MONTHYEARML20217F8231999-10-13013 October 1999 Informs That on 990930,NRC Completed mid-cycle PPR of Catawba Nuclear Station.Based on Review,Nrc Did Not Identify Any New Areas That Warranted More than Core Insp Program Over Next Five Months.Historical Listing of Issues,Encl ML20217H0041999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217F1301999-10-0707 October 1999 Forwards Rev 1 to Request for Relief 99-03 from Requirements of ASME B&PV Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting (Vg) Sys ML20212J3011999-10-0101 October 1999 Forwards Exemption from Certain Requirements of 10CFR54.17(c) Re Schedule for Submitting Application for Operating License Renewal.Se Also Encl ML20217K2651999-10-0101 October 1999 Forwards Retake Exams Repts 50-413/99-302 & 50-414/99-302 on 990921-23.Two of Three ROs & One SRO Who Received Administrative Section of Exam Passed Retake Exam, Representing 75 Percent Pass Rate 05000414/LER-1999-004, Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments1999-09-27027 September 1999 Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments 05000413/LER-1999-015, Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept1999-09-27027 September 1999 Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept ML20217A7911999-09-24024 September 1999 Forwards Insp Repts 50-413/99-05 & 50-414/99-05 on 990718- 0828 at Catawba Facility.Nine NCVs Identified Involving Inadequate Corrective Actions Associated with Degraded Svc Water Supply Piping to Auxiliary Feedwater Sys ML20212E6471999-09-24024 September 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for Catawba NPP & 990615.Informs That NRC Reviewed Response for Catawba & Concluded That All Requested Info Provided.Considers GL 98-01 to Be Closed for Catawba ML20212F0941999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals for Cns,Units 1 & 2 ML20212M2001999-09-20020 September 1999 Confirms 990913 Telcon Between M Purser & R Carroll Re Management Meeting to Be Conducted on 991026 in Atlanta,Ga to Discuss Operator Licensing Issues 05000414/LER-1999-005, Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments1999-09-20020 September 1999 Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20212B4641999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for Catawba Nuclear Station,Units 1 & 2 ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20212M1931999-09-13013 September 1999 Refers to 990909 Meeting Conducted at Region II Office Re Presentation of Licensee self-assessment of Catawba Nuclear Station Performance.List of Attendees & Licensee Presentation Handout Encl ML20212A3751999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementation Code Case for Duration of Insp Interval ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 05000413/LER-1999-014, Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment1999-09-0101 September 1999 Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment 05000414/LER-1999-003, Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev1999-08-31031 August 1999 Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev 0 of LER ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting 05000413/LER-1999-013, Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER1999-08-25025 August 1999 Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER ML20211M8191999-08-25025 August 1999 Confirms 990825 Telcon Between G Gilbert & R Carroll Re Mgt Meeting to Be Held on 990909 in Atlanta,Ga,To Allow Licensee to Present self-assessment of Catawba Nuclear Station Performance ML20211A9641999-08-20020 August 1999 Forwards SE Authorizing Licensee 990118 Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section XI for Plant,Units 2 ML20211C1191999-08-18018 August 1999 Forwards ISI Rept Unit 1 Catawba 1999 RFO 11, Providing Results of ISI Effort Associated with End of Cycle 11 ML20211B9471999-08-18018 August 1999 Forwards Request for Relief 99-02,associated with Limited Exam Results for Welds Which Were Inspected During Unit 1 End of Cycle 11 RFO ML20211C3651999-08-17017 August 1999 Forwards Rev 25 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program, Which Includes Reformatting of Manual & Addl Changes as Noted in Attached Summary of Changes ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 05000413/LER-1999-011, Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment1999-08-16016 August 1999 Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210V0321999-08-13013 August 1999 Forwards Insp Repts 50-413/99-04 & 50-414/99-04 on 990606- 0717.Six Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20210S2751999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210Q3751999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr