ML20138L154

From kanterella
Jump to navigation Jump to search
Forwards Tornado Cost-Benefit Analysis for Proposed Backfits of Yankee Nuclear Power Station, Per 851021 Request for Addl Info Re SEP Topics III-2 & III-4.A
ML20138L154
Person / Time
Site: Yankee Rowe
Issue date: 10/24/1985
From: Haseltine J
YANKEE ATOMIC ELECTRIC CO.
To: Zwolinski J
Office of Nuclear Reactor Regulation
Shared Package
ML20138L159 List:
References
TASK-03-02, TASK-03-04.A, TASK-3-2, TASK-3-4.A, TASK-RR FYR-85-114, NUDOCS 8510310207
Download: ML20138L154 (2)


Text

r ts YANKEE ATOMIC ELECTRI,0 COMPANY T*'=pho"e (6 ") * ' -' 'oo TWX 710-380-7619 lW ' 1671 Worcester Road. Framingham, Massachusetts 01701 2.C.2.1

, , 2"C. I FYR 85-114

, ,s/aV M LT ,

. ./

October 24, 1985 United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Mr.-John A. Zwolinski, Chief Operating Reactors Branch No. 5 Division of Licensing

References:

(a) License No. DPR-3 (Docket No. 50-29)

(b) YAEC Letter to USNRC (FYR 84-74), dated July 9, 1984 (c) YAEC Letter to USNRC (FYR 85-01), dated December 31, 1984 (d) YAEC Letter to USNRC (FYR 85-14), dated February 13, 1985

Subject:

SEP Topic III-2 and III-4.A Additional Information on the Tornado Cost-Benefit Evaluation

Dear Sle:

As a result of a conference call on October 21, 1985 between the staff and Yankee on the Yankee Nuclear Power Station tornado cost-benefit analysis, we are enclosing a copy of a supplemental report entitled, " Tornado Cost-Benefit Analysis for Proposed Backfits at Yankee Nuclear Power Station."

This report presents the methodology and details associated with assessing the risks for tornado winds and the change in risks for potential backfits. A sumary of the results contained in the attached report was sent to the staff in Reference (b).

Some background on the evolution of the review of the tornado cost-benefit issue might be helpful to the staff in their review of the attached information. The original issue of the evaluation was submitted to the staff on July 7, 1984 (Reference b). A meeting was held on November 15, 1984 between representatives of Yankee and the SEP Branch to discuss staff questions raised during their review of our original submittal. In response to those specific staff questions, Yankee revised the Tornado Cost / Benefit Evaluation and submltted Revision 1 on December 31, 1984 [ Reference (c)].

Principal changes include the addition of a discussion of tornado missile probabilities; more specific information regarding structural analysis criteria; and a detailed explanation of the PRA techniques employed.

Also, as agreed in the November 15 meeting, Yankee submitted a package of sample calculations which were representative of the analytical methodologies employed in the cost-benefit evaluation [ Reference (d)]. The calculation covered analysis of a tank, specific block walls and structural steel. .A P"" anum, PDR 4h o

o 4

United States Nuclear Reguldtory Consission October 24, 1985 Attention: Mr. John A. Zwolinski Page 2 All the submittals support the fundamental conclusion that the design windspeed for the Yankee plant should be the 10-4 upper 95% windspeed of 110 mph; that at this windspeed there would not be any missiles; and that with the Cable Spreading Room upgraded, there is no structure or component which stands out as a major contributor to risk.

We trust that the enclosed information will enable the staff to complete their review of this issue. If there are any further questions, please contact us.

Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY 4 0 i ohn D. Haseltine l Project Manager Yankee Project GP/ba