IR 05000553/1978007

From kanterella
Jump to navigation Jump to search
IE Inspec Repts 50-553/78-07 & 50-554/78-07 on 781018-20 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Constr Status,Work Performance & Records for Site Preparation & Struc Concrete
ML20148A575
Person / Time
Site: Phipps Bend  Tennessee Valley Authority icon.png
Issue date: 11/13/1978
From: Bryant J, Harris J, Lenahan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20148A573 List:
References
50-553-78-07, 50-553-78-7, 50-554-78-07, 50-554-78-7, NUDOCS 7812290111
Download: ML20148A575 (5)


Text

- -- - _ --- - - -

_ -- _ -__

__

_

?

UNITED sT ATES pm Ricg NUCLEAR REGULATORY COMMISSION o

R E GloN 11 y

,., g g

101 M ARIETT A sT R E E T. N.W

$

. < *,

g ATL ANT A. GEORGI A 30303

,

s, m

,

.....

Report Nos.

50-553/78-07 and 50-554/78-07 Docket Nos.:

50-553 and 50-554 License Nos.-

CPPR-162 aad CPPR-163 Categories:

A2 and A2 Licensee Tennessee Valley Authority 830 Power Building Chattanooga, Tennessee 37401 Facility Name Phipps Bend Nuclear Plant, Units 1 and 2 Inspection at:

Phipps Bend Site, Hawkins County, Tennessee Inspection Conducted:

October 18-20, 1978 Inspectors:

J. R. Harris J. J. Lenahan l

/

/

m i t

Reviewed by: k b\\M hs

/i3/M s

J.C.BryanDChief u

' Da'te Engineering Support Section No. 1 Reactor Construction and Engineering Support Branch Ins _pection Summary Insp_ection on October 18-20, 1978 (Report Nos. 50-553/78-07 and 50-554/78-07)

Areas inspected:

Construction stat us; work performance and records for site preparation anJ structural concrete; receiving inspection and preventative maintenance prograr.i; civil QC inspector training program. The inspection involved 44 inspector-hours on site by two NRC inspectors.

Results: No deviations or iterrs of noncompliance were identified.

7812290111

...

  • d4

-


_

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, __

_ _ _ _ _ _ _ _ _ _ _ _ _ _ __

-__-_-_-_ _ - _ - _ _ _ _ _

__

_ _ _

_

,

RII Rpt. Nos. 50-553/78-07 and 50-554/78-07 1-1

.

DETAILS I Prepared by:_

hm W.'//f /777 y

. R.

iarris, Civil Engineer / Geologist Dat(

Kngineering Support Section No. 1 Reactor Con:itruction and Engineering Support Branch

&

w ; f /r /c JO S. Lenahan, Civil Engineer Date Engineering Support Section No. 1 Reactor Construction and Engineering Support Branch Dates of Inspection:

October 18-20, 1978

.y

_

f, _

oi W'

Reviewed by:

M.

c,m ?

J. C. Bryant, Chief j

ate Engineering Support Section No. 1 Reactor Construction and Engineering Support Branch 1.

Persons Contacted Tennessee Valley Authority (TVA)

a.

W. P. Kelleghan, Projecc Manager G. W. Wadewitz, Construction Engineer

  • D. E. Hitchcock, Supervisor, Site QA Unit
  • T. G. Tyler, Licensing Engineer, EKDES
  • J. Wills, Regulatory Staf f Engineer
  • R. Keck, QA Engineer, OEDC
  • J. C. Cofield, Supervisor, Materials and Civil Engineer, QC
  • B. Page, Supervisor, Document Control Unit
  • J. Cromer, Civil Engineer, Project Engineering S. Calhoun, QC Inspector, Kingsport Quarry b,

Vulcan Materials Corporation

.

N. Hodson, QC Inspector, Kingsport Quarry

  • Denotes those present at the exit interview.

2.

Licensee Action on Previous Inspection Findingt

....

' pe,

'^^----

- - - - -

- _ _. _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_--

-_- _ _ _ - _ _ - _ - _ - _ _

__

_

.

(

RII Rpt. Nos. 50-553/78-07 and 50-554/78-07 I-2 This area was not inspected.

3.

Unresolved Items No unresolved items were identified.

4.

Independent Inspection Effort The inspector examined the following areas:

a.

Overall construction status b.

Soils and concrete lab c.

Concrete batch plant d.

Reinforcing steel laydown area and results of physical and chemical tests (Certified Mill Test Reports) performed on reinf orcing steel Training progran for Civil QC inspectors e.

f.