as Listed,Thirty Days Before Exam Date,In Order to Register Individuals for Exam ML20210N9521999-08-0404 August 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual.Documents Constitutes Chapter 16 of Ufsar.With List of Effective Pages IR 05000413/19980131999-08-0202 August 1999 Discusses Integrated Insp Repts 50-413/98-13,50-414/98-13, 50-413/98-16,50-414/98-16 & NRC Special Repts 50/413/99-11 & 50-414/99-11 Conducted Between Aug 1998 & May 1999.Six Violations Occurred,Based on OI Investigation & Insp ML20210M6411999-07-29029 July 1999 Forwards Request for Relief 99-03 from Requirements of ASME Boiler & Pressure Vessel Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting Air (Vg) Sys 05000413/LER-1999-010, Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units1999-07-22022 July 1999 Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units IR 05000413/19990101999-07-22022 July 1999 Discusses Insp Rept 50-413/99-10 & 50-414/99-10 on 990314- 0424 & Forwards Notice of Violation Re Failure to Comply with TS 3.7.13,when Misalignment of Two Electrical Breakers Rendered SSS Inoperable from 981216-29 ML20217G5241999-07-20020 July 1999 Forwards Exam Repts 50-413/99-301 & 50-414/99-301 on 990524- 27,0603,07-10 & 16.Of Fourteen SRO & RO Applicants Who Received Written Exams & Operating Tests,Eight Applicants Passed & Six Failed Exam 05000413/LER-1999-009, Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept1999-07-19019 July 1999 Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept 05000414/LER-1999-001, Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed1999-07-15015 July 1999 Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed ML20209H4431999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for May 1999 on Unit Shutdowns Also Encl ML20210A5771999-07-14014 July 1999 Forwards Revsied Catawba Nuclear Station Selected Licensee Commitments Manual, Per 10CFR50.71(e),changing Sections 16.7-5,16.8-5,16.9-1,16.9-3,16.9-5 & 16.11-7.Manual Constitute Chapter 16 of UFSAR ML20216D3941999-07-14014 July 1999 Forwards Revs to Catawba Nuclear Station Selected Licensee Commitments Manual NUREG-1431, Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation1999-07-0909 July 1999 Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196L0371999-07-0808 July 1999 Approves Requested Schedule Change of Current two-year Requalification Examinations to non-outage dates.Two-year Cycle Will Start on 991001 & Will End on 020930 05000413/LER-1999-008, Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach1999-07-0808 July 1999 Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach ML20196J9001999-07-0606 July 1999 Informs That 990520 Submittal of Rept DPC-NE-3004-PA,Rev 1, Mass & Energy Release & Containment Response Methodology, Marked Proprietary Will Be Withheld Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 IR 05000413/19990031999-07-0101 July 1999 Discusses Insp Repts 50-413/99-03 & 50-414/99-03 Completed on 990605 & Transmitted by Ltr .Results of Delibrations for Violation Re Discovery of Potentially More Limiting Single Failure Affecting SGTS Analysis Provided 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217H0041999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217F1301999-10-0707 October 1999 Forwards Rev 1 to Request for Relief 99-03 from Requirements of ASME B&PV Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting (Vg) Sys 05000414/LER-1999-004, Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments1999-09-27027 September 1999 Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments 05000413/LER-1999-015, Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept1999-09-27027 September 1999 Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept 05000414/LER-1999-005, Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments1999-09-20020 September 1999 Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20212B4641999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for Catawba Nuclear Station,Units 1 & 2 ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 05000413/LER-1999-014, Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment1999-09-0101 September 1999 Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment 05000414/LER-1999-003, Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev1999-08-31031 August 1999 Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev 0 of LER ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting 05000413/LER-1999-013, Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER1999-08-25025 August 1999 Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER ML20211B9471999-08-18018 August 1999 Forwards Request for Relief 99-02,associated