Forwards Insp Rept 50-412/85-16 on 850701-0805 & Notice of Violation
ML20135E370
Person / Time
Site: Beaver Valley
Issue date: 09/10/1985
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Carey J
DUQUESNE LIGHT CO.
Shared Package
ML20135E373 List:
References
NUDOCS 8509160379
Download: ML20135E370 (2)


See also: IR 05000412/1985016

Text

,.7

  • ., >

4,

SEP 101985

Docket No. 50-412

Duquesne Light Company

ATTN: Mr. J. J. Carey

Vice President

Nuclear Group

Post Office Box 4

Shippingport, Pennsylvania 15077

Gentlemen:

Subject: L50ection 50-412/85-16

This refers to the :outine inspection conducted by Messrs. G. A. Walton,

W. M. Troskoski, and L J. Prividy of this office on July 1 - August 5,1985 at

the Beaver Valley Power Station, Unit 2, Shippingport, Pennsylvania of activities

authorized by NRC License No. CPPR-105 and to the discussions of our findings held

by Mr. Prividy with Mr. R. Coupland and other members of your staff at the conclu-

sion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspection

Report which is enclosed with this letter. Within these. areas, the inspection

consisted of selective examinations of procedures and representative records, in-

terviews with personnel, and observations by the inspector.

Based on the results of this inspection, it appears that certain of your activities

were not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A. The violation has been

categorized by severity level in accordance with the revised NRC Enforcement Policy

(10 CFR 2, Appendix C) published in the Federal Register Notice (49 FR 8583) dated

March 8, 1984. You are required to respond to Appendix A and in preparing your

response, you should follow the instructions in Appendix A.

The responses directed by this letter and the accompanying Notice are not subject

to the clearance procedures of the Office of Management and Budget as required by

the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us in this matter is appreciated.

Sincerely,

grav.inal signed Bys

l 8509160379 850910

PDR

-

ADOCK 05000412

! Edward C. Wenzinger, Chief

Projects Branch No. 3

Division of Reactor Projects

Enclosures:

i 1. Appendix A, Notice of Violation

2. NRC Region I Inspection Report 50-412/85-16

f0 ' 1

k.

. _ . . _ _ - ~ =. . _. _. - __ ..- _. ____ _

-

__. _

'

,

. .

Duquesne Light Company 2

1

'

cc w/encls:

E. J. Woolever, Vice President, Nuclear Construction Division

E. Ewing, Quality Assurance Manager

! R. J. Swiderski, Manager, Startup Group

! R. E. Martin, Manager, Engineering

E. F. Kurtz, Jr. , Manager, Regulatory Affairs

,

P. RaySircar, Stone and Webster Engineering Corporation

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

. NRC Resident Inspector

i Commonwealth of Pennsylvania

i

i bcc w/encls:

I

'

Region I Docket Room (with concurrences)

DRP Section Chief

T. Rebelowski, SRI, Millstone 3

i

W. Troskoski, SRI, BV-1

B. Singh, LPM, NRR

1

i

j

i

<

.

!

i

>

!

,

4

'

,

.

! RI:DRP RI:DRP R/

i 90

,

Walton/meo Tripp We i

j

h8/is/8s yff[e ml h!

l OFFI IAL RECORD COPY

l

4  ?

i

i

I

<

I

I

r . . .- - - . _ - - _ . ... .. _ _ - - _ . . . . . _--