Submits Response to GL 96-05, Periodic Verification of Design-Bases Capability of Safety-Related Motor-Operated Valves
ML20134M578
Person / Time
Site: Peach Bottom, Limerick  Constellation icon.png
Issue date: 11/15/1996
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-96-05, GL-96-5, NUDOCS 9611250166
Download: ML20134M578 (3)


Text

- - . - . -- . . - . ~ ~ . . . . - . . - .-. -. . . - - - . .. - . - ~ . .. .

4 OtCtion Support DepDrtmCnt l '

& GL 9645

, 55:~

PECO NUCLEAR. eeco emerov comneev 965 Chesterbrook Boulevard A Unit of PECO Energy Wayne. PA 19087-5691 November 15,1996

[ Docket Nos. 50-277 f 50-278

50452
50-353 l License Nos. DPR-44 l DPR-56 NPF-39 NPF-85 y

U. S. Nuclear Regulatory Commission 5

ATTN: Document Control Desk -

Washington, DC 20555 4

SUBJECT:

Peach Bottom Atomic Power Station, Units 2 and 3 Limerick Generating Station, Units 1 and 2 Response to Generic Letter 96-05, " Periodic Verification of Design-Bases

] Capability of Safety-Related Motor 4perated Valves" i

REFERENCES:

1) Letter from D. R. Helwig (PECO Energy Company) to US j Nuclear Regulatory Commission (USNRC) dated December 28, 1989
2) Letter from D. R. Helwig (PECO Energy Company) to USNRC i dated March 16,1992 i

j 3) Letter from G. A. Hunger, Jr. (PECO Energy Company) to

, URNRC dated April 14,1994 i

j 4) Letter from G. A Hunger, Jr. (PECO Energy Company) to

USNRC dated C,9 comber 21,1994 j 5) Letter from G. A. Hunger, Jr. (PECO Energy Company) to USNRC dated June 16,1995
6) Letter from G. A. Hunger, Jr. (PECO Energy Company) to USNRC dated August 2,1995
7) Letter from G. A. Hunger, Jr. (PECO Energy Company) to USNRC dated December 29,1995

Dear Sir:

In response to GL 80-10, PECO Energy Company (PECO Energy) oeveloped and implemented a program to verify the design basis capability of motor-operated valves (MOVs) within the scope of the GL program. PECO Energy has made a significant commitment of resources toward implementing the GL 89-10 program. Completion of the program involved more than a five year 0 effort. ,

, J,- [) Il r; o 4

-9611250166 961115 I.

PDR ADOCK 05000277 P PDR

! )

l November 15,1996

, Page 2

, l

l Geneth etter (GL) 9646 dated September 18,1996 raquante licensees to commit within 60 1

days to e rtogram to verify on a periodic basis that safety-related motor-operated valves (MOV) continue to be capahle d performing their safety 8 unctions. As part of our GL 89-10 program, we have established a program to periodically verify that the safety-related MOVs continue to be capable of performing their safety functions within the current Licensing bases of the facility.

l PECO Energy will review our current periodic verification program and determine whether any j changes are appropriate in ligt:t of the information presented in GL 9645.

GL 9646 also requests that a summary description of the MOV periodic verification program be
submitted by March 17,1997. PECO Energy will complete the review of the existing program j snd provide a verification program summary description by March 17,1997, i

Finally, the generic letter requests a schedule for completing implementation of the MOV I t

periodic verification program. As stated previously, PECO Energy is already implementing an

established periodic verification program. Based on the results of our evaluetion of our existing i

! program in light of the information presented in GL 9645, PECO Energy will provide a more

! definitive implementation schedule with our verification program summary dese % by March

{ 17,1997.

j If you have any questions, please contact us.

Wy truly yours, J.d.& J.

G. A. Hunger, Jr

)

Director - Licensing i

Attachment, Affidavit d

i cc: H. J. Miller, Administrator, Region I, USNRC (w/ attachment)

W. L Schmidt, USNRC Senior Resident inspector, PBAPS (w/ attachment)

N. S. Perry, USNRC Senior Resident inspector, LGS (w/ attachment) l i

V  :

l A

1 i

)

i I

a

.-m., -_.c- - ' '

COMMONNEALTH OF PENNSYLVANIA  :

SS COUNTY OF CHESTER  :

l 1

5 D. B. Fetters, being first duly swom, deposes and says:

That he is Vice President of PECO Energy Company; that he has read the enclosed response to Generic Latter 9o-06 dated September 18,1996, for Peach Bottom Facky Operating Licenses DPR-44 and DPR-56 and Limerick Operating Licenses NPF-39 and NPF-85, and knows the contents thereof; and 4

that the statements and matters set forth therein are true and correc* to the best of his knowledge,

\

, information and belief.

l r

hM)

Vice Prosident Subscribed and swom to before me this /5* day of M 1998.

& La ry Public i

, n. ...... mms 1

,b .A .e W_ ry Lms tr; . f t:3Y Puh i r 0, '.'

D dyena Ts.,., .

j, 1' i

,,n --

c. .t ,1

. ur