Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000206/LER-1988-003, :on 880208,discovered That Info Provided by Westinghouse in 1985 Re Main Steam Line Break Analysis in Error.Action Commenced to Ensure Safety Injection Sys Piping Has Boron Concentration in Excess of 3,750 Ppm + (ML20149M297)
- ML20149M298 + (ML20149M298)
- ML20149M300 + (ML20149M300)
- ML20149M302 + (ML20149M302)
- ML20149M303 + (ML20149M303)
- ML20149M305 + (ML20149M305)
- ML20149M307 + (ML20149M307)
- ML20149M309 + (ML20149M309)
- ML20149M311 + (ML20149M311)
- ML20149M313 + (ML20149M313)
- ML20149M314 + (ML20149M314)
- 0CAN129601, Forwards Response to Addl Info Re TS Change Request to Delete Reactor Coolant Pump Flywheel Insps + (ML20149M315)
- ML20149M317 + (ML20149M317)
- ML20149M318 + (ML20149M318)
- ML20149M321 + (ML20149M321)
- ML20149M322 + (ML20149M322)
- 05000259/LER-1988-008, :on 880120,surveillance Instruction,Which Tests Standby Gas Treatment Relative Humidity Heaters,Failed to Meet Tech Spec Testing Requirements.Caused by Inadequate Procedures.Surveillance Instruction Revised + (ML20149M323)
- ML20149M324 + (ML20149M324)
- ML20149M326 + (ML20149M326)
- IR 05000369/1988002 + (ML20149M328)
- ML20149M329 + (ML20149M329)
- ML20149M330 + (ML20149M330)
- ML20149M331 + (ML20149M331)
- IR 07100113/2012015 + (ML20149M332)
- ML20149M333 + (ML20149M333)
- ML20149M334 + (ML20149M334)
- ML20149M335 + (ML20149M335)
- ML20149M337 + (ML20149M337)
- ML20149M338 + (ML20149M338)
- ML20149M339 + (ML20149M339)
- ML20149M341 + (ML20149M341)
- ML20149M342 + (ML20149M342)
- ML20149M345 + (ML20149M345)
- ML20149M346 + (ML20149M346)
- IA-96-491, Oig Event Inquiry - NRC Failure to Adequately Regulate Millstone 1 - Case 95-77I - 951221 + (ML20149M347)
- ML20149M347 + (ML20149M347)
- IR 05000321/1988004 + (ML20149M348)
- SNRC-1416, Discusses Util Plans to Continue Effort for High Level of Performance,Including Actions Re post-work Housekeeping & Increased Supervisory Field Time,Lers & Technical Support, Per SALP Rept for Mar 1986 - Jul 1987 + (ML20149M349)
- ML20149M350 + (ML20149M350)
- ML20149M351 + (ML20149M351)
- ML20149M352 + (ML20149M352)
- ML20149M353 + (ML20149M353)
- PNO-I-88-022, on 880217,approx 2,400 Gallons of Slightly Contaminated Shower & Process Water Released to Restricted Area.Caused by 4-inch Plastic Pipe from Final Treatment Tank Breaking During Excavation to Obtain Fill Dirt + (ML20149M354)
- ML20149M355 + (ML20149M355)
- ML20149M356 + (ML20149M356)
- ML20149M358 + (ML20149M358)
- ML20149M360 + (ML20149M360)
- ML20149M361 + (ML20149M361)
- ML20149M362 + (ML20149M362)
- ML20149M363 + (ML20149M363)
- ML20149M364 + (ML20149M364)