- ML20148T289 + (ML20148T289)
- ML20148T291 + (ML20148T291)
- 05000454/LER-1997-012-04, :on 970529,required Plant to Be Shutdown within 48 H Per Ts.Caused by MSIV Active Train Not Being Repaired within 48 H.Four Way Valve Was Replaced + (ML20148T297)
- ML20148T298 + (ML20148T298)
- ML20148T302 + (ML20148T302)
- NSD-NRC-97-5201, Responds to 970606 Telcon Re AP600 Design Certification, Addl Level of Detail for SSAR Subsection 9.4 & Sys Diagrams, Key Issue One.Roadmap to Addl SSAR Revs Required to Support NRC Review of Subsection 9.4 & SSAR Markups Included + (ML20148T303)
- ML20148T309 + (ML20148T309)
- 05000454/LER-1996-019-05, :on 961015,insp Revealed That Silt Accumulations Exceeded Surveillance Acceptance Criteria. Caused by Silt Buildup.Silt Buildup Acceptance Criteria in Surveillance Has Been Revised + (ML20148T311)
- 05000282/LER-1997-007, :on 970429,both Trains of Spent Fuel Pool Special Ventilation Were Inoperable While Handling Load Over Spent Fuel.Caused by Misinterpretation of TS 3.8.D.3.Deleted TS Interpretation 3.8-3 & Revised Procedures + (ML20148T313)
- ML20148T317 + (ML20148T317)
- ML20148T320 + (ML20148T320)
- ML20148T322 + (ML20148T322)
- NG-97-1148, Forwards Second ten-year ISI Requests for Relief from Exam Requirements Determined to Be Impractical to Perform + (ML20148T324)
- NG-97-1081, Forwards Revised Relief Requests NDE-R018,PR-001,PR-002 & PR-005 & Addl Info in Response to RAI Re Third 10-yr Interval ISI Program & Associated Requests for Relief + (ML20148T328)
- 05000331/LER-1997-006, :on 970530,functional Test of Hpcis Steam Leak Detection Td Was Inadequate.Caused Because Functional Test Procedure Contained Incorrect Instruction.Revised Procedure & re-performed Functional Test + (ML20148T331)
- ML20148T337 + (ML20148T337)
- ML20148T341 + (ML20148T341)
- 05000461/LER-1997-003, :on 970128,failed to Recongnize Impact of Disconnecting Div 1 IRM Cable While Div 2 IRM Cable Was Disconnected Resulted in 2 Out of 4 RPS Actuation Being Satisfied.Caused by Personnel Error.Counseled Personnel + (ML20148T343)
- ML20148T344 + (ML20148T344)
- IA-78-225, Responds to 780825 FOIA Request & Forwards non-proprietary Portions of Proposal by Ebasco Svc,Inc,In Response to NRC RFP RS-77-44 Entitled Elec & Instru Tech & Codes Training + (ML20148T344)
- ML20148T348 + (ML20148T348)
- ML20148T353 + (ML20148T353)
- ML20148T354 + (ML20148T354)
- 05000285/LER-1997-005, :on 970530,improper Entry Into High Radiation Area Occurred.Caused by Lack of self-checking & Inattention to Detail.Discussed Event W/Plant Staff & Counseled Individual Involved + (ML20148T357)
- ML20148T358 + (ML20148T358)
- ML20148T361 + (ML20148T361)
- 05000302/LER-1997-011, :on 970529,pressure Locking of EFWS Isolation Valves Resulting in Potential for Interruption of EFW Flow to SG Occurred.Caused by Inadequate Calculation.Procedure for Preparation of Calculations Revised + (ML20148T375)
- ML20148T381 + (ML20148T381)
- ML20148T384 + (ML20148T384)
- ML20148T385 + (ML20148T385)
- ML20148T388 + (ML20148T388)
- ML20148T396 + (ML20148T396)
- ML20148T397 + (ML20148T397)
- ML20148T399 + (ML20148T399)
- ML20148T403 + (ML20148T403)
- ML20148T405 + (ML20148T405)
- ML20148T406 + (ML20148T406)
- ML20148T407 + (ML20148T407)
- IR 05000395/1987036 + (ML20148T410)
- ML20148T412 + (ML20148T412)
- ML20148T414 + (ML20148T414)
- ML20148T422 + (ML20148T422)
- ML20148T425 + (ML20148T425)
- ML20148T434 + (ML20148T434)
- ML20148T437 + (ML20148T437)
- ML20148T442 + (ML20148T442)
- ML20148T445 + (ML20148T445)
- ML20148T447 + (ML20148T447)
- ML20148T448 + (ML20148T448)
- ML20148T449 + (ML20148T449)
- 05000282/LER-1997-008-01, :on 970602,Unit 1 Reactor Trip Occurred.Caused by Electrical Ground in Rod Control Sys.Troubleshooting Activities Were Conducted + (ML20148T451)