ML20140F089
| ML20140F089 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 01/29/1986 |
| From: | Shafer W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dewitt R CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML20140F095 | List: |
| References | |
| NUDOCS 8602040234 | |
| Download: ML20140F089 (3) | |
See also: IR 05000155/1986002
Text
.
.
JAN 2 9 W8&
Docket No. 50-155
Consumers Power Company
ATTN:
Mr. R. B. DeWitt
Vice President
Nuclear Operations
212 West Michigan Avenue
Jackson, MI 49201
Gentlemen:
This refers to the routine safety inspection conducted by Mr. W. Snell and
Ms. M. Smith of this office on January 6-9, 1986, of activities at the Big Rock
Point Plant authorized by NRC Operating License No. OPR-6 and to the discussion
of our findings with Mr. D. Hoffman and others of your staff at the conclusion
of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
jff;b't/wtttk4 &
W. D. Shafer, Chie
Radiological Protection Branch
Enclosures:
1.
Appendix, Emergency
Preparedness Open Items
2.
Inspection Report
No. 50-155/86002(ORSS)
See Attached Distribution
9602040234ONh55
ADOCK O
s'
qf
'6' -
O
4 )f @,
__
.
.
Consumers Power Company
2
JM 2 919%
Distribution
cc w/ enclosures:
DCS/RSB (RIDS)
Resident Inspector, RIII
Licensing Fee Management Branch
Ronald Callen, Michigan
Public Service Commission
D. J. VandeWalle, Director
Nuclear Licensing
D. P. Hoffman, Plant
Superintendent
Nuclear Facilities and
Environmental Monitoring
Section
W. Weaver, FEMA, Region V
D. Matthews, EPB, OIE
ws)
j' kI,II
RIII
RI :I
II
RII
.
i
,
Snell/ls
S Ith
P
lips
Boyd
Shafer
a?#
4W
ik
qt4
- . _
-_-
._
. - _
.
_
.
.
i
4
APPENDIX
'
Emergency Preparedness Open Items
1.
Demonstrate the capability to augment the onshift staff by meeting the
30 and 60 minute time periods specified in the Big Rock Point Site Area
Emergency Plan, and continue to demonstrate this capability on a
semi-annual basis.
Open Item No. 50-155/85002-01(DRSS).
(Section 3.b)
2.
The title on the tabs that denote each individual procedure in the Big Rock
Point Plant Site Emergency Plan Implementing Procedures do not always
correspond to the procedure behind the tab.
This led to confusion and
delays in using the procedures during Shift Supervisor walkthroughs.
Open
Item No. 50-155/86002-02(DRSS).
(Sectinn 6)
l
a
.,
i
I
!
.
_ , _ - - . - - . - - - - _ .
-
. . - - , _ _ - - _ _ _ _ - - _ _ - - _ _ ~ - - - - - . . . .-- _
_