Further Response to FOIA Request for Documents Re Brown & Root,Inc.Forwards App D Documents.Documents Also Available in PDR
ML20140F056
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/11/1985
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Huge H
ROGOVIN, HUGE & LENZNER
Shared Package
ML20140F059 List:
References
FOIA-84-487 NUDOCS 8507080086
Download: ML20140F056 (3)


Text

V T,wg'o 8

UNITED STATES n.

g I

a. .

E .,,, ( ~ ,h NUCLEAR REGULATORY COMMISSION g  :: E WASHINGTON, D. C. 20555

% ..+ /

MAR 111985 Mr. Harry Huge, Esquire Rogovin, Huge & Lenzner IN RESPONSE REFER 1730 Rhode Island Avenue, NW TO FOIA-84-487 Washington, DC 20036

Dear Mr. Huge:

This is in further response to your letter dated June 12, 1984, in which you requested, pursuant to the Freedom of Information Act (F0IA), documents regarding Brown & Root, Inc.

The documents listed on the enclosed Appendix D were contained in boxes sent to this office by the NRC's Region V office. These documents are being placed in the NRC Public Document Room (PDR) and will be filed in PDR folder F01A-84-487 under your name.

The NRC has not completed its review of the remaining documents subject to your request. We will respond as soon as the review is completed.

Sincerely, J. . Felton, Director Division of Rules and Records Office of Administration (507 g 850311 HUGE 84-487 PDR

Box 1. Miscellaneous Steel Protective Coating Reports (PCR's), not in numerical order covering the following areas; Pipe Supports Electrical Penetrations Cable Tray Hanger Supports Liner Plate Polar Crane Supports Structural Steel Steam Generator Support Ring Stairways Brackets Instrumention Plate Conduit Support From January 81 through June 83 16.5" stacked.

Approx. 3700 pgs.

Box 2. Calibration Records For Dry Film Thickness Gage (DFT) from Dec. 82 through June 84 (3 inches)

Calibration Records For the Adhesion Tester From June 82 Through Jan. 84 (2 inches)

Concrete - Protective Coating Reports (PCR's) Reactor Containment Bldg - Unit 1 (5 inches)

Reactor Containment Bldg (RCB) Steel Liner Plate From April 82 Through July 83 (1.5 inches)

Box 3. Measuring and testing equipment records for Dry Film Thickness (DFT) from Jan,. 81 Through June 1984. 15" Stacked, Approx. 3375 pgs.

Box 4.

10/02/81 From D.N. Chapman to J.T. Merritt, Audit Report TCP-24 10/30/81 From R.G. Tolson to D.N. Chapman, Responses to Audit Report 11/13/81 From D.N. Chapman to R.G. Tolson, Responses to Audit Report 11/17/81 From R.G. Tolson to D.N. Chapman, Responses to Audit Report 11/19/81 From R.T. Gary to G.L. Madsen, Responses to Audit Report 12/20/81 From R.G. Tolson to D.N. Chapman, Responses to Audit

, Report 5

l 01/22/82 From D.N. Chapman to R.G. Tolson, Responses to Audit

?

Report

. M Re: FOIA-84-487

  • APPENDIX D CONTINUED From TUGCo. Procedures QI-QP-11.4 Rev. 0-13, Reinspection of Seal Coated and Finish Coited Steel Substrates for which Documentation if missing or discrepant.

From TUGCo. Procedures QI-QP-11.4-24 Rev 0-7 Reinspection of Protective Coatings on concrete subtrates for which documentation is missing or discrepant Computer printouts for large and small bore hangers (1.5 inches)

Computer printouts for Protective Coating IR's in Reactor Bldg Unit 1 (3 inches)

Computer printout on Conduit Support DDV-PRT Rept.

(1 inch)

DDV File Listing Map of Liner PCR's List of Hangers

a. Pipe Hangers
b. Conduit Supports
c. Miscellaneous
d. Cable Tray Hangers Manufacturer's Instruction of Elcometer Model 106 Adhesion Tester (9 pages)

Inspectors Test - Reinspection of Coated Concrete and Steel Substrates (3 pages)

Technical Data Sheet on Tooke Gage (4 pages)

Inspector's Certification and Training Records (325 pages) 12/09/81 Brown-Root Procedure CPM 13.1, General Calibration

. Procedure, Rev. 7 (21 pages)

List of Adhesion Testers (1 page)

List of Tooke Gages (1 page) i j 1 computer printout list of Dry Film Thickness (DFT) Gages a

ti 5

1 5

Lcw orriCE3 RoGOVIN, HUGE & LENZN ER a paorcssio=% comacaar.o=

wiTCMELL ROGovtN 173o R H oO E ISL AN D AV E N U E, N. W. JAMES r NE AL

[g',"R r ENN A WASHINGTON, D. C. 2Oo36 GECRGE T. FRAMPTON, JR.

JON ATH AN D. SCHILLER TELEPMCNE civic R.sov June 12, 1984 (202).ee.eA6 RONNA LEE BECK EUGENE J.COMEY vlCKi C.JACKSCN TELECC8'ER KRISTA M.FOGLEMAN (202) 466 6420 SUSAN L. CARNEY S AUL 8. GOCCM AN RANCALL LEE SPECK W:CH AEL 0. low E GARY K. HARRIS LIS A R. M ARX JEFFREY M. BL ATTNER JAMES E.PFANCER Joseph Felton FREEDOM OF INFORMATK)N Director ACT REQUEST Division of Rules and Records Of fice of Administration ggg_g U.S. Nuclear Regulatory Commission Washington, D.C. 20555 h M-/J-[f' Re: Freedom of Information Request

Dear Mr. Felton:

Pursuant to the Freedom of Information Act, 5 U.S.C.

