Notice of Violation from Insp on 850701-0805
ML20135E379
Person / Time
Site: Beaver Valley, 05000701
Issue date: 09/10/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20135E373 List:
References
50-412-85-16, NUDOCS 8509160381
Download: ML20135E379 (1)


Text

.~

',

... -

.'

  • ,

l APFENDIX A NOTICE OF VIOLATION Duquesne Light Company Docket No. 50-412 Beaver Valley Power Station, Unit 2 License No. CPPR-105 As a result of the inspection conducted on July 1 - August 5,1985, and in accor-dance with the NRC Enforcement Policy (10 CFR 2, Appendix C), the following viola-tion was identified:

10 CFR 50, Appendix B, Criterion XVI requires that measures be established to assure that...nonconformances are promptly identified and corrected.

Contrary to the above, as of August 5,1985, the licensee had not established and implemented a program to assure that nonconformances are promptly cor-rected. As a result, nonconformances remained outstanding on Nonconformance and Disposition (N&D) and Construction Deficiency Reports for such extended periods of time that potential damage has occurred to components and materials may have been installed before corrective actions occurred.

For example, N&D 6758 issued May 26, 1983, identified that non-approved fluorescent tape ap-plied to the surfaces of stainless steel piping potentially contained chlor-ides, halogens, ar.d sulfur. Although disposition of this N&D on June 30, 1983 required the tape to be removed and the areas buffed to remove possible surface contaminates followed by washing with demineralized water to remove residuals, as of July 18, 1985, no such corrective actions had been taken.

In another example, N&D 2009 issued February 24, 1982, identified angle iron containing laminations and scabs.

This N&D was not dispositioned for correc-tive action as of August 2, 1985, and as of August 6, 1985, this material could not be located and may have been installed without any corrective ac-tions being taken.

This is a Severity Level IV Violation (Supplement II).

Pursuant to the provisions of 10 CFR 2.201, Duquesne Light Company is hereby re-quired to submit to this office within thirty days of the date of the letter which

,

'

transmitted this Notice, a written statement or explanation in reply, including:

(1) the corrective steps which have been taken and the results achieved; (2) cor-

'

rective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending this response time.

i

,