with Limited Exam Results for Welds Which Were Inspected During Unit 1 End of Cycle 11 RFO ML20211C1191999-08-18018 August 1999 Forwards ISI Rept Unit 1 Catawba 1999 RFO 11, Providing Results of ISI Effort Associated with End of Cycle 11 ML20211C3651999-08-17017 August 1999 Forwards Rev 25 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program, Which Includes Reformatting of Manual & Addl Changes as Noted in Attached Summary of Changes ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 05000413/LER-1999-011, Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment1999-08-16016 August 1999 Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210S2751999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210N9521999-08-0404 August 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual.Documents Constitutes Chapter 16 of Ufsar.With List of Effective Pages ML20210M6411999-07-29029 July 1999 Forwards Request for Relief 99-03 from Requirements of ASME Boiler & Pressure Vessel Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting Air (Vg) Sys 05000413/LER-1999-010, Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units1999-07-22022 July 1999 Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units 05000413/LER-1999-009, Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept1999-07-19019 July 1999 Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept 05000414/LER-1999-001, Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed1999-07-15015 July 1999 Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed ML20216D3941999-07-14014 July 1999 Forwards Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20209H4431999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for May 1999 on Unit Shutdowns Also Encl ML20210A5771999-07-14014 July 1999 Forwards Revsied Catawba Nuclear Station Selected Licensee Commitments Manual, Per 10CFR50.71(e),changing Sections 16.7-5,16.8-5,16.9-1,16.9-3,16.9-5 & 16.11-7.Manual Constitute Chapter 16 of UFSAR 05000413/LER-1999-008, Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach1999-07-0808 July 1999 Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach ML20196G7461999-06-22022 June 1999 Requests Exemption from Requirements of 10CFR54.17(c) That Application for Renewed Operating License Not Be Submitted to NRC Earlier than 20 Yrs Before Expiration of Operating License Currently in Effect ML20196E9541999-06-18018 June 1999 Forwards SG Tube Insp Conducted During Unit 1 End of Cycle 11 Refueling Outage.Attachments 1,2,3 & 4 Identify Tubes with Imperfections in SGs A,B,C & D,Respectively ML20195K4571999-06-14014 June 1999 Forwards MORs for May 1999 & Revised MORs for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20195J1691999-06-10010 June 1999 Forwards Written Documentation of Background & Technical Info Supporting Catawba Unit 1,notice of Enforcement Discretion Request Re TS 3.5.2 (ECCS-Operating),TS 3.7.12 (Auxiliary Bldg Filtered Ventilation Exhaust Sys) ML20217G5771999-06-0909 June 1999 Forwards Post Exam Comments & Supporting Reference Matls for Written Exams Administered at Catawba Nuclear Station on 990603 05000414/LER-1999-002, Forwards Abstract of LER 99-002-00 Re Forced Shutdown of Plant as Result of Flow Restriction Caused by Corrosion of Afs Assured Suction Source Piping Due to Inadequate Testing. Final LER Will Be Submitted No Later than 9907081999-06-0303 June 1999 Forwards Abstract of LER 99-002-00 Re Forced Shutdown of Plant as Result of Flow Restriction Caused by Corrosion of Afs Assured Suction Source Piping Due to Inadequate Testing. Final LER Will Be Submitted No Later than 990708 ML20207F2381999-06-0101 June 1999 Forwards Copy of Catawba Nuclear Station Units 1 & 2 1998 10CFR50.59 Rept, for NRC Files ML20195J1131999-05-26026 May 1999 Requests Approval to Change Cycle Dates for Two Year Requalification Training Program Required by 10CFR55.59,to Improve Scheduling of Requalification Exams to non-outage Periods 05000413/LER-1999-007, Forwards LER 99-007-00,re Operation Prohibited by TS 3.4.7. Commitments Identified in LER Are Listed in Planned Corrective Actions Section1999-05-26026 May 1999 Forwards LER 99-007-00,re Operation Prohibited by TS 3.4.7. Commitments Identified in LER Are Listed in Planned Corrective Actions Section ML20195B4751999-05-24024 May 1999 Forwards Rev 7 to UFSAR Chapter 2 & Chapter 3 from 1998 UFSAR for Catawba Nuclear Station.List of Instructions on Insertion Encl ML20196L1851999-05-20020 May 1999 Forwards Proprietary & non-proprietary Version of Rev 1 to TR DPC-NE-3004, Mass & Energy Release & Containment Response Methodology, Consisting of Finer Nodalization of Ice Condenser Region.Proprietary Info Withheld ML20196L1791999-05-20020 