ML20141H091

From kanterella
Jump to navigation Jump to search
Discusses Semiannual PPR of Plant Completed on 970326. Details of Planned Insp for Next 6 Months Encl
ML20141H091
Person / Time
Site: Oyster Creek
Issue date: 05/13/1997
From: Eselgroth P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Roche M
GENERAL PUBLIC UTILITIES CORP.
References
NUDOCS 9705230185
Download: ML20141H091 (3)


Text

_ ,.

i'

'e  ;

May 13, 1997 i

Mr. Michael B. Roche Vice President and Director GPU Nuclear Corporation Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR)- OYSTER CREEK On March 26,1997, the NRC staff completed the semiannual Plant Performance Review (PPR) of the Oyster Creek Nuclear Generating Station. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources. The PPR for Oyster Creek involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period November 1996 through March 1997. PPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.

This letter advises you of our planned inspection effort resulting from the Oyster Creek PPR review. It is provided to minimize the resource impact on your staff and to allow for ,

i scheduling conflicts and personnel availability to be resolved in advance of inspector arrival s onsite. The enclosure details our inspection plan for the next 6 months. Resident inspections are not listed due to their ongoing and continuous nature.

We willinform you of any changes to the inspection plan. If you have any questions, j please contact me at (610) 337-5234.  :

1 Sincerely, Original Signed By:

Peter W. Eselgroth, Chief l Projects Branch 7 i Division of Reactor Projects Docket No. 50 219 ,

License No. DPR 16

Enclosure:

Inspection Plan 1 0 '. }

G. Busch, Manager, Site t' censing, Oyster Creek j M. Laggart, Manager, Corporate Licensing State of New Jersey 1 9705230185 970513

.N.hk.h. '

PDR ADOCK 05000219 G PDR 2

Mr. Michael Roche 2 Region l Docket Room (with concurrences)

Nuclear Safety information Center (NSIC)

PUBLIC NRC Resident inspector DRS Director, Region 1  :

DRS Deputy Director, Region i DRS Branch Chiefs, Region i DRP Director, Region i DRP Deputy Director, Region I DRP Branch Chiefs, Region 1 J. Nick, DRP  !

M. Oprendek, DRP C. O'Daniell, DRP Distribution w/enci (VIA E-MAIL):

W. Dean, OEDO P. Milano, NRR/PD l 3 i R. Eaton, NRR/PD 1-3 .

R. Correia, NRR F. Talbot, NRR DOCDFSK Inspection Program Branch, NRR (IPAS) 1 I

l i

l l

l l

I l

l DOCUMENT NAME: G:\ BRANCH 7\PPR-LTR.OC l u . . .. n . . . . . n. ..: c . c ,, ,,isooi .ti..s ,,i,. io.o,. : . co.. in .it.cs ni,.ncio.o,. u . wo .,

OFFICE Rl/DRP E D Rl/DF}fj g / l NAME JNick/ceo p PE @ $oth l DATE 05/09/97 05//J/97 05/ /97 05/ /97 05/ /97 l OFFICIAL RECORD COPY I

t e

OYSTER CREEK INSPECTION PLAN

. IP - Inspection Procedure Ti - Temperary instruction CD Core inspection (Muumum NRC Inspection Program (mendatory al plents)

WSPECTMS TITLEIPROGRAIA AMAi WSPECT185'STARTA ITTPE SP)  ; x;-

  1. c -

~ SATES:1 MSPECTIgymanasNTS -

IP 86750 Solid Radweste Mgmt and Transportation 612/9 7 CO IP 71001 Licensed Operator Requal. 6116/97 CD IP 37750 Engineering - Visit 1 712 819 7 C0 IP 83728 Maintaining Occupational Exposures ALARA 8/25/97 RI IP 62705 Electrical Maintener;e 911 519 7 RI IP 84750-02 Environmental Monitoring 9/29/97 CD IP 82301 EP Exercise 10/20l97 CD IP40500 Effectiveness of Licensee Controls in Identifying, ll98 C0 Resolving and Preventing Problems l

e 4

s-_ - ----- - --__---_----_--_-------,- -_---a,--.---___-__u-- --w - w ~ +-w - ~ _ _ - - - - - - - - - _ - . _ _ _ _ _ _ _ _ - _ _ - - - - - _ -_ _ _ , - - -