Forwards Amend 18 to License DPR-21 & Safety Evaluation. Amend Revises Tech Spec Section 3.5.C, Core & Containment Cooling Sys - Feedwater Coolant Injection Subsys, by Increasing Min Required Condensate Storage Tank Vol
ML20150A617
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/27/1988
From: Boyle M
Office of Nuclear Reactor Regulation
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20150A621 List:
References
TAC-65995, NUDOCS 8807080107
Download: ML20150A617 (2)


Text

. _ _

June 27, 1988 Docket No. 50-P45

% Docket DISTRIBUTION J11ece< EJordan NRC & Local'PDRs BGrimes SVarga TRarnhart(4)

'Mr. Edward J. Mroczka BBoger Wanda Jones Senior Vice President SNorris EButcher Nuclear Engineering and Operations MBoyle ACRS(10)

Northeast Nuclear Energy Company OGC GPA/PA P. O. Box 270 DHagan ARM /LFMB Hartford, Connecticut 06141-0270 Gray File

Dear Mr. Mroczka:

SUBJECT:

ISSUANCE OF AMENDMENT _(TAC N0. 65995)

The Commission has issued the enclosed Amendment No.18 to Facility Operating License No OPR-21 for Millstone Nuclear Power Station, Unit No. 1. The amendment is in response to your application dated August 17, 1987.

The amendrnent will revise Technical Specifications Section 3.5.C, Core and Containment Cooling Systems - Feedwater Coolant Injection (FWCI) Subsystem, by

. increasing the minimum required condensate storage tank volume from 225,000 gallons of water to 250,000 gallons to provide an enhanced assurance for achieving cold shutdown in the event of a reactor building fire.

A copy of the related Safety Evaluation is also enclosed. The notice of issuance will be included in the Commission's bi-weekly Federal Register notice.

Sincerely, ,

original signed by Michael L. Boyle, Pro.iect Manager ,

Project Directorate I-4

! . Division of Reactor Projects I/II Office of Nuclear Reactor Regulation l

Enclosures:

1. Amendment No.18 to OPR-21

, 2. Safety Evaluation l cc w/ enclosures:

! See next page i

! LA:PDI-4 PM:PDI-4 tO  : -4 OGC l

MBoyle:b J SRt9r//88 06//' (6/l6/88 06 /88 06q,88 ff0I i

l 8807080107 880627 DR ADOCK 050 5 t

Mr. Edward J. Mroczka Millstone Nuclear Power Station s

Northeast Nuclear Energy Company Unit No. 1 CC:

Gerald Garfield, Esquire R. M. Kacich, Manager Day, Berry and Howard Generation Facilities Licensing Counselors at Law Northeast Utilities Service Company City Place Post Office Box 270 Hartford, Connecticut 06103-3499 Hartford, Connecticut 06141-0270 W. D. Romberg, Vice President D. O. Nordquist Nuclear Operations . Manager of Quality Assurance Northeast Utilities Service Company Northeast Nuclear Energy Company Post Office Box 270 Post Office Box 270 Hartford, Connecticut 06141-0270 Hartford, Connecticut 06141-0270 Kevin McCarthy, Director Regional Administrator Radiation Control Unit Region I Departnent of Environmental Protection U. S. Nuclear Regulatory Commission State Office Building 475 Allendale Road Hartford, Connecticut 06106 King of Prusi;ia, Pennsylvania 19406 Bradford S. Chase, Under Secretary First Selectmen Energy Division Town of Waterford Office of Policy and Management Hall of Records 80 Washington Street 200 Boston Post Road Hartford, Connecticut 06106 Waterford, Connecticut 0638E S. E. Scoce, Station Superintendent H. J. Raymond, Resident Inspector Millstone Nuclear Power Station Millstone Nuclear Power Station Northeast Nuclear Energy Company c/o U. S. Nuclear Regulatory Commission Post Office Box 128 Post Office Box 811 Waterford, Connecticut 06385 Niantic, Connecticut 06357 J. P. Stetz, Unit Superintendent Millstone Unit No. 1 Northeast Nuclear Energy Company Post Office Box 128 l Waterford, Connecticut 06385 l

l