ML20148T348

From kanterella
Jump to navigation Jump to search
Forwards LER 97-003-01 Re Failure to Recognize Impact of Disconnecting Div 1 Intermediate Range Monitor (IRM) Cable While Div 2 IRM Cable Disconnected,Results in 2-out-of-4 Reactor Protection Sys Actuation Logic Being Satisfied
Date released: 06/10/2020 Download: ML20148T348


:on 970128,failed to Recongnize Impact of Disconnecting Div 1 IRM Cable While Div 2 IRM Cable Was Disconnected Resulted in 2 Out of 4 RPS Actuation Being Satisfied.Caused by Personnel Error.Counseled Personnel
ML20148T343
Person / Time
Site: Clinton 
Issue date: 07/01/1997
From: Wattles R
ILLINOIS POWER CO.
To:
References
Download: ML20148T343 (5)