Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138L101 + (ML20138L101)
- ML20138L106 + (ML20138L106)
- ML20138L109 + (ML20138L109)
- ML20138L110 + (ML20138L110)
- ML20138L111 + (ML20138L111)
- ML20138L112 + (ML20138L112)
- 05000341/LER-1985-030, :on 850701,at 2% Power,Reactor Scram Occurred. Caused by Procedural Error Resulting in Spurious Water Level 3 Signal Generation.Instrumentation & Control Technician Training Enhanced to Prevent Recurrence + (ML20138L114)
- ML20138L115 + (ML20138L115)
- ML20138L117 + (ML20138L117)
- IR 05000529/1985041 + (ML20138L118)
- ML20138L123 + (ML20138L123)
- ML20138L124 + (ML20138L124)
- ML20138L126 + (ML20138L126)
- ML20138L127 + (ML20138L127)
- ML20138L129 + (ML20138L129)
- 3F1085-14, Summarizes Programs & Improvements to Emergency Feedwater Sys for Facility.Sys Installed Which Can Automatically Start & Control Emergency Feedwater Sys & Prevent Overcooling + (ML20138L130)
- PNO-III-85-095C, on 851212,diesel Generator 14 Tripped on Low Lube Oil Pressure During Test Run.Bearing Failure & Erratic Behavior of Svc Water Pump Under Investigation as Possible Causes.Generator Will Be Monitored + (ML20138L131)
- ML20138L134 + (ML20138L134)
- ML20138L137 + (ML20138L137)
- ML20138L138 + (ML20138L138)
- ML20138L140 + (ML20138L140)
- ML20138L141 + (ML20138L141)
- ML20138L143 + (ML20138L143)
- IR 05000925/2012001 + (ML20138L144)
- ML20138L146 + (ML20138L146)
- B11811, Forwards Quantitative Piping Experience Data Supporting Results of Millstone III Seismic Interaction Study, in Response to Request for Addl Info Re Use of Historical Earthquake Data in Evaluation of non-seismic Piping Sys + (ML20138L148)
- IR 05000344/1985036 + (ML20138L149)
- ML20138L150 + (ML20138L150)
- ML20138L151 + (ML20138L151)
- ML20138L153 + (ML20138L153)
- ML20138L154 + (ML20138L154)
- ML20138L155 + (ML20138L155)
- ML20138L159 + (ML20138L159)
- ML20138L162 + (ML20138L162)
- ML20138L163 + (ML20138L163)
- ML20138L167 + (ML20138L167)
- ML20138L169 + (ML20138L169)
- ML20138L171 + (ML20138L171)
- ML20138L172 + (ML20138L172)
- ML20138L174 + (ML20138L174)
- ML20138L175 + (ML20138L175)
- ML20138L176 + (ML20138L176)
- ML20138L177 + (ML20138L177)
- ML20138L178 + (ML20138L178)
- ML20138L179 + (ML20138L179)
- ML20138L180 + (ML20138L180)
- B11825, Forwards Reactor Containment Bldg Integrated Leakage Rate Test,Types A,B & C. Potential Changes in Bypass Leakage Paths Resulting from Continuing Design Review Identified + (ML20138L181)
- ML20138L182 + (ML20138L182)
- ML20138L184 + (ML20138L184)
- ML20138L185 + (ML20138L185)
- B16132, Forwards Voluntary Monthly Rept for Plant,Unit 1 Which Delineate Changes in Status & Changes in Schedule for Commitments to NRC for Nov & Dec 1996 + (ML20138L186)