May 1999 Communicates Util Licensing Position Re Inoperable Snubbers. Licensee Has Determined That Structure of ITS Has Resulted in Certain Confusion Re Treatment of Inoperable Snubbers 05000413/LER-1997-009, Forwards LER 97-009-02, Unanalyzed Postulated Single Failure Affecting SG Tube Rupture Analysis, Suppl Revises Planned C/A Described in Suppl 1 to Ler.Current Status of C/As & Addl C/As Planned,Provided in Rept1999-05-17017 May 1999 Forwards LER 97-009-02, Unanalyzed Postulated Single Failure Affecting SG Tube Rupture Analysis, Suppl Revises Planned C/A Described in Suppl 1 to Ler.Current Status of C/As & Addl C/As Planned,Provided in Rept ML20206T4481999-05-13013 May 1999 Forwards Rev 3 to Topical Rept DPC-NE-3002-A, UFSAR Chapter 15 Sys Transient Analysis Methodology, IAW Guidance Contained in NUREG-0390 ML20206R1721999-05-13013 May 1999 Forwards Monthly Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 & Revised Monthly Operating Repts for Mar 1999 ML20206T0281999-05-12012 May 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual. Document Constitutes Chapter 16 of UFSAR 05000413/LER-1999-006, Forwards LER 99-006-00,re CR Ventilation Sys Inoperability. Root Cause & Corrective Actions for Occurence Are Being Finalized & Will Be Reported in Supplement Rept on 9906071999-05-10010 May 1999 Forwards LER 99-006-00,re CR Ventilation Sys Inoperability. Root Cause & Corrective Actions for Occurence Are Being Finalized & Will Be Reported in Supplement Rept on 990607 ML20206N8201999-05-10010 May 1999 Forwards Revs 15 & 16 to Catawba Unit 1 Cycle 12 COLR, Per TS 5.6.5.Rev 15 Updates Limits for New Catawba 1 Cycle 12 Reload Core & Rev 16 Revises Values Re Min Boron Concentrations for Rwst,Cla & SFP ML20206J4431999-05-0303 May 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual, Per 10CFR50.71(e).Document Constitutes Chapter 16 of UFSAR ML20206D2141999-04-29029 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Catawba Nuclear Station,Units 1 & 2, Per Plant TS 5.6.3. Rept Contains Listed Documents ML20206E4101999-04-26026 April 1999 Forwards Four Copies of Rev 9 Todpc Nuclear Security & Contingency Plan,Per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 1999-09-08
[Table view] |
Text
I*
hike Ft>ue Company illulwR hhDwn JR ;
- s Cat!pbaNudearGenerationSpr!nwn! \ ice hesidad =
48@ Conc <ud th>ad (8M)831J2M Offsce York, SC3745 (8!)3)83135Far l
- DUKEPOWsTR -
June 23, _1997 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk ,
Washington, D.C. 20555 )
I
Subject:
Catawba Nuclear Station Dockets 50-413 and 50-414 Reply to Notice of Violation (NOV) l Inspection Report 50-413, 414/97-07 ;
l Attached is Duke Energy Corporation's response to the two l (2) Level IV violations cited in Inspection Report 50-413, l 414/97-07 dated May 23, 1997. These violations were '
identified during inspections conducted between March 23, 1997, through April 26, 1997. l I
If there are any questions concerning this response, please contact K. E. Nicholson at (803) 831-3237. ;
Sincerely,
~
W. R. McCollum, .
.\ KEN: RESP 9707. DOC xc: L. A. Reyes, Regional Administrator P. S. Tam, ONRR R. J. Freudenberger, SRI ;
r
/ l fi
/
9707090091 970623 PDR ADOCK 05000413-G PDR
).lj ,
L.
CATAWBA NUCLEAR CTATION
, . REPLY TO NOTICE OF VIOLATION 413, 414/97-07-01 l
Notice of Violation I
Technical Specification 6.8.1 requires that written procedures be established, implemented, and maintained covering the activities recommended in Appendix A of Regulatory Guide (RG) 1.33, revision
- 2. As referenced, this includes procedures for the performance of testing. Implicit in this requirement is the stipulation that ;
the procedures be adequate for the circumstances. !
Contrary to the above, on April 8, 1997, procedure '
PT/2/A/4200/01T, Containment Penetration Valve Injection Water l System Performance Test, was inadequate in that procedure enclosures 13.3.1, 13.4.1, 13.21.1, and 13.22.1 directed operators to improperly sequence the valve manipulations to isolate containment penetrations M217, M218, M355, and M376 to ,
support testing of component cooling water system containment isolation valves. Improper sequencing of valves to isolate and :
drain the containment penetrations resulted in loss of inventory of the cooling supply to the Unit 2 spent fuel pool cooling .
system. >
This is a Severity Level IV vi01ation (Supplement I) .
E e
l 4
i i
l Page 1 of 3
7 ,
l t
l CATAWBA NUCLEAR CTATION ;
REPLY TO NOTICE CF VIOLATION ,
- 413, 414/97-07-01 Notice of Violation a
Technical Specification 6.8.1 requires that written procedures be established, implemen ted, and maintained covering the activities recommended in Appendix A of Regulatory Guide (RG) 1.33, revision !
