Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000338/1985023 + (ML20137B814)
- ML20137B815 + (ML20137B815)
- ML20137B818 + (ML20137B818)
- ML20137B821 + (ML20137B821)
- ML20137B822 + (ML20137B822)
- ML20137B823 + (ML20137B823)
- ML20137B824 + (ML20137B824)
- AECM-86-0008, Submits Evaluation of Test Results of Interplant Communication Sys for NRC Review within 90 Days of Completion.Sys Inadequate in Fire Water Pumphouse & Divs I-III Diesel Generator Bldgs.Design Change Request Issued + (ML20137B825)
- ML20137B826 + (ML20137B826)
- ML20137B827 + (ML20137B827)
- NSD-NRC-97-5014, Forwards Draft Seismic Margin Analysis (PRA Chapter 55) & Responses to Requests for Addl Info.Nrc Expected to Review Draft PRA Chapter 55 & Responses Provided in Encl 2 Preparation for Meeting Between Westinghouse & NRC + (ML20137B828)
- ML20137B829 + (ML20137B829)
- ML20137B831 + (ML20137B831)
- ML20137B837 + (ML20137B837)
- ML20137B839 + (ML20137B839)
- ST-HL-AE-1314, Forwards Amend 1 to Fire Hazards Analysis Rept,South Texas Project,Units 1 & 2, for Review.Amend Incorporates Commitment to 10CFR50,App R & Info Re Two Redundant Safe Shutdown Paths Remaining After Fire + (ML20137B840)
- IR 05000924/2010027 + (ML20137B841)
- ML20137B842 + (ML20137B842)
- ML20137B843 + (ML20137B843)
- ML20137B847 + (ML20137B847)
- TXX-4538, Forwards Comanche Peak Response Team Policy on Qa.List of Engineering Research Council & Environ Svcs Div QA Procedures Re Qa/Qc Review Team Work Also Encl.Establishment of Overview Quality Team Discussed + (ML20137B848)
- ML20137B850 + (ML20137B850)
- ML20137B854 + (ML20137B854)
- ML20137B855 + (ML20137B855)
- ML20137B858 + (ML20137B858)
- IR 05000440/1985076 + (ML20137B860)
- ML20137B861 + (ML20137B861)
- ML20137B865 + (ML20137B865)
- ML20137B866 + (ML20137B866)
- ML20137B867 + (ML20137B867)
- RC-97-0056, Informs That Westinghouse Nuclear Safety Advisory Ltr 96-004 Is Not Applicable to VC Summer Nuclear Station + (ML20137B869)
- ML20137B871 + (ML20137B871)
- ML20137B873 + (ML20137B873)
- ML20137B874 + (ML20137B874)
- ML20137B875 + (ML20137B875)
- IR 05000354/1985045 + (ML20137B876)
- ML20137B878 + (ML20137B878)
- ML20137B881 + (ML20137B881)
- ML20137B882 + (ML20137B882)
- B11638, Forwards Reviews of Integrated Safety Assessment Program Topics,Including 1.01 Re Gas Turbine Generator Start Logic mods,1.04 Re Reactor Water Cleanup Sys Pressure Interlock, 1.05 Re Ventilation Sys & 1.15 Re FSAR Update + (ML20137B883)
- ML20137B885 + (ML20137B885)
- ML20137B887 + (ML20137B887)
- ML20137B890 + (ML20137B890)
- ML20137B891 + (ML20137B891)
- 05000361/LER-1997-003, :on 970225,out of Tolerance Condition Identified During Testing of Pressurizer Safety Valve Setpoints.Caused by Setpoints Drift.Setpoints Bounded by Analysis + (ML20137B892)
- ML20137B893 + (ML20137B893)
- ML20137B894 + (ML20137B894)
- LD-85-039, Informs That Vendor Will Add Interface to CESSAR App B Item III.A.1.2 (Upgrade Emergency Support Facilities) to Facilitate Closeout of SPDS Issue.Requirement Will Be Added to CESSAR in Amend 10 or 11 + (ML20137B896)
- ML20137B897 + (ML20137B897)
- ML20137B898 + (ML20137B898)
- ML20137B899 + (ML20137B899)