Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- U-602791, Documents Util Plans to Conduct Mid Cycle Outage.Primary Purpose of Outage Will Be to Improve Matl Condition of Plant.Schedule Encl + (ML20141H086)
- ML20141H087 + (ML20141H087)
- ML20141H088 + (ML20141H088)
- ML20141H089 + (ML20141H089)
- ML20141H090 + (ML20141H090)
- ML20141H091 + (ML20141H091)
- ML20141H092 + (ML20141H092)
- ML20141H093 + (ML20141H093)
- ML20141H094 + (ML20141H094)
- BVY-97-088, Monthly Operating Rept for June 1997 for Nynps + (ML20141H097)
- ML20141H098 + (ML20141H098)
- ML20141H099 + (ML20141H099)
- B16615, Monthly Operating Rept for June 1997 for Mnps + (ML20141H100)
- IR 05000482/1997004 + (ML20141H102)
- ML20141H103 + (ML20141H103)
- NUREG-1065, Forwards Initial Review Comments on Aug 1985 Fundamental Matl Control (Fnmc) Plan,Partially Discussed in 851113 Meeting.Rev & Resubmittal,W/Greater Level of Detail,Needed Per NUREG-1065 + (ML20141H105)
- NSD-NRC-97-5139, Forwards Rev 3 to DE-AC03-90SF18495, Simplified Passive Advanced LWR Plant Program,AP600 Certified Design Matl. NRC Should Review Matl as Part of AP600 Design Certification Review + (ML20141H106)
- ML20141H107 + (ML20141H107)
- ML20141H108 + (ML20141H108)
- ML20141H109 + (ML20141H109)
- ML20141H110 + (ML20141H110)
- ML20141H113 + (ML20141H113)
- ML20141H114 + (ML20141H114)
- ML20141H116 + (ML20141H116)
- ML20141H117 + (ML20141H117)
- ML20141H118 + (ML20141H118)
- ML20141H119 + (ML20141H119)
- ML20141H120 + (ML20141H120)
- ML20141H121 + (ML20141H121)
- ML20141H124 + (ML20141H124)
- ML20141H125 + (ML20141H125)
- NSD-NRC-97-5236, Forwards SSAR Section of short-term Availability Controls for Listed Systems/Functions Under Specified Conditions of Operations + (ML20141H126)
- ML20141H127 + (ML20141H127)
- ML20141H128 + (ML20141H128)
- B16546, Special Rept:On 970615,Train B EDG Failed.Event Review Team Was Formed to Investigate & Evaluate Potential Cause of Oscillations + (ML20141H129)
- ML20141H130 + (ML20141H130)
- ML20141H131 + (ML20141H131)
- ML20141H132 + (ML20141H132)
- ML20141H133 + (ML20141H133)
- ML20141H136 + (ML20141H136)
- ML20141H137 + (ML20141H137)
- B16575, Submits Revised Commitment to Not Use AFW Sys During Normal Startup or Shutdown & to Use Main FW Sys in Place as Originally Designed + (ML20141H138)
- IR 05000445/1997010 + (ML20141H139)
- ML20141H140 + (ML20141H140)
- NSD-NRC-97-5232, Forwards Application for Withholding Info from Public Disclosure,Copyright Notice,Proprietary Info Notice, Affidavit & Proprietary Version of WCAP-14601, AP600 Accident Analysis - Evaluation Models, Rev 1 + (ML20141H141)
- ML20141H142 + (ML20141H142)
- IR 05000483/1997010 + (ML20141H144)
- 05000305/LER-1985-022, :on 851203,discovered That Surveillance Procedure Sp 48-046,conducted on 851127,performed Outside of Required Time Interval.Caused by Calibr of Nuclear Instrumentation Due to 851113 Trip + (ML20141H145)
- ML20141H147 + (ML20141H147)
- ML20141H148 + (ML20141H148)
- ML20141H149 + (ML20141H149)