ML20135F331

From kanterella
Jump to navigation Jump to search
Forwards Rev 12 to Physical Security Plan.Changes Include Site Bldg Additions & Mods to Fenceline,New Station Access Badges & Organization Changes.Rev Withheld (Ref 10CFR73.21)
ML20135F331
Person / Time
Site: Cooper Entergy icon.png
Issue date: 08/22/1985
From: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
To: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CNSS854167, NUDOCS 8509170221
Download: ML20135F331 (2)


Text

4 COOPER NUCLE AR STATION Nebraska Public Power District

" ' " 9'A"c"0"~OMis""^i T^ ""'

'hT L.

h CNSS854167 August 22, 1985 L

i n J,inviL is UU Ji SAFEGUMDS NMJION Mr. Robert D. Martin Regional Administrator U.S. Nuclear Regulatory Commission

@hhhM Region IV s

611 Ryan Plaza Drive g

Suite 1000 Arlington, Texas 76011 p

Subject:

Cooper Nuclear Station Safeguards Plan; Report of Change-Revision Number Twelve

Dear Mr. Martin:

The Contingency Plan (Volume II of the CNS Safeguards Plan) is being revised to incorporate numerous security upgrades and other modifications at the Cooper Nuclear Station. These changes include, but are not limited to, site building additions and modifications, fenceline relocation, new station access badges, CNS organization changes, security force re-organization, and a security computer upgrade. Numerous clerical (i.e., capitalization, numerical listing and sequencing, format layout, pagination, identity and date, etc.)

and terminology corrections and substitutions have also been made where necessary. Additionally, Tables 3-1 thru 3-5 have been deleted as they are already a part of Volume I.

Accordingly, Nebraska Public Power District is submitting, in accordance with the provisions _ of _10CFR Part 50._54(pl, a Report of Change to the Cooper Nuclear Statibn Safeguards Plan, levision Eleven. Upon incorporation of this change, the current Safeguards Plan becomes Revision Twelve. We believe, the enciesed changes, annotated by sidebars, do not decrease the safeguards effectiveness of the plan.

The material enclosed herewith contains Safeguards Information as defined by 10CFR Part 73.21 and its discicsure to unauthorized individuals is prohibited.

Therefore, we request the material, with the exception of the cover letter, to bc withheld from public disclosure.

(M.

J.

.. F11 ant Technical Staff Manager Nuclear Power Group JMP:HTH:bs A

F s

j e8 i

  • ll

9 4

ATTACilM3T CONTA NS m:,::a": art 1n SAFEGUMDS

'RRMATION Page 2

Enclosures:

(6 copies of Plan and Volume II title pages, Volume II, Pages 1-35, and Volume II Tables) cc: Director Office of Nuclear Reactor Regulation Attention: Document Control Desk

^

U.S. Nuclear Regulatory Commission Washington, D.C. 20555 w/o encl.

,