Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20140F044 + (ML20140F044)
- TXX-4667, Responds to Violations Noted in Insp Rept 50-445/85-11. Corrective Actions:Procedure CPP-001 Revised to Eliminate Need to Put in Side Bars Where Extensive Procedural Revs Made + (ML20140F045)
- ML20140F046 + (ML20140F046)
- PY-CEI-NRR-2167, Forwards 1996 Annual Environ & Effluent Release Rept for Perry Nuclear Power Plant + (ML20140F047)
- IR 05000305/1985019 + (ML20140F048)
- ML20140F049 + (ML20140F049)
- ML20140F050 + (ML20140F050)
- TXX-4679, Suppls Response to Violations Noted in Insp Rept 50-445/85-11.Corrective Actions:Qc Programmatic Controls Formalized to Document out-of-scope Observations + (ML20140F051)
- ML20140F052 + (ML20140F052)
- ML20140F053 + (ML20140F053)
- ML20140F056 + (ML20140F056)
- ML20140F058 + (ML20140F058)
- ML20140F059 + (ML20140F059)
- ML20140F060 + (ML20140F060)
- U-600431, Forwards Executed Amend 1 to Indemnity Agreement B-91.Amend Modifies Location Description to Generally Conform to Location in Liability Insurance Policy + (ML20140F062)
- ML20140F063 + (ML20140F063)
- ML20140F064 + (ML20140F064)
- IR 05000245/1997003 + (ML20140F065)
- ML20140F066 + (ML20140F066)
- ML20140F068 + (ML20140F068)
- ML20140F069 + (ML20140F069)
- PNO-III-86-003A, on 860120,inspectors Discovered That Temps Created by Polyurethane Insulation Fire on 860120 May Have Been High Enough to Cause Physical Changes to Portions of Drywell Vessel Metal + (ML20140F070)
- ML20140F071 + (ML20140F071)
- ML20140F073 + (ML20140F073)
- ML20140F076 + (ML20140F076)
- ML20140F077 + (ML20140F077)
- ML20140F079 + (ML20140F079)
- ML20140F080 + (ML20140F080)
- ML20140F081 + (ML20140F081)
- 05000301/LER-1985-005-01, :on 851231,reactor Trip Occurred Due to Loss of Electrical Load.Caused by Failed Lightning Arrestor. Lightning Arrestor Replaced,Msiv Repaired & Tested & Fast Bus Transfer Circuitry Response Verified + (ML20140F082)
- ML20140F083 + (ML20140F083)
- ML20140F084 + (ML20140F084)
- IR 05000219/1985018 + (ML20140F086)
- ML20140F087 + (ML20140F087)
- ML20140F088 + (ML20140F088)
- ML20140F089 + (ML20140F089)
- ML20140F090 + (ML20140F090)
- ML20140F091 + (ML20140F091)
- IR 05000259/1997003 + (ML20140F092)
- 3F0497-02, Forwards Rev 2 to Crystal River Unit 3 Mgt Corrective Action Plan (Mcap) + (ML20140F093)
- ML20140F094 + (ML20140F094)
- ML20140F095 + (ML20140F095)
- ML20140F096 + (ML20140F096)
- ML20140F097 + (ML20140F097)
- ML20140F098 + (ML20140F098)
- ML20140F099 + (ML20140F099)
- ML20140F101 + (ML20140F101)
- ML20140F103 + (ML20140F103)
- ML20140F104 + (ML20140F104)
- ML20140F105 + (ML20140F105)
- ML20140F106 + (ML20140F106)