Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20148E147 + (ML20148E147)
- ML20148E150 + (ML20148E150)
- ML20148E151 + (ML20148E151)
- ML20148E155 + (ML20148E155)
- ML20148E156 + (ML20148E156)
- ML20148E158 + (ML20148E158)
- ML20148E162 + (ML20148E162)
- ML20148E167 + (ML20148E167)
- ML20148E173 + (ML20148E173)
- ML20148E177 + (ML20148E177)
- ML20148E178 + (ML20148E178)
- ML20148E181 + (ML20148E181)
- ML20148E183 + (ML20148E183)
- ML20148E184 + (ML20148E184)
- ML20148E185 + (ML20148E185)
- ML20148E187 + (ML20148E187)
- ML20148E188 + (ML20148E188)
- ML20148E190 + (ML20148E190)
- ML20148E191 + (ML20148E191)
- 05000366/LER-1978-053, Forwards LER 78-053/03L-0 + (ML20148E192)
- ML20148E193 + (ML20148E193)
- ML20148E195 + (ML20148E195)
- ML20148E196 + (ML20148E196)
- ML20148E197 + (ML20148E197)
- 05000366/LER-1978-053-03, /03L-0:on 781016,RPS Channel a Found to Be Inoperative W/Reactor in Run Mode While Performing Procedure HNP-2-3054.Caused by Instrument Drift on APRM E Lack of LPRM Inputs on APRM A. Readjustments Made + (ML20148E198)
- ML20148E201 + (ML20148E201)
- ML20148E205 + (ML20148E205)
- 05000313/LER-1978-028, Forwards LER 78-028/03L-0 + (ML20148E207)
- ML20148E209 + (ML20148E209)
- 05000313/LER-1978-028-03, /03L-0:on 780929,leak Developed in Casing Drain Line from Discharge of Makeup Pump P36C Upstream of Valve ABD-9C.Caused by Crack in Pipe Nipple Threaded Into Pump Casing Due to Apparent Overstressing in Installation + (ML20148E213)
- 05000395/LER-1997-002, :on 970426,turbine Trip & Feedwater Isolation Occurred.Caused by Hi-Hi Level in Steam Generator C Signal. Verified Sys Integrity & Proper Plant Response & Initiated Plant Restart + (ML20148E214)
- ML20148E216 + (ML20148E216)
- ML20148E217 + (ML20148E217)
- ML20148E218 + (ML20148E218)
- ML20148E220 + (ML20148E220)
- ML20148E226 + (ML20148E226)
- ML20148E230 + (ML20148E230)
- ML20148E232 + (ML20148E232)
- ML20148E233 + (ML20148E233)
- ML20148E235 + (ML20148E235)
- ML20148E236 + (ML20148E236)
- ML20148E238 + (ML20148E238)
- ML20148E239 + (ML20148E239)
- HL-5398, Provides Requested Clarification Re Unit 1 RPV Matl Surveillance Rept & Subsequent TS Rev Request for Unit 1 P/T Limit Curves.Explanation for Values Provided in Matl Surveillance Rept & Sample Calculations Encl + (ML20148E240)
- ML20148E242 + (ML20148E242)
- IR 05000416/1997005 + (ML20148E244)
- ML20148E244 + (ML20148E244)
- ML20148E245 + (ML20148E245)
- PNO-I-97-032, on 970529,BG&E Declared Unusual Event Due to RCS Leakage in Excess of TS Limits,Requiring Unit Shutdown. Bg&E Conducting Investigation of Event.Containment Damage Assessment & Cleanup Initiated.State of MD Notified + (ML20148E252)
- ML20148E258 + (ML20148E258)
- 05000313/LER-1978-025-03, /03L-0:on 780917,control Rod Index Reached Restricted Zone W/Worst Case Condition at 171% Withdrawn at 90% Power.Caused by Miscalculated Boron Addition to Rcs. Acceptable Rod Positions Obtained within 2 H + (ML20148E259)