Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20148T189 + (ML20148T189)
- ML20148T191 + (ML20148T191)
- ML20148T196 + (ML20148T196)
- ML20148T202 + (ML20148T202)
- 05000423/LER-1997-033, :on 970527,P-6 Bistable Reset Function Was Set non-conservatively Resulting in TS Violation.Cause Is Indeterminate.Intermediate Range Neutron Flux Will Be Brought Into Compliance W/Ts + (ML20148T209)
- ML20148T212 + (ML20148T212)
- ML20148T217 + (ML20148T217)
- ML20148T221 + (ML20148T221)
- ML20148T224 + (ML20148T224)
- ML20148T226 + (ML20148T226)
- ML20148T229 + (ML20148T229)
- ML20148T231 + (ML20148T231)
- ML20148T235 + (ML20148T235)
- IA-97-204, Forwards Shell of Completion Review Rept Based Upon Recently Completed Final Completion Review Rept for Remedial Action at Shiprock U Mill Tailings Site at Shiprock,Nm & Summary of Standardized Format + (ML20148T235)
- ML20148T242 + (ML20148T242)
- ML20148T249 + (ML20148T249)
- ML20148T257 + (ML20148T257)
- ML20148T261 + (ML20148T261)
- ML20148T262 + (ML20148T262)
- ML20148T265 + (ML20148T265)
- ML20148T281 + (ML20148T281)
- ML20148T286 + (ML20148T286)
- ML20148T289 + (ML20148T289)
- ML20148T291 + (ML20148T291)
- 05000454/LER-1997-012-04, :on 970529,required Plant to Be Shutdown within 48 H Per Ts.Caused by MSIV Active Train Not Being Repaired within 48 H.Four Way Valve Was Replaced + (ML20148T297)
- ML20148T298 + (ML20148T298)
- ML20148T302 + (ML20148T302)
- NSD-NRC-97-5201, Responds to 970606 Telcon Re AP600 Design Certification, Addl Level of Detail for SSAR Subsection 9.4 & Sys Diagrams, Key Issue One.Roadmap to Addl SSAR Revs Required to Support NRC Review of Subsection 9.4 & SSAR Markups Included + (ML20148T303)
- ML20148T309 + (ML20148T309)
- 05000454/LER-1996-019-05, :on 961015,insp Revealed That Silt Accumulations Exceeded Surveillance Acceptance Criteria. Caused by Silt Buildup.Silt Buildup Acceptance Criteria in Surveillance Has Been Revised + (ML20148T311)
- 05000282/LER-1997-007, :on 970429,both Trains of Spent Fuel Pool Special Ventilation Were Inoperable While Handling Load Over Spent Fuel.Caused by Misinterpretation of TS 3.8.D.3.Deleted TS Interpretation 3.8-3 & Revised Procedures + (ML20148T313)
- ML20148T317 + (ML20148T317)
- ML20148T320 + (ML20148T320)
- ML20148T322 + (ML20148T322)
- NG-97-1148, Forwards Second ten-year ISI Requests for Relief from Exam Requirements Determined to Be Impractical to Perform + (ML20148T324)
- NG-97-1081, Forwards Revised Relief Requests NDE-R018,PR-001,PR-002 & PR-005 & Addl Info in Response to RAI Re Third 10-yr Interval ISI Program & Associated Requests for Relief + (ML20148T328)
- 05000331/LER-1997-006, :on 970530,functional Test of Hpcis Steam Leak Detection Td Was Inadequate.Caused Because Functional Test Procedure Contained Incorrect Instruction.Revised Procedure & re-performed Functional Test + (ML20148T331)
- ML20148T337 + (ML20148T337)
- ML20148T341 + (ML20148T341)
- 05000461/LER-1997-003, :on 970128,failed to Recongnize Impact of Disconnecting Div 1 IRM Cable While Div 2 IRM Cable Was Disconnected Resulted in 2 Out of 4 RPS Actuation Being Satisfied.Caused by Personnel Error.Counseled Personnel + (ML20148T343)
- ML20148T344 + (ML20148T344)
- IA-78-225, Responds to 780825 FOIA Request & Forwards non-proprietary Portions of Proposal by Ebasco Svc,Inc,In Response to NRC RFP RS-77-44 Entitled Elec & Instru Tech & Codes Training + (ML20148T344)
- ML20148T348 + (ML20148T348)
- ML20148T353 + (ML20148T353)
- ML20148T354 + (ML20148T354)
- 05000285/LER-1997-005, :on 970530,improper Entry Into High Radiation Area Occurred.Caused by Lack of self-checking & Inattention to Detail.Discussed Event W/Plant Staff & Counseled Individual Involved + (ML20148T357)
- ML20148T358 + (ML20148T358)
- ML20148T361 + (ML20148T361)
- 05000302/LER-1997-011, :on 970529,pressure Locking of EFWS Isolation Valves Resulting in Potential for Interruption of EFW Flow to SG Occurred.Caused by Inadequate Calculation.Procedure for Preparation of Calculations Revised + (ML20148T375)
- ML20148T381 + (ML20148T381)
- ML20148T384 + (ML20148T384)