Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137S610 + (ML20137S610)
- ML20137S611 + (ML20137S611)
- NSD-NRC-97-5031, Forwards Formal Transmittal of mark-up SSAR Sections Open Items & Draft Responses to NRC Questions Previously Submitted Informerly + (ML20137S617)
- ML20137S618 + (ML20137S618)
- ML20137S622 + (ML20137S622)
- ML20137S623 + (ML20137S623)
- ML20137S624 + (ML20137S624)
- IR 05000395/1986001 + (ML20137S625)
- ML20137S628 + (ML20137S628)
- ML20137S629 + (ML20137S629)
- ML20137S631 + (ML20137S631)
- ML20137S633 + (ML20137S633)
- ML20137S635 + (ML20137S635)
- 05000323/LER-1985-006-01, :on 850824,during Startup,Random Failure of Rod Drive Motor Generator Set Relays Resulted in Rod Insertion & Manual Reactor Trip.Caused by Burned Out Coil on Auxiliary Relay & Relay Drift.Relays Replaced + (ML20137S636)
- ML20137S639 + (ML20137S639)
- ML20137S640 + (ML20137S640)
- ML20137S641 + (ML20137S641)
- ML20137S644 + (ML20137S644)
- BVY-97-042, Monthly Operating Rept for Mar 1997 for Vermont Yankee Nuclear Power Station + (ML20137S648)
- 05000327/LER-1985-033-01, :on 850827,during Weekly Train B Chlorine Detector Function Testing,Esf Actuation Occurred for Main Control Room Isolation.Caused by Personnel Error.Personnel Counseled + (ML20137S651)
- ML20137S652 + (ML20137S652)
- ML20137S653 + (ML20137S653)
- 05000327/LER-1997-003-02, :on 970305,failed to Properly Perform Surveillance Testing on Centrifugal Charging Pump Inlet Isolation Valve Logic.Caused by Inadequate Surveillance Instruction.Prepared Special Test Procedure + (ML20137S654)
- A05377, Reaffirms Certification of Changes to Final Draft Tech Specs,Including Additions to Meteorological Monitoring Instrumentation Tables 3.3-8 & 4.3-5 & Snubber Surveillance Functional Test Requirement + (ML20137S658)
- ML20137S659 + (ML20137S659)
- ML20137S664 + (ML20137S664)
- ML20137S667 + (ML20137S667)
- A04826, Submits Supplementary Response to Generic Ltr 83-28,Item 4.5.3,per 850417 Request.Response Based on C-E Owners Group Evaluation of Recommended Reactor Trip Sys Test Intervals for C-E Plants,Published in CE NPSD-277, Reactor.. + (ML20137S668)
- ML20137S669 + (ML20137S669)
- ML20137S671 + (ML20137S671)
- ML20137S672 + (ML20137S672)
- ML20137S674 + (ML20137S674)
- ML20137S675 + (ML20137S675)
- ML20137S678 + (ML20137S678)
- ML20137S679 + (ML20137S679)
- 05000285/LER-1985-005, :on 850823,during Containment Pressure Reduction,Ventilation Isolation Actuation Sys Actuated. Caused by Technician Error in Repositioning Low/High Setpoint Selector Switch.Personnel Counseled + (ML20137S681)
- NSD-NRC-97-5058, Discusses Key Issue 1 Re Content of AP600 Ssar.Meeting Scheduled During Week of 970414 in Pittsburgh to Discuss Which P&Ids Require Addl Info + (ML20137S683)
- ML20137S685 + (ML20137S685)
- ML20137S686 + (ML20137S686)
- ML20137S688 + (ML20137S688)
- ML20137S691 + (ML20137S691)
- ML20137S692 + (ML20137S692)
- B16326, Provides Updated Response to GL 96-01, Testing of SR Logic Circuits + (ML20137S694)
- ML20137S696 + (ML20137S696)
- B11899, Forwards Evaluation Re Effects of Superheated Steam Blowdowns on Equipment Outside of Containment.Evaluation Provides Assurance That Facility Can Be Operated Safely at Full Power Pending Resolution of Issue + (ML20137S697)
- TXX-4567, Deficiency Rept SDAR-193 Re Potential Elimination of Control Capability of Feedwater Regulating Valve Due to Location of Power Supply in Cable Spreading Room.Initially Reported on 850827.Completion of Evaluation Anticipated by 851018 + (ML20137S699)
- ML20137S700 + (ML20137S700)
- 05000369/LER-1997-002-03, :on 970313,inoperability of FW Isolation Valves Discovered Due to Hydraulic Oil Degradation.Replaced Unit FWIV Solenoid Coils + (ML20137S701)
- ML20137S702 + (ML20137S702)
- ML20137S703 + (ML20137S703)
- NPL-97-0159, Forwards Documentation for Review to Support Restart Issues Identified on Unit 2 Startup Commitment List + (ML20137S706)