Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134M529 + (ML20134M529)
- PY-CEI-NRR-0330, Forwards Response to Telcon Request for Addl Details of Drywall Fire Wall Configurations & Further Analysis of bullet-resistant/drywall Configuration.Test Demonstrated 3 H Fire Rating for Type (B) Doors + (ML20134M531)
- 3F0885-08, Responds to Violations Noted in Insp Rept 50-302/85-27. Corrective Actions:Fuel Movement Suspended Until Restoration of Audible Control Room Indication.Vol Control Knob Readjusted & Procedure Revised + (ML20134M534)
- 3F0885-04, Responds to Violations Noted in Insp Rept 50-302/85-12. Corrective Actions:Procedure RP-101 Re Whole Body Frisk Deleted & Bags Used to Contain Radioactive Matl Revised to Include Radiation Caution Symbol + (ML20134M536)
- ML20134M540 + (ML20134M540)
- ML20134M541 + (ML20134M541)
- ML20134M544 + (ML20134M544)
- ML20134M553 + (ML20134M553)
- ULNRC-03487, Provides Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves + (ML20134M555)
- NSD-NRC-97-4970, Addresses Item 2(f) Re Protection of Regulatory Treatment of Non-Safety Related Sys from Floods & missiles.W/WCAP-13856 & 961209 W Ltr & Submittal of Attached Drawings,W Activity complete.W/6 Oversize Drawings.Withheld.Also See 98093 + (ML20134M557)
- ML20134M561 + (ML20134M561)
- ML20134M563 + (ML20134M563)
- IR 05000373/1996018 + (ML20134M565)
- 3F1196-04, Advises That Util Agrees to Implement Actions Requested in GL 96-05, Periodic Verification of Design-Basis Capabilities of Safety-Related Motor-Operated Valves & Considers Required Actions Satisfied by MOV Program + (ML20134M566)
- ST-HL-AE-1310, Requests Approval to Apply ASME Code Case N-413, Min Size of Fillet Welds for Linear Type Supports, Criteria on All Welds Specified on Pipe Support Drawing or Detail.Listed Requirements Will Be Met + (ML20134M569)
- ML20134M571 + (ML20134M571)
- BECO-LTR-96-099, Responds to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves + (ML20134M573)
- IR 05000352/1997002 + (ML20134M575)
- ML20134M576 + (ML20134M576)
- ML20134M578 + (ML20134M578)
- ML20134M579 + (ML20134M579)
- ML20134M582 + (ML20134M582)
- ML20134M583 + (ML20134M583)
- ML20134M584 + (ML20134M584)
- 05000331/LER-1996-005, :on 961020,PCIS Groups 3 & 5 Isolations Occurred Due to Temporary Power Connections to Istrument Ac. Temporary Power Cart That Was Also Connected to 1BR8601 Was Removed + (ML20134M585)
- ML20134M586 + (ML20134M586)
- ML20134M587 + (ML20134M587)
- 05000341/LER-1996-015, :on 961015,ESF Actuation of Division 2 EECW Occurred During Fill & Vent Evolution of Portion of Sys Located in Drywell Due to Personnel Error.Licensed & non-licensed Operators Were Trained + (ML20134M588)
- ML20134M589 + (ML20134M589)
- ML20134M590 + (ML20134M590)
- ML20134M591 + (ML20134M591)
- ML20134M592 + (ML20134M592)
- ML20134M594 + (ML20134M594)
- ML20134M595 + (ML20134M595)
- ML20134M596 + (ML20134M596)
- 05000309/LER-1996-032, :on 961016,NNS Load Connected to 1E Power Source Without an Isolation Device Identified.Cause Unknown. TV-4001 Part of Circuit Isolated by Opening Slide Links in Mcb & Controlling Slide Links W/Tag Order + (ML20134M597)
- ML20134M598 + (ML20134M598)
- PY-CEI-NRR-2114, Submits Actions That Will Be Implemented by 970317 in Response to GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs + (ML20134M599)
- ST-HL-AE-1345, Provides Schedule for Response to Generic Ltr 85-12, Implementation of TMI Action Item II.K.3.5, `Automatic Trip of Reactor Coolant Pumps. Info in Parts B & C of Safety Evaluation Will Be Submitted by 851101 + (ML20134M600)
- 3F0297-06, Requests Changes to Svc List & Informs NRC from Whom to Expect to Receive Docketed Items + (ML20134M601)
- NG-96-2344, Forwards NRC Form 474, Simulator Facility Certification, Due to Changes in Performance Testing Plan,Per 10CFR55.45. Description of Performance Tests Completed from Apr 1995 to Apr 1996 & Performance Test Schedule for 1996-1999,encl + (ML20134M602)
- BECO-85-158, Provides Clarification to Design Info Submitted on 850530 for TMI Items II.B.3 Re post-accident Sampling Sys & II.F.1(6) Re H2/O2 Monitoring Sys.Corrected Table of Analysis Methods & Detection Limits for H2 & O2 Provided + (ML20134M603)
- 05000309/LER-1996-033, :on 961018,entry Into TS 3.0.A for Both Pressurizer Proportional Heater Banks Inoperable Occurred. Caused by Fuse Failure.Fuse & SCR Were Replaced + (ML20134M605)
- ML20134M606 + (ML20134M606)
- NG-96-2452, Forwards Duane Arnold Energy Ctr Cycle 15 COLR, Rev 0 + (ML20134M608)
- ML20134M610 + (ML20134M610)
- ML20134M611 + (ML20134M611)
- ML20134M613 + (ML20134M613)
- ML20134M614 + (ML20134M614)
- IR 05000369/1985026 + (ML20134M615)
- ML20134M616 + (ML20134M616)