- . As referenced, this includes procedures Eor the performance of testing. 2mplicit in this requirement is the stipulation that the proceduras be adequate for the circumstances. l Contrary to the above, on April 8, 1997, procedure PT/2/A/4:00/01T, Containment Peretra tion Valve Injection Water l
System Performance Test, was inadequate in that procedure }
enclosures 13.3.1, 13.4.1, 13.21.1, and 13.22.1 directed operators to improperly sequence the valve manipulations to :
isolate containment penetrations M217, M218, M355, and M376 to support testing of component cooling water system containment isolation valves. Improper sequencing af valves to isolate and drain the containment penetrations resulted in loss of inventory of the cooling supply to the Unit 2 spen t fuel pool cooling
? system.
. This is a Severity Level IV violation (Supplement I) . l l
1 f
l I
t Page 1 of 3 t _. _
4
- CATAWBA NUCLEAR STATION l
REPLY TO NOTICE OF VIOLATION l 413, 414/97-07-01 I
l 3. Corrective Action to be Taken to Avoid Future Violations l
Other Operations procedures which havn been converted from l the Engineering format to the Operations format and have not l been successfully performed under the new format, will This receive formal validation of the technicai adequacy.
, commitment will be tracked as corrective action 1 in PIP 2-C97-1090 and will be completed by 10/05/97.
The purpose and importance of pursuing the " validation and l verification" aspects of Qualification, Validation, and i Verification (QV&V) when questions are raised during job performance, which will include reference to the requirement i to "stop work when outside the box" as defined by the six '
tools for flawless human performance will be re-emphasized j to all Operations personnel. This commitment will be
~
tracked as corrective action 2 in PIP 2-C97-1090 and will be completed by 10/05/97.
i The requirements and guidelines for draining systems as contained in Catawba Nuclear Site Directive (CNSD) 2.4.6 and i in the 2EOC8 Radwaste Chemistry Outage Memorandum regarding ,
drain evolutions will be re-emphasized to all Operations personnel. This commitment will be tracked as corrective action 3 in PIP 2-C97-1090 and will be completed by 10/05/97.
Operations will review the expectations for a pre-job briefing to ensure an appropriate level of detail for those This commitment will be tracked as briefings exists.
corrective action 4 in PIP 2-C97-1090 and will be completed by 10/05/97.
- 4. Date of Full Compliance Duke Energy Corporation is now in full compliance.
Page 3 of 3
l 1
CATAWBA NUCLEAR STATION j REPLY TO NOTICE OF VI@LATION l 413, 414/97-07-01
- 1. Reason for Violation Duke Energy Corporation acknowledges this violation. This violation is attributed to an inadequate procedure which occurred when incorrect information contained in the Unit 1 Engineering procedure was converted into the Operations format. This information was not validated prior to creating both a Unit 1 and a Unit 2 Operations procedure. Thus, PT/2/A/4200/OlT (Containment Penetration Valve Injection Water System Performance Test) provided incorrect valve manipulation sequences for each of the four component cooling (KC) containment penetrations. The procedure specifically directed the operators to open the inside containment drains prior to isolating the penetration. This created four, three-quarter inch flowpaths from the KC reactor building header to the containment floor and equipment sumps.
- 2. Corrective Actions Taken and Results Achieved The KC system continued to drain until the KC surge tank low-low level setpoint was reached which automatically isolated the reactor building and auxiliary building non-essential headers. This automatic action isolated the KC penetrations, thereby terminating the loss of KC inventory.
The operators secured the 2A spent fuel pool cooling (KF) pump due to loss of KC cooling to the KF pump motor. ;
The operators entered AP/2/A/5500/21 (Loss of Component Cooling) and initiated makeup to the KC surge tank.
The valves opened to allow the inadvertent draining were closed and the auxiliary building non-essential KC valves werc opened to allow restart of the 2A KF pump to restore spent fuel pool cooling.
Operations initiated Problem Investigation Process (PIP) 2-C97-1090 to capture the details of this event.
PT/2/A/4200/0lT and PT/1/A/4200/0lT which was also in error were revised to isolate the KC non-essential headers prior to draining the penetration. This was completed by the Change #44, Approved 04/15/97 on Unit 1, and Change #52, Approved 04/08/97 on Unit 2.
l l
Page 2 of 3
_ _ _ . .=- -__ . _ _ _ _ _ _ _ , _ _ _ _ - _ _ _ _ . _ _ _ . . . . .
CATAWBA NUCLEAR STATION REPLY TO NOTICE OF VIOLATION l 413, 414/97-07-05 Notice of Violation I Tecanical Specifica tion, Section 6.8.1.1, requires written procedures be established, implemented, and maintained covering the Fire Protection Program implementation.