S 552, and the regulations promulgated thereunder by the Nuclear Regulatory Commission ("NRC") at 10 C.F.R. Parts 2 and 9, we hereby request that you provide us with the fol-lowing documents:

1. Copies of all records in NRC's files pertaining to any studies, investigations, inquiries (formal or informal) concerning the Comanche Peak Nuclear Power Plant ("Comancne Plant") in Texas as well as any agency documents, internal memoranda, reports, complaints, citations and orders which pertain to the Comanche Plant.

We are primarily interested in any materials related to or concerning construction of the Comanche Plant, by Brown &

Root, Inc., including safety conditions, employee relations, work standards, allegations of inferior work, faulty workmanship, deficient work standards, and deficient performance.

2. Copies of all records in NRC's files pertaining to any studies, investigations, inquiries (formal or informal) ,

agency documents, internal memoranda, reports, complaints, citations and orders which pertain to Brown & Root, Inc., a Texas corporation involved in the construction of nuclear power plants.

. o r ~ r A I A __ D fX - 1 ~til 6 ] Y U . h 0 W i J '[

4f-e

RoGOVIN, HUGE & LENZNER a PmOFES5 TONAL ComPOmateON Joseph Felton June 12, 1984 Page 2 Please call the undersigned as soon as the dccuments are available and please notify us if you anticipate that the expense of complying with this request exceeds $200.00.

Thank you for your cooperation.

Sincerely, ROGOVIN, HUGE & LENZNER By:  %(4 liarry Huge {

l

.#T

, L AW OFFICES RoGOVIN, HUGE & LENZNER a enorcssiowas coanomano MITCHELL ROGovlN 173o RHooE ISLAND AVENUE, N. W. JAMES F. NE AL RRY F. LENZNER WASHINGTON, o. C. 2co36 GEORGE T. FRAMRTON,JR.

JONATHAN 0.5 CHILLER

'"E'"0"E cAvio R.soYo September 14, 1984 (202) 466-6464 RONNA LEE BECK EUGENE J.COMEY vtCKt C.JACRSON TELECOPIER MARSHALL S.wCLFF (202) 466 6420 NRtSTA M.FOGLEMAN SUSAN L. CARNEY SAUL B. GOODMAN RANDALL LEE SPECK

/

MICHAEL D.LOWE GARY M.HARRi$

f /J [

USA R.M ARX . . .

JEFFREY M.8LATTNER J t E'* h F

JAMES E.PFANDER

/A- M St/?

Joseph Felton Director Division of Rules and Records Office of Administration U.S. Nuclear Regulatory Commission Washington, D.C. 20555 RE: Freedom of Information Request FOIA 487

Dear Mr. Felton:

We are making the following request, which supplements my letter to you dated June 12, 1984, pursuant to the Freedom of Information Act, 5 U.S.C. 5552 and the Nuclear Regulatory Commis-sion ("NRC") regulations codified at 10 C.F.R. Parts 2 and 9.

1. Please provide us with copies of all reports, memoranda, transcripts of hearings, correspondence and any other documenta-tion in the custody or control of the NRC that pertain to hearings held by the Atomic Safety & Licensing Board ("ASLB") since January 1, 1984 regarding deficient painting works in the contain-ment buildings at the Comanche Peak Steam Electric Station

(" Comanche Peak").

We are especially interested in any information relating to Texas Utilities Generating Co. ("TUGCO"), the licensee, and Brown and Root, Inc., the construction contractor.

2. Please provide us with copies of all reports, memoranda, transcripts of hearings, correspondence and any other documenta-tion in the custody or control of the NRC that pertain to hearings held by the ASLB regarding intimidation of Quality Assurance

~

inspectors by employees of TUGCO or Brown and Root, Inc.

i1 1 N

w.

\f ROGOVIN, H UGE & LENZN ER 4 mmo rESSiC.*Ab CQmpomavio%

Joseph Felton September 14, 1984 Page Two We are only interested in documents that have been produced or have'become available since the issuance of OI Report No.

4-83-013, dated November 3, 1983.

3. Please provide us with copies of the transcripts of the testimony or the statements of the following witnesses, affiants and interviewees whose comments were made during the review of-TUGCO's Application for an Operating License (Comanche Peak Steam Electric Station, Units 1 and 2, Docket No.s. 50-445 and 50-446):
a. Roy Keith Combs
b. Lester Smith
c. Freddy Ray Harrell
d. Gates (first name not known)
e. Hamilton (first name not known)

The FOIA provides that if only portions of a file are exempted from release, the remainder must be released. We therefore request that we be provided with all nonexempt portions which are reasonably segragable and with an inventory of all exempted portions. We reserve our right to appeal the with-holding or deletion of any information.

We are prepared to pay reasonable costs for locating the requested materials and reproducing them. If you have any questions regarding this request, please telephone us at the above number.

As provided in the Freedom of Informtion Act, we will expect to receive a reply within ten working days.

Sincerely, ROGOVIN, HUGE & LENZNER By:

Harry uge cc: Stephen Isaacs ~