Storage area and preventative maintenance program for RHR heat exchangers and f uel pool heat exchansers l

g.

Impervious borrow explorations h.

Gradation records for coarse and fine aggregates and Vulcan Materials Corporation's Kingsport Quarry (quarry is supplying aggregates for the project).

Gradations of aggregates being produced do not meet TVA specifications. A QCIR has been written and the licensee is investigating causes of the problem.

No Category I concrete has been placed as of October 20, 1978.

No deviations or items of noncompliance were identified in the areas examined.

Site Preparation - Observation of Work and Work Activities, Units 1 and 2 The inspector observed work and results of wo.k activities for excavations of Units 1 and 2 powerhouse blocks.

Excavations were accomplished by drilling and blasting; dewatering is being controlled by ditches and sumps. Acceptance criteria examined by the inspector appear in Sections 2.4 and 2.5 of the PSAR and SER and responses to NRC

.

O F

- - - - - - - - - ~ _ -. _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_

__

c ---

_ _ _ _.

_ _ _ - _ _ _ _ _ _ - _ _ _

_-_ - __

__

_

.

.

RII Rpt. Nos. 50-553/78-07 and 50-55t./78-07 1-3 questions 323.2 through 323.5 in the PSAR. Controlling specifications and procedures examined by the inspector were:

TVA Specification G-9, Rolled Earthfill for Dams and Power Plants a.

b.

TVA Specification G-2, Plain and Reinforced Concrete c.

N7C-876, Construction Specification For Earth and Rock Foundations and Fills d.

QC.1-C-101,102,108 and 110 SOP-2, Rock Drilling, Loading and Blasting Procedure.

e.

Observations included excavation surfaces and results of blasting in Units 1 and 2 and the CCW trenches, shot number 131, licensee identified f aults, and results of concrete fill operations in Unit 1.

Observations and discussions with the project geologist and responsible engineers indicated site conditions are as presented in the PSAR and dewatering, blastic.g, excavations and unusual problems such as faulting are being handled in accordance with acceptance criteria.

No deviations or items of noncompliance were identified.

6.

Site Preparation - Review of Quality Records, Units 1 and 2 The inspector examined records on blast numbers 90 to 92, 110 to 116 and 126 to 130, geologic maps and photographs for Ucits 1 and 2, foundation acceptance documentation for Unit 1, and QC documentation on concrete fill operations for pour numbers Rl-AM01-1 AF and RI-AM01-lAF-2 in Unit 1.

Acceptance criteria examined by the inspector included Section 3.8 of the PSAR, responses to NRC questions 323.2 through 323.5 in the PSAR, QAP 5.3 and those listed in paragraph 5.

No deviations or items of noncompliance were identified.

7.

Conta.nment (Structural Concrete 1) - Observation of Work and Work Activities, Unit 1 The inspector observed placement of reinf orcing steel in the bottom mat of the Unit I reactor building. Acceptance criteria examined by the inspector appear in Section 3.8 of the PSAR and responses to NRC

,

questions 323.2 through 323.5 in the PSAR.

Controlling l

..

  • M

,

- - - - - _ _ _ _ _ _ _ _ _ _ _.

_

_

(

._-__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ____-

_

.

.

.

RII Ept. Nos. 50-553/78-07 and 50-554/78-07 I-4 specifications, procedures and drawings examined by the inspector were:

a.

C.F. Braun Specification, TVA Stride b.

TVA Specification G-2, Plain and Reinforced Concrete c.

Procedures QCI-C-207, 401, 402, CEP-2,12 and 9.04 d.

Drawing Numbers 4YE0305-Y1-03 R1 and 10N352 Observations included placement and results of placement of the first and second layer of reinforcing steel in the bottom mat and documentation on the following Cadweld operations:

a.

Cadwelds H-18-HC-0071-R, -0077R, -0078R, -0087R, -0088R, A-HB-0019R, -0022R, 0023R, -0024R, D-18-HB-0054R, C-11-HB-0067R, E-18-HB-0070R, b.

Cadweld Operator Certifications for Crews A and H c.

Test data on Cadwelds F-18-HC-0009R,H-18-HC-0075R, -0086R and -

0092R.

No deviations or items of noncompliance were identified.

8.

Exit Interview The inspector met with the licensee representatives denoted in paragraph 1 at the conclusion of the inspection.

The licensee was apprised of the senpe and findings of the inspection which included construction status, work performance and quality records for site preparation and structural concrete, receiving inspection and preventative maintenance program and civil QC training program.

No deviations or items of noncompliance were identified, i