Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135E369 + (ML20135E369)
- ML20135E370 + (ML20135E370)
- ML20135E372 + (ML20135E372)
- ML20135E373 + (ML20135E373)
- ML20135E375 + (ML20135E375)
- ML20135E376 + (ML20135E376)
- ML20135E377 + (ML20135E377)
- ML20135E378 + (ML20135E378)
- IR 05000701/2008005 + (ML20135E379)
- ML20135E380 + (ML20135E380)
- ML20135E381 + (ML20135E381)
- B16066, Informs to NRC That Certifications of Permanent Cessation of Power Operation & That Fuel Has Been Permanently Removed from Reactor + (ML20135E382)
- ML20135E383 + (ML20135E383)
- ML20135E384 + (ML20135E384)
- ML20135E385 + (ML20135E385)
- ML20135E386 + (ML20135E386)
- IR 05000412/1985016 + (ML20135E387)
- ML20135E388 + (ML20135E388)
- ML20135E389 + (ML20135E389)
- ML20135E390 + (ML20135E390)
- ML20135E391 + (ML20135E391)
- ML20135E392 + (ML20135E392)
- ML20135E393 + (ML20135E393)
- ML20135E394 + (ML20135E394)
- ML20135E395 + (ML20135E395)
- ML20135E396 + (ML20135E396)
- ML20135E397 + (ML20135E397)
- ML20135E398 + (ML20135E398)
- ML20135E401 + (ML20135E401)
- ML20135E402 + (ML20135E402)
- PNO-IV-96-064, on 961129,license Reviewer Indicating, Experiencing Problem W/Teletherapy Unit Electrical Sys. Technician Concluded,Loose Wire Connection Causing Circuit Interruption,Preventing Activation of Solenoid Connected + (ML20135E406)
- ML20135E410 + (ML20135E410)
- ML20135E411 + (ML20135E411)
- B11669, Requests Four Deviations from Branch Technical Position Cmeb 9.5.1 Re Penetration Seals,Fire Barriers,Concealed Spaces & Internal Sealing of Conduits.Transco,Inc Test Repts TR-193,Rev 0 & TR-194,Rev 0 Encl + (ML20135E412)
- ML20135E413 + (ML20135E413)
- NSD-NRC-96-4893, Forwards Proprietary Version of AP600 Basemat Design Summary Rept of Extensive Calculation Completed to Document Conformance of Basemat Design Criteria + (ML20135E414)
- ML20135E415 + (ML20135E415)
- IR 05000458/1985043 + (ML20135E417)
- ML20135E417 + (ML20135E417)
- ML20135E418 + (ML20135E418)
- PNO-I-96-085, on 961204,board of Directors of Connecticut Yankee Atomic Power Co Voted to Retire Haddam Neck Nuclear Power Generating Station,After Nearly 29 Yrs of Svc.Nrc Responding to Media Inquires & Present at Press Conference + (ML20135E420)
- ML20135E421 + (ML20135E421)
- ML20135E422 + (ML20135E422)
- ML20135E423 + (ML20135E423)
- NG-96-2574, Responds to 961118 Telcon RAI Re Inservice Insp Relief Requests NDE-020 & NDE-R011.Ultrasonic Calibr Data,Provided + (ML20135E424)
- ML20135E425 + (ML20135E425)
- ML20135E426 + (ML20135E426)
- ML20135E427 + (ML20135E427)
- NSD-NRC-97-5003, Forwards Three Copies of W Response to Open Items on AP600 Topics + (ML20135E428)
- RBG-21-915, Responds to Violation Noted in Insp Rept 50-458/85-43 on 850501-0615.Disagrees That Violation Re Failure to Obtain Approval of QA Program Change Occurred.Qa Program on 2-yr Review Basis Effective 830311.No Subsequent Mods to Program + (ML20135E429)
- ML20135E430 + (ML20135E430)