Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20148R662 + (ML20148R662)
- ML20148R663 + (ML20148R663)
- ML20148R664 + (ML20148R664)
- IR 05000213/1987029 + (ML20148R673)
- ML20148R680 + (ML20148R680)
- ML20148R684 + (ML20148R684)
- 05000327/LER-1988-015, :on 880317,Tech Spec Surveillance Requirement Not Completely Incorporated Into Implementing Procedure. Caused by Incomplete Procedure Review.Surveillance Instruction 410.2 Revised + (ML20148R687)
- 05000304/LER-1988-002-08, :on 880312,discovered That Setpoint for Three Main Steam Safety Valves Exceeded Tolerance Limit.Caused by Difference in Maint Procedure Acceptance Criteria.Procedure Revised & Valves Retested & Reset + (ML20148R691)
- 05000364/LER-1987-010, :on 871209,leak Discovered in Section of Safety Injection Piping on RCS Loop B Cold Leg.Caused by Defect in Welded Joint Between Long Radius Elbow & Straight Section of Pipe.Cooldown Commenced + (ML20148R696)
- ML20148R697 + (ML20148R697)
- 05000328/LER-1988-003, :on 880119,discovered Ice Buildup in Flow Passage of Ice Condenser.Caused by Failure to Convert Original Design Requirements Into Verifiable,Repeatable Surveillance Requirements.Condenser Defrosted + (ML20148R701)
- 05000328/LER-1988-005, :on 880212,smoke Discovered Coming from Speed Increaser Unit for Centrifugal Charging Pump 2A-A.Caused by Bolts Backing Out Due to Lack of Periodic Adjustments.Speed Increaser Lube Oil Pump 2A-A CCP Replaced + (ML20148R706)
- ML20148R710 + (ML20148R710)
- ML20148R711 + (ML20148R711)
- ML20148R712 + (ML20148R712)
- ML20148R715 + (ML20148R715)
- IR 05000282/1987017 + (ML20148R717)
- ML20148R723 + (ML20148R723)
- ML20148R734 + (ML20148R734)
- ML20148R735 + (ML20148R735)
- JAFP-88-0351, Monthly Operating Rept for Mar 1988 + (ML20148R737)
- ML20148R738 + (ML20148R738)
- ML20148R740 + (ML20148R740)
- ML20148R744 + (ML20148R744)
- IR 05000566/1978006 + (ML20148R746)
- ML20148R747 + (ML20148R747)
- ML20148R748 + (ML20148R748)
- ML20148R751 + (ML20148R751)
- ML20148R752 + (ML20148R752)
- ML20148R758 + (ML20148R758)
- ML20148R759 + (ML20148R759)
- ML20148R762 + (ML20148R762)
- ML20148R765 + (ML20148R765)
- IR 05000454/1988006 + (ML20148R768)
- ML20148R771 + (ML20148R771)
- ML20148R772 + (ML20148R772)
- ML20148R776 + (ML20148R776)
- IR 05000346/1987027 + (ML20148R777)
- ML20148R783 + (ML20148R783)
- IR 05000254/1997007 + (ML20148R784)
- ML20148R786 + (ML20148R786)
- ML20148R787 + (ML20148R787)
- ML20148R795 + (ML20148R795)
- ML20148R801 + (ML20148R801)
- ML20148R807 + (ML20148R807)
- IR 05000498/1987077 + (ML20148R813)
- ML20148R820 + (ML20148R820)
- 05000424/LER-1987-076, :on 871127,instrument Panel 1-1513-P5-HMA Inoperable for More than 7 Days.Caused by Personnel Error. Personnel Counseled on Control & Temporary Storage of Matls During in-process Work + (ML20148R823)
- ML20148R825 + (ML20148R825)
- NRC-88-0004, Application for Amend to License NPF-43,changing Tech Spec Section 3/4.6.3 to Add Two Existing Automatic Primary Containment Isolation Valves for Primary Containment Radiation Monitor + (ML20148R830)
- ML20148R833 + (ML20148R833)