W% Condnonwealth Edison
}/h &
/
\\
3.t/
/ On3 First National Ptrza Chicigo, Ilhnois O
' Addr:ss Iliply to: Post Off.ca Box 767 Chicago, Illinois 60690 January 24, 1986 Mr. James G. Keppler.
Regional Administrator
~ Region III U.S. Nuclear Regulatory. Commission 799 Roosevelt Road Glen Ellyn, IL 60137
SUBJECT:
Braidwood Station Units 1 and 2 Supplemental Response to Inspection Report Nos.
50-456/85-007 and 50-457/85-007 NRC Docket Nos. 50-456 and 50-457
REFERENCE:
.(a) R.F. Warnick letter to C. Reed dated April 4, 1985 (b) D.L. Farrar letter to J.G.
Keppler dated May 3, 1985 (c) W.J. Little letter to C.
Reed 2
dated October 4, 1985
Dear Mr. Keppler:
Reference (a) identified a violation relative to the-generation / preparation of Inservice Inspection Drawings (456/85-007-08; 457/85-007-08).
Reference (b) provided Commonwealth Edison's (Ceco) response to that violation.
The NRC documented in Reference (c) a review of our response and the actions we took to clarify our procedure.
The inspector's review resulted in three factors requiring further
. attention.
The purpose of this letter is to address the NRC review.
Project Construction has issued a clarification letter to Phillips, Getschow concerning the use of the "ISI Checklist".
The letter clarifies that Phillips Getschow engineering personnel preparing PSI isometric drawings shall utilize this checklist in the preparation of these same drawings.
This checklist is an aid to the drawing preparer to insure checklist attributes are included on the PSI drawings.
OSh4 m 2 e 1986 10 1
,,--m,-
,... ~.,
..,--_w_
_,..._________.m.
,Y 4
_2_
The accuracy of the PSI drawings is assured through the following:
a)
PSI Coordinators review of the drawings for conformance with preservice conditions.
b)
Examination crews "walkdown" the drawings while performing the baseline volumetric and surface examinations.
c)
In some cases, contractor and fabricator (Phillips, Getschow Company and Southwest Fabrication) surface examination reports are utilized for baseline examinations.
The accuracy of these items is assured by the PSI Coordinator through the verification of the contractor's and fabricator's weld number to the corresponding PSI weld number as delineated on the PSI Drawing Weld Numbering List.
If you have any further questions on this matter, please direct them to this office.
Very truly yours, L.O. DelGeorge Assistant Vice President LOD / pay cc:
NRC Resident Inspector - Braidwood 1185K
\\
.