engineers to Reflect Unit 1 Changes in Unit 2 Design.Sensors Relocated + (ML20155D071)
- ML20155D073 + (ML20155D073)
- 05000333/LER-1998-011, :on 980929,failure to Meet Drywell Continuous Atmosphere Monitoring Sys TS Surveillance Test Requirements Were Noted.Caused by Deficient Tp.Declared Both Channels of CAM Sys Inoperable.With + (ML20155D076)
- ML20155D079 + (ML20155D079)
- SVP-98-328, Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period of 971001-980715,per 10CFR50.59 & 10CFR50.71(e).With + (ML20155D080)
- ML20155D082 + (ML20155D082)
- 05000374/LER-1988-006, :on 880513,Technical Surveillance LTS-500-12 Re Loose Parts Monitor Functional Test Not Performed as Required.Caused by Personnel Error.Surveillance Immediately Performed + (ML20155D083)
- ML20155D085 + (ML20155D085)
- ML20155D086 + (ML20155D086)
- ML20155D090 + (ML20155D090)
- ML20155D092 + (ML20155D092)
- IR 05000254/1988200 + (ML20155D093)
- ML20155D094 + (ML20155D094)
- ML20155D096 + (ML20155D096)
- ML20155D098 + (ML20155D098)
- ML20155D100 + (ML20155D100)
- ML20155D101 + (ML20155D101)
- ML20155D102 + (ML20155D102)
- ML20155D106 + (ML20155D106)
- IR 05000313/1998020 + (ML20155D107)
- ML20155D108 + (ML20155D108)
- ML20155D110 + (ML20155D110)
- 05000338/LER-1988-016, :on 880513,recirculation Spray HX Not Placed in Dry Layup as Stated in Ufsar.Reviews to Allow Wet Layup May Not Have Completely Accounted for Biological Fouling. Operations Standing Order Issued + (ML20155D111)