Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135F328 + (ML20135F328)
- ML20135F329 + (ML20135F329)
- ML20135F330 + (ML20135F330)
- ML20135F331 + (ML20135F331)
- ML20135F332 + (ML20135F332)
- ML20135F333 + (ML20135F333)
- ML20135F334 + (ML20135F334)
- ML20135F335 + (ML20135F335)
- NPL-97-072, Provides Suppl Info for TS Change Request 192,proposing to Modify TS Section 15.3.3, Eccs,Auxiliary Cooling Sys,Air Recirculation Fan Coolers & Containment Spray to Incorporate AOTs Similar to NUREG-1431,Rev 1 + (ML20135F336)
- ML20135F337 + (ML20135F337)
- ML20135F338 + (ML20135F338)
- ML20135F339 + (ML20135F339)
- ML20135F342 + (ML20135F342)
- ML20135F343 + (ML20135F343)
- ML20135F344 + (ML20135F344)
- ML20135F346 + (ML20135F346)
- ML20135F347 + (ML20135F347)
- ML20135F349 + (ML20135F349)
- ML20135F350 + (ML20135F350)
- ML20135F353 + (ML20135F353)
- ML20135F355 + (ML20135F355)
- ML20135F356 + (ML20135F356)
- TXX-4554, Forwards Deletion to Page 43 of Rev 4 to Physical Security Plan.Page Withheld (Ref 10CFR2,50,70 & 73) + (ML20135F357)
- ML20135F358 + (ML20135F358)
- B11646, Forwards Draft Connecticut Yankee Plant Design Change Task Group, Final Rept, Review of Design Change Process, Plant Design Change Evaluations & Screening of Plant Design Changes, Per NRC Request During 850801-02 Audit + (ML20135F359)
- ML20135F360 + (ML20135F360)
- ML20135F361 + (ML20135F361)
- ML20135F363 + (ML20135F363)
- ML20135F364 + (ML20135F364)
- ML20135F365 + (ML20135F365)
- ML20135F366 + (ML20135F366)
- ML20135F368 + (ML20135F368)
- ML20135F370 + (ML20135F370)
- ML20135F371 + (ML20135F371)
- 05000362/LER-1984-038-01, :on 840922,power Reduction from 100% Power Initiated to Perform Scheduled Surveillances & Maint Items. Caused by Iodine Spiking.Primary Coolant Activity Monitored + (ML20135F372)
- ML20135F373 + (ML20135F373)
- ML20135F374 + (ML20135F374)
- DD-96-14, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision DD-96-14 Has Expired & Decision Became Final Agency Action on 961202. W/Certificate of Svc.Served on 961206 + (ML20135F375)
- PY-CEI-NRR-2147, Forwards Changes to Emergency Plan for Plant Which Constitute Revs,Temporary Changes or Reissued Pages + (ML20135F376)
- ML20135F378 + (ML20135F378)
- ML20135F385 + (ML20135F385)
- ML20135F387 + (ML20135F387)
- ML20135F388 + (ML20135F388)
- ML20135F390 + (ML20135F390)
- ML20135F392 + (ML20135F392)
- 05000373/LER-1984-014-08, :on 840301,while Performing Electrical Surveillance LES-R1-01,electrical Jumper Installed in Incorrect Panel,Causing Reactor Recirculation Pump Trip. Caused by Procedure Error.Jumper Removed + (ML20135F393)
- ML20135F394 + (ML20135F394)
- RBG-22-003, Final Deficiency Rept DR-322 Re Loss of Water from Standby Cooling Tower.Initially Reported on 850823.Galvanized Angle Bolted to Concrete Walkways Installed at Each of Four Air Intake Cells of Standby Cooling Tower + (ML20135F396)
- 05000354/LER-1996-025, Forwards LER 96-025-00.Commitments Listed Including Work Order Initiated to Install Recording Instrumentation to Determine Actual Line Dynamics During Next RCIC warm-up + (ML20135F397)
- IR 05000413/1985020 + (ML20135F398)
- ML20135F399 + (ML20135F399)