The Quality Assurance program for fire protection is incorporated into the Duke Topical Report, Quality Assurance Program. Topical Report Section 17.3.1.6, Corrective Action, states that Duke Power has established a corrective action process whereby all i personnel are to assure conditions adverse to quality are i promptly iden tified, controlled, and corrected. In addition, I Topical Report Section 17.3.2.13, Corrective Action, requires conditions adverse to quality be corrected, .the cause of the i condition determined, and action be taken to preclude repetition. l i
Contrary to the above, the suction screens for two of the three !
fire pumps were removed for repairs in 1991 and appropriate ,
corrective action was not taken to restore the filter screens to '
meet the original design configura tion . Specifically, the }
-suction screens were not properly installed in the suction pit l screen frame resulting in an area approximatsly 7 % x 11 feet at '
the base of the succion pit not being provided with protection to prevent raw lake water debris from entering the suction pit for two of the three fire pumps.
This is a Severity Level IV violation (Supplement I) .
l
)
1 I
l
! l
! 1 Page 1 of 3 i
- l. _ . 1
- _-~ - - . ._ .- .- .
CATAWBA NUCLEAR CTATION
, - REPLY TO NOTICE OF VIOLATION 413, 414/97-07-05 !
r I 1. Reason for Violation i Duke Energy Corporation acknowledges this violation. This violation occurred as a result of failure to take prompt ,
corrective actions to assure conditions adverse to quality [
were controlled and corrected.
l On December 6, 1990, Engineering found the fire pump suction screens in a degraded condition and promptly wrote a Problem Identification Report (PIR) 0-C90-0357. The PIR system was )
the tracking tool (paper system) in use to document i conditions adverse to quality to ensure corrective actions were taken to correct the deficiency. An operability evaluation was completed on December 10, 1990, which l concluded that Fire Pumps "A" and "B" were operable without '
the screens in place.
i On January 30, 1991, minor modification CE-3197 and associated Work Requests (WR) 3946NSM and WR 4192MES were originated to modify, refurbish, and replace the screens.
The work request system in use at that time was also a paper -
tracking tool. Shortly thereafter, the hand-written work requests were placed into the Work Management System (WMS),
an electronic tracking system, and tracked as WR 91001140 ,
and WR 91002443. These WRs remained in the planning phase until March 25, 1992. On April 21, 1992, the WRs were placed on hold awaiting parts. From the planning phase to {
the time the WRs were placed on hold, other work items necessary for the implementation of the modification were e being completed, which included blasting, coating, and fabrication of non-stock items. On January 27, 1994, these l WRs were placed on the schedule and the actual work began on March 14, 1994. Another hold was placed on this work on September 7, 1994 for parts; work commenced again on December 13, 1994. Although the screens had been modified and refurbished in 1994, the electronic documentation in WMS indicated the screens had been installed incorrectly. It was further documented that a lifting device used for the refurbishment had to be located in order to properly reinstall the screens. Although no actual work was performed on the screens once the WMS identified that the screens had been installed, resources were devoted to locate or re-fabricate the lifting device in order to correctly re-install the screens. When the modification was documented as " labor complete" on April 17, 1995, the item no longer appeared as a backlog in WMS. This is attributed to the ;
set-up of the WMS in that it does not recognize outstanding I work once WOs are changed to a " labor complete" status.
Page 2 of 3 l
i
CATAWBA NUCLEAR STATION
- REPLY TO NOTICE OF VIOLATION 413, 414/97-07-05 In March of 1997, while preparing for the announced fire
. protection inspection, the fire protection engineer self-identified this condition which ~ is documented in Problem :
Identification Process (PIP) 0-C97-1149. ,
i
- 2. Corrective Actions Taken and Results Achieved j i
The screens were properly installed to meet the original design requirements on May 17, 1997. ,
Resources within Work Control have been focused on the ,
overall number and age of outstanding work orders to reduce ;
the backlog. The total number of work orders (innage and !
outage) greater than one year old decreased from 652 on April 3, 1997, to 272 on June 23, 1997. Resources will i continue to be devoted to reducing the overall backlog in order to achieve an internal goal of no innage corrective ;
work orders greater than 180 days old remaining in the WMS. '
- 3. Corrective Actio:a to be Taken to Avoid Future Violations No additional corrective actions will be taken. :
- 4. Date of Full Compliance l Duke Energy Corporation is now in full compliance. l t
t
?
l Page 3 of 3 i
-