- 05000361/LER-1985-054, :on 851025,determined That 60-month Surveillance Requirement 4.8.4.1.b Exceeded on Containment Penetration Conductor Overcurrent Protective Devices 2BF08 & 2BF09.Devices Last Surveyed on 780706 & 0512 + (ML20137Q800)
- ML20137Q801 + (ML20137Q801)
- ML20137Q803 + (ML20137Q803)
- ML20137Q804 + (ML20137Q804)
- ML20137Q805 + (ML20137Q805)
- ML20137Q809 + (ML20137Q809)
- U-600421, Provides Update on Const Schedule,Per 810529 Request.New Organization Formed to Coordinate Fuel Load Readiness. Integrated Leak Rate Test Successfully Completed.Eccs/Loss of Offsite Power Testing Incomplete + (ML20137Q812)
- ML20137Q813 + (ML20137Q813)
- ML20137Q815 + (ML20137Q815)
- ML20137Q816 + (ML20137Q816)
- B11951, Requests Exemption from Requirements of 10CFR50.49 for 11 Valve Motor Operators,Per 10CFR50.12(a).Justification Based on Application of 10CFR50.22(a)(2)(iii).Fee Paid + (ML20137Q820)
- ML20137Q823 + (ML20137Q823)
- PY-CEI-NRR-0432, Forwards Application to Amend CPPR-148,extending Const Completion Date.Fee Paid + (ML20137Q824)
- ML20137Q830 + (ML20137Q830)
- ML20137Q831 + (ML20137Q831)
- ML20137Q832 + (ML20137Q832)
- ML20137Q834 + (ML20137Q834)
- ML20137Q835 + (ML20137Q835)
- ML20137Q836 + (ML20137Q836)
- ML20137Q839 + (ML20137Q839)
- ML20137Q840 + (ML20137Q840)
- ML20137Q841 + (ML20137Q841)
- ML20137Q842 + (ML20137Q842)
- ML20137Q843 + (ML20137Q843)
- SNRC-1230, Requests Training Program Authorizing Substitution of 3 Months on-shift Experience at Levels Less than or Equal to 5% Thermal Power & 2 Wks Observation Training at Levels Greater than or Equal to 20% Thermal Power.Fee Paid + (ML20137Q846)
- ML20137Q850 + (ML20137Q850)
- U-600434, Confirms That Corrective Action Completed for Observation Repts 1,10,29,34,55,57,64 & 74.Gaps Between Batteries & Battery rack-end Rails Eliminated by Installing Spacers Between End Cells & Battery rack-end Rails + (ML20137Q851)
- ML20137Q852 + (ML20137Q852)
- ST-HL-AE-1595, Submits Addl Info Re Draft Ser/Fsar Items Re NUREG-0737, Item II.B.3 on post-accident Sampling Sys.Instrumentation Will Be Calibr Every 6 Months.Frequency May Be Revised Based on Evaluations of Industry Experience + (ML20137Q855)
- ML20137Q856 + (ML20137Q856)
- ML20137Q857 + (ML20137Q857)
- U-600435, Advises That Postulated High Energy Pipe Breaks Inside Drywell Reviewed for Jet Impingement Effects on Grating.Two Postulated Breaks Will Produce Direct Jet Forces Perpendicular to Grating.Grating Will Not Be Displaced + (ML20137Q859)
- PNO-I-86-009A, on 860204,plant Restarted Following Outage to Replace Turbine Extraction Steam Bellows Inside Main Condenser + (ML20137Q862)
- ML20137Q863 + (ML20137Q863)
- ML20137Q864 + (ML20137Q864)
- ML20137Q869 + (ML20137Q869)
- ML20137Q870 + (ML20137Q870)
- ML20137Q873 + (ML20137Q873)
- ML20137Q874 + (ML20137Q874)
- ML20137Q877 + (ML20137Q877)
- ML20137Q880 + (ML20137Q880)
- ML20137Q881 + (ML20137Q881)
- ML20137Q882 + (ML20137Q882)
- ML20137Q883 + (ML20137Q883)
- ML20137Q886 + (ML20137Q886)
- ML20137Q889 + (ML20137Q889)
- ML20137Q890 + (ML20137Q890)
- ML20137Q891 + (ML20137Q891)
- ML20137Q892 + (ML20137Q892)
- ML20137Q894 + (ML20137Q894)
- ML20137Q895 + (ML20137Q895)