Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20148A488 + (ML20148A488)
- ML20148A489 + (ML20148A489)
- ML20148A492 + (ML20148A492)
- ML20148A493 + (ML20148A493)
- ML20148A496 + (ML20148A496)
- ML20148A498 + (ML20148A498)
- ML20148A500 + (ML20148A500)
- 05000298/LER-1978-030-03, /03L-0:on 780815,13 Primary Containment Penetrations Not Leak Tested.Caused by Penetrations Not Identified During Preoperational Testing.Penetrations Will Be Added to Tech Spec Table 3.7.2 & Will Be Tested + (ML20148A501)
- ML20148A503 + (ML20148A503)
- ML20148A506 + (ML20148A506)
- ML20148A507 + (ML20148A507)
- ML20148A516 + (ML20148A516)
- 05000267/LER-1978-030-03, /03L-0:on 780912,five Hydraulic Snubbers Found Inoperable.Caused by Empty Oil Reservoirs.Reservoirs Filled & Surveillance Interval Adjusted + (ML20148A518)
- 05000424/LER-1987-072, :on 871121,Tech Spec Surveillance Re Readings from Plant Safety Monitoring Sys Data Displays Inadequately Performed.Caused by Inadequate Training of Auxiliary Plant Operator.Training Will Be Enhanced + (ML20148A522)
- ML20148A524 + (ML20148A524)
- ML20148A525 + (ML20148A525)
- ML20148A531 + (ML20148A531)
- PNO-IV-97-026A, on 970507,shutdown Greater than 72 H After Manual Scram Update Made.Workers Removing Fire Seal Matl from Penetration in Turbine Bldg to Run Addl Cable Through Penetration in Accordance W/Authorized Station Mod + (ML20148A532)
- ML20148A533 + (ML20148A533)
- ML20148A535 + (ML20148A535)
- B16360, Submits Corrections to 1993 Annual Rept for Unit 3, Describing Changes Made,Per 10CFR50.59 & Section 6.9.1.2 of App a to License NPF-49 + (ML20148A537)
- ML20148A539 + (ML20148A539)
- ML20148A540 + (ML20148A540)
- ML20148A541 + (ML20148A541)
- ML20148A543 + (ML20148A543)
- ML20148A547 + (ML20148A547)
- ML20148A549 + (ML20148A549)
- ML20148A550 + (ML20148A550)
- ML20148A554 + (ML20148A554)
- ML20148A555 + (ML20148A555)
- ML20148A556 + (ML20148A556)
- ML20148A557 + (ML20148A557)
- IR 05000334/1988001 + (ML20148A558)
- ML20148A560 + (ML20148A560)
- ML20148A562 + (ML20148A562)
- ML20148A563 + (ML20148A563)
- ML20148A565 + (ML20148A565)
- ML20148A567 + (ML20148A567)
- 05000298/LER-1978-029, Forwards LER 78-029/03L-0 + (ML20148A568)
- ML20148A569 + (ML20148A569)
- ML20148A570 + (ML20148A570)
- 05000456/LER-1987-061, :on 871224,PORV & PORV Block Valve Stroke Test Surveillance Overdue.Caused by Overly Restrictive Procedural Requirements.Surveillance Procedures Will Be Revised + (ML20148A571)
- IR 05000317/1988002 + (ML20148A572)
- ML20148A573 + (ML20148A573)
- ML20148A574 + (ML20148A574)
- IR 05000553/1978007 + (ML20148A575)
- ML20148A576 + (ML20148A576)
- ML20148A579 + (ML20148A579)
- ML20148A582 + (ML20148A582)
- ML20148A583 + (ML20148A583)
- ML20148A585 + (ML20148A585)