Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20147D741 + (ML20147D741)
- ML20147D742 + (ML20147D742)
- ML20147D743 + (ML20147D743)
- ML20147D744 + (ML20147D744)
- ML20147D746 + (ML20147D746)
- ML20147D748 + (ML20147D748)
- ML20147D750 + (ML20147D750)
- ML20147D751 + (ML20147D751)
- ML20147D752 + (ML20147D752)
- 05000333/LER-1987-022, :on 871210,portion of Surveillance Test Not Performed at Required Frequency Due to Operator Oversight. Operators Involved Counselled + (ML20147D753)
- ML20147D754 + (ML20147D754)
- ML20147D756 + (ML20147D756)
- 05000333/LER-1987-021, :on 871213,RWCU Sys Isolated Due to Failure of Pipe Flange to Seat Gasket.Caused by Inadequate Pipe Flange Bolt Torquing Procedure.Procedure Changed to Include Secondary Effects + (ML20147D757)
- ML20147D760 + (ML20147D760)
- ML20147D761 + (ML20147D761)
- ML20147D765 + (ML20147D765)
- ML20147D766 + (ML20147D766)
- ML20147D767 + (ML20147D767)
- ML20147D769 + (ML20147D769)
- ML20147D770 + (ML20147D770)
- ML20147D771 + (ML20147D771)
- ML20147D772 + (ML20147D772)
- ML20147D773 + (ML20147D773)
- ML20147D774 + (ML20147D774)
- ML20147D777 + (ML20147D777)
- ML20147D779 + (ML20147D779)
- ML20147D780 + (ML20147D780)
- W3P88-0032, Forwards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1987. Rev 6 to Surveillance Procedure HP-1-230, Offsite Dose Calculation Manual Also Encl + (ML20147D781)
- ML20147D782 + (ML20147D782)
- 05000341/LER-1987-054, :on 871217,isolation of Reactor Bldg Ventilation Occurred During Performance of Surveillance Testing.Caused by Equipment Inaccessibility.Blown Fuse Replaced & Actuations Reset + (ML20147D783)
- ML20147D784 + (ML20147D784)
- ML20147D786 + (ML20147D786)
- ML20147D788 + (ML20147D788)
- ML20147D789 + (ML20147D789)
- 05000328/LER-1987-010-03, :on 871221,two Containment Ventilation Isolations Occurred Due to Spurious High Radiation Spike. Cause Under Investigation.Appropriate Actions Will Be Determined & Implemented After Investigation + (ML20147D791)
- ML20147D792 + (ML20147D792)
- ML20147D793 + (ML20147D793)
- ML20147D794 + (ML20147D794)
- ML20147D797 + (ML20147D797)
- ML20147D798 + (ML20147D798)
- ML20147D799 + (ML20147D799)
- 05000423/LER-1987-049, :on 871216,engineering Evaluation Required by Plant Tech Specs Not Performed within Allotted Time Frame. Caused by Misinterpretation of Action Statement of Tech Specs 3.7.10.Engineering Evaluation Performed + (ML20147D800)
- ML20147D802 + (ML20147D802)
- ML20147D803 + (ML20147D803)
- ML20147D804 + (ML20147D804)
- IR 05000013/1978004 + (ML20147D808)
- ML20147D809 + (ML20147D809)
- ML20147D813 + (ML20147D813)
- ML20147D814 + (ML20147D814)
- ML20147D815 + (ML20147D815)
- ML20147D817 + (ML20147D817)