Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137R782 + (ML20137R782)
- ML20137R784 + (ML20137R784)
- ML20137R787 + (ML20137R787)
- ML20137R791 + (ML20137R791)
- ML20137R792 + (ML20137R792)
- ML20137R794 + (ML20137R794)
- ML20137R796 + (ML20137R796)
- ML20137R797 + (ML20137R797)
- ML20137R799 + (ML20137R799)
- ML20137R800 + (ML20137R800)
- ML20137R801 + (ML20137R801)
- 05000325/LER-1986-003, :on 860106,automatic Isolation of Unit 1 & 2 Common Control Bldg HVAC Sys Occured Due to Actuation of Sys Air Intake Plenum Chlorine Detector 2X-AT-2977.Caused by Spurious Actuation of Detector 2X + (ML20137R804)
- ML20137R805 + (ML20137R805)
- ML20137R806 + (ML20137R806)
- 05000247/LER-1985-016, :on 851212,reactor Trip Occurred Due to Loss of Reactor Coolant Flow Signals from Reactor Coolant Loop 21. Caused by Failed Bistable in Instrument Channel Coincident W/Signal from Low Flow Instrument Channel + (ML20137R808)
- ML20137R809 + (ML20137R809)
- ML20137R811 + (ML20137R811)
- 05000323/LER-1986-001-01, :on 860102,automatic Reactor & Turbine Trip Occurred Due to lo-lo Steam Generator Water Level.Caused by Main Feedwater Pump Trip During Full Load Rejection Startup Test.Pump Control Oil Sys Flushed + (ML20137R812)
- ML20137R813 + (ML20137R813)
- B11901, Forwards Addl Info Re Operator Response Time & Time at Which Accumulator Nitrogen Vent Valves Would Be First Subj to Submergence,Per 851119 Telcon + (ML20137R814)
- ML20137R815 + (ML20137R815)
- ML20137R816 + (ML20137R816)
- ML20137R818 + (ML20137R818)
- ML20137R820 + (ML20137R820)
- ML20137R821 + (ML20137R821)
- ML20137R823 + (ML20137R823)
- ML20137R825 + (ML20137R825)
- ML20137R826 + (ML20137R826)
- ML20137R827 + (ML20137R827)
- ML20137R828 + (ML20137R828)
- ML20137R832 + (ML20137R832)
- 05000352/LER-1986-003, :on 860106,actuation of Nuclear Steam Supply Shutoff Sys Occurred.Caused by Placement of RHR Isolation Valve B in Test Position.Instrument & Control Technicians Responsible for Error Counseled on Procedures + (ML20137R834)
- ML20137R837 + (ML20137R837)
- ML20137R838 + (ML20137R838)
- ML20137R839 + (ML20137R839)
- ML20137R840 + (ML20137R840)
- ML20137R841 + (ML20137R841)
- ML20137R843 + (ML20137R843)
- IR 05000335/1996022 + (ML20137R844)
- ML20137R846 + (ML20137R846)
- ML20137R847 + (ML20137R847)
- ML20137R848 + (ML20137R848)
- ML20137R849 + (ML20137R849)
- ML20137R850 + (ML20137R850)
- ML20137R852 + (ML20137R852)
- 05000255/LER-1986-003, :on 860106,discovered Undocumented Jumper Wire in EEQ-listed Limitorque motor-operated Valve Operators. Caused by pre-1970 Installation of Wire.Wires Replaced.W/ + (ML20137R855)
- ML20137R856 + (ML20137R856)
- ML20137R860 + (ML20137R860)
- 05000277/LER-1985-028-02, :on 851227,fuse Supplying Relay Coil Blew. Caused by Stray Strands of Wire in Contact W/Dc Volt. Safety-related Feedwater & Ventilation GE CR-120 Relays Inspected for Stray Wires + (ML20137R862)
- ML20137R867 + (ML20137R867)
- ML20137R868 + (ML20137R868)