Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20150A433 + (ML20150A433)
- ML20150A436 + (ML20150A436)
- ML20150A437 + (ML20150A437)
- ND-20-0157, ITAAC Closure Notification on Completion of ITAAC 2.2.03.08c.i.01 (Index Number 177) + (ML20150A466)
- ML20150A470 + (ML20150A470)
- ML20150A473 + (ML20150A473)
- ND-20-0194, ITAAC Closure Notification on Completion of ITAAC 2.2.03.08c.l.04 (Index Number 180) + (ML20150A477)
- ML20150A493 + (ML20150A493)
- ML20150A538 + (ML20150A538)
- ML20150A569 + (ML20150A569)
- ML20150A570 + (ML20150A570)
- Press Release-III-20-004, NRC Names New Resident Inspector at Palisades Nuclear Power Plant + (ML20150A584)
- NRC-20-0035, Response to Apparent Violations in NRC Inspection Report 05000341/2020403; EA-19-138 + (ML20150A598)
- ML20150A601 + (ML20150A601)
- ML20150A605 + (ML20150A605)
- ML20150A606 + (ML20150A606)
- ML20150A607 + (ML20150A607)
- ML20150A608 + (ML20150A608)
- ML20150A609 + (ML20150A609)
- 05000424/LER-1988-017-01, :on 880605,liquid Release Performed Prior to Completion of Source Check of Radiation Monitor.Caused by Inadequate Procedure.Procedure Revised to Require Source Check to Be Performed.Personnel Counseled + (ML20150A610)
- ML20150A611 + (ML20150A611)
- ML20150A612 + (ML20150A612)
- ML20150A613 + (ML20150A613)
- ML20150A614 + (ML20150A614)
- ML20150A616 + (ML20150A616)
- ML20150A617 + (ML20150A617)
- 05000315/LER-1978-048, Forwards LER 78-048/03L on 780810 + (ML20150A618)
- IR 05000416/1987027 + (ML20150A619)
- 05000315/LER-1978-048-03, /03L on 780810:After a Control Rod Movement of 5 Steps,The Apdms Failed to Perform Scans to Determine F(Z). Procedureal Change Has Been Issued & Opers Instructed in Its Use. (Encl to 7809190196) + (ML20150A620)
- ML20150A622 + (ML20150A622)
- 05000315/LER-1978-049, Forwards LER 78-049/03l-0 on 780912 + (ML20150A624)
- 05000316/LER-1978-059, Forwards LER 78-059/03L-1 and 78-060/03L-0 + (ML20150A626)
- 05000315/LER-1978-049-03, /03l-0 on 780912:when the Operator Cycle Tested the Valve Upon Returning It to Svc.He Failed to Realize That an Isolation Time Test Was Required.Times Were Posted as Corrective Action,For All Valves.(Encl to 7809190209) + (ML20150A628)
- ML20150A629 + (ML20150A629)
- IR 05000424/1987068 + (ML20150A631)
- 05000316/LER-1978-059-03, /03L-1 on 780806:reactor Pwr Increased Above Admin Level of 91% & Tech Spec 4.2.6.1 Limit of 94% W/O Determining Axial Pwr Dist Factor Fz. Caused by Personnel Error. (Encl to 78809190234) + (ML20150A632)
- ML20150A634 + (ML20150A634)
- 05000316/LER-1978-060-03, /03L-0 on 780809:with Reactor Pwr at 97% Computer Failed to Printout All F Scans. Investgation Determined Cause to Be Apdms Computer (Encl to 7809190234) + (ML20150A635)
- 05000424/LER-1988-016-01, :on 880603,water from Preaction Valve Leakoff Lines Seeped Into Control Room.Caused by Inadequate Design of Control Room Ceiling Penetrations.Seepage Path Blocked W/ Silicone Sealant & Sprinkler Sys Isolated + (ML20150A636)
- ML20150A637 + (ML20150A637)
- ML20150A638 + (ML20150A638)
- ML20150A639 + (ML20150A639)
- ML20150A640 + (ML20150A640)
- ML20150A641 + (ML20150A641)
- ML20150A642 + (ML20150A642)
- ML20150A643 + (ML20150A643)
- ML20150A644 + (ML20150A644)
- IR 05000324/1987040 + (ML20150A645)
- ML20150A646 + (ML20150A646)
- ML20150A647 + (ML20150A647)
- ML20150A648 + (ML20150A648)