ML20147D794

From kanterella
Jump to navigation Jump to search
Forwards Supplemental Response to Integrated Design Insp Item D4.3-7,per Insp Repts 50-325/87-48 & 50-328/87-48
Date released: 06/09/2020 Download: ML20147D794


Task Rept on Development of Seismic Acceleration Response Spectra for Diesel Generator Bldg of Sequoyah Nuclear Plant, Part 2:Site-Specific OBE & SSE Inputs.
ML20147G804
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 02/25/1988
From:
BECHTEL POWER CORP.
To:
References
Download: ML20147G804 (112)
Task Rept on Development of Seismic Acceleration Response Spectra for Diesel Generator Bldg of Sequoyah Nuclear Plant, Part 1:Design Basis SSE Input.
ML20147G786
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 02/25/1988
From:
BECHTEL POWER CORP.
To:
References
Download: ML20147G786 (98)
Forwards Supplemental Response to Integrated Design Insp Item D4.3-7,per Insp Repts 50-325/87-48 & 50-328/87-48
ML20147D789
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 03/02/1988
From: Michael Ray
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
Download: ML20147D789 (5)