IEeY4s8 n't Naclear Operstums
,iA; Detroit r-Edison EIE "
em.
April 17, 1986
)
I VP-86-0019 j
4
)
Director of Nuclear Reactor Regulation l
Ms. Elinor G.
Adensam, Director i
Project Directorate No. 3 Division of BWR Licensing U.
S. Nuclear Regulatory Commission Washington, D.C. 20555 4
i
Dear Ms. Adensam:
Reference:
- 1)
Fermi 2 l'
NRC Docket No. 50-341 NRC License No. NPF-43 2)
Detroit Edison to NRC Letter, "Inse rv ic e Testing of Pumps and Valves", EF2-65368, dated October 4, 1983
Subject:
Revision to Inservice Testing Proaram for Pumps and Valves _
Revision 2 to the Fermi 2 Inservice Testing (IST)
Program for Pumps and Valves was provided in Reference 2.
In the course of implementing the IST program, Detroit Edison has determined that it is inappropriate to perform stroke time testing on valve E11-F010 (LPCI system cross-tie valve) shown in the Reference 2 submittal.
Under 10CFR 50.55a (g), this valve is exempt from stroke time testing requirements.
Therefore, Detroit Edison is deleting the stroke time testing requirement for valve E11-F010 from the Formi-2 IST Program.
I Currently, valve E11-F010 is normally key-locked open.
This valve is required to be open to allow either division of Ri!R to inject into the selected LPCI loop in l
a Loss of Coolant Accident.
This valve is not required to close upon receipt of a LPCI initiation signal.
Therefore, this valve is considered passive under Section XI of the ASME Code and can be deleted f rom the
[
IST program.
i Stroke time testing requires deliberately closing this valve during operation.
This puts the plant into the Limiting Condition for Operation of Technical i
Specification 3/4.5.1, Action Statement b.2.
If the valve does not reopen, the Action Statement requires the plant to be in llot Shutdown within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in Cold j
8604240003 860417 0
PDR ADOCK 05000341 L
P PDR I
~.
Ms. Elinor G. Adensam April 17, 1986 VP-86-0019 Page 2 Shutdown within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
A plant shutdown is required to fix the valve.
Thus testing would expose the plant to unnecessary risk of forced shutdown.
Based on the foregoing, Detroit Edison is removing this valve from the IST Program in regard to stroke time testing only.
Please direct any questions to Mr.
R.
L. Woolley at (313) 586-4211.
Sincerely,
- }-U L / aS c
cc:
Mr. M. D. Lynch Mr. J.
D.
Page Mr. W.
G.
Rogers USNRC Document Control Desk Washington, D.C.
20555 l
t I
.