February 12, 1997
.
Mr. D. M. Smith, President
PECO Nuclear-
,
l
Nuclear Group Headquarters
Correspondence Control Desk
P. O. Box 195
Wayne, Pennsylvania 19087-0195
SUBJECT:
INITIAL OPERATOR EXAMINATION REPORTS 50-352/97-02 (OL),'
50-353/97-02 (OL)
L
{
Dear Mr. Smith:
!
This report transmits the findings of the initial operator examination conducted by NRC
examiners in the period of January 20 - 24,1997, at the Limerick Generating Station. At
the conclusion of the examination, Mr. D. Florek discussed the examination observations
with Mr. R. Boyce.
Based on the results of the examination, the applicants were generally well prepared for
the examination. Six of seven applicants passed the examination and were subsequently
-
issued licenses. One SRO applicant did not pass the walkthrough portion of the operating
,
examination.
,
The initial licensing examination was prepared by your staff, with NRC oversight, in
accordance with the pilot operator licensing initial examination process. The administered
l
examination was of high quality and was consistent with the NRC Examiner Standards.
l
However, significant changes were required to your staff's proposed sample plan, written
examination and operating examination to ensure that the administered examination was
consistent with the NRC Examiner Standards.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosures will be niaced in the NRC Public Document Room.
l
t
1
'
4
.
[
9702200284 970212
i
ADOCK 05000352
1
i
.
. . - _ . . ..
__. . _ _ . _ _ . _
.
_ . -
..-
. . .
. _ - _ _ _ - . _ _ = _ . _ _ _ _ . . . .
-
.
i
!
,
'
D. M. Smith
2
No reply to this letter is required, but should you have any questions regarding this
examination, please contact me at 610-337-5211.
!
!
!
Sincerely,
l
i
-
.
-
[
I
'
<
Glenn W. Meyer, Chief
Operator Licensing and
l
Human Performance Branch
f
Division of Reactor Safety
Docket Nos. 50-352, 50-353
- -
Enclosure:
NRC Region I Combined Examination inspection Report 50-352/97-02 (OL)
'
and 50-353/97-02 (OL) w/ Attachments 1-4
\\
\\
!
cc w/ encl; w/o Attachments 1-4:
G. A. Hunger, Jr., Chairman, Nuclear Review Board and Director - Licensing
l
W. MacFarland, Vice President - Limerick Generating Station
'
l
J. L. Kantner, Regulatory Engineer - Limerick Generating Station
Secretary, Nuclear Committee of the Board
l
Commonwealth of Pennsylvania
cc w/ encl and Attachments 1-4:
l
L. Hopkins, Superintendent - Training
l
T. Dougherty, Manager - Operations Training
t
I
i
(
i
.
!
.
4
!
l
!
.
- _,
, , .
ps.9Kloy
M-
b
,
'
E
e,
UNITED STATES
6
NUCLEAR RECULATORY COMMISSION
o
5
=E
REGloN I
0,,
475 ALLENDALE ROAD
%
KING oF PRUSSIA, PENNSYLVANIA 19406-1415
February 12, 1997
Mr. D. M. Smith, President
PECO Nuclear.
'
Nuclear Group Headquarters
Correspondence Control Desk
P. O. Box 195
Wayne, Pennsylvania 19087-0195
l
SUBJECT:
INITIAL OPERATOR EXAMINATION REPORTS 50-352/97-02 (OL),
l
50-353/97-02 (OL)
Dear Mr. Smith:
This report transmits the findings of the initial operator examination conducted by NRC
examiners in the period of January 20 - 24,1997, at the Limerick Generating Station. At
the conclusion of the examination, Mr. D. Florek discussed the examination observations
,
with Mr R. Boyce.
l
l
Based on the results of the examination, the applicants were generally well prepared for
i
the examination. Six of seven applicants passed the examination and were ' subsequently
l
issued licenses. One SRO applicant did not pass the walkthrough portion of the operating
i-
examination.
The initial licensing examination was prepared by your staff, with NRC oversight, in
~
accordance with the pilot operator licensing initial examination process. The administered
examination was of high quality and was consistent with the NRC Examiner Standards.
However, significant changes were required to your staff's proposed sample plan, written
examination and operating examination to ensure that the administered examination was
consistent with the NRC Examiner Standards.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosures will be placed in the NRC Public Document Room.
I
l
\\
{
_
.
.
__ -
-.
-
_ _ -
.-
.
-
.
l
-
,
l
'
l
l*-
D. M. Smith
3
Distribution w/enci and Attachments 1-4:
DRS Master Exam File
PUBLIC
Nuclear Safety information Center (NSIC)
Distribution w/ encl: w/o Attachments 1-4:
Region i Docket . Room (with concurrences)
l
K. Gallagher, DRP
D. Screnci, PAO
NRC Resident inspector
J. Wiggins, DRS
'
D. Florek, Chief Examiner, DRS
i
R. Boyce, Contract Examiner
NRC Resident inspector
l
DRS File (2)
1
Distribution w/ encl: w/o Attachments 1-4 (Via E-Mail):
.
l
R. Correia, NRR
W. Dean, OEDO
l
R. Frahm, Jr., NRR
'
l
S. Richards, OLB/NRR
l
F. Rinaldi, NRR
J. Stolz, PDI-2, NRR
l
,
l
int.pection Program Branch, NRR (IPAS)
.
l
1
t
l
i
l
i
DOCUMENT NAME: A:\\ LIM 9702 INS
n
i . ,, . we.com.nt. i ec.t. in m. ws: c - copy wthovi .ti. chm.nti.ncio.ur.
- Copy with ett. chm.nt/.ncio.ur.
N = No copy
0FFICE
Ff /pftL
l
RI/DRS
l
Rl/
l
l
l
NAME
.DiQsf40
GMEYER
Ls,s
DATE
07/07/97
02/IV/97 C'
02/
/97
02/
/97
02/
/97
OFFICIAL RECORD COPY
,
>
l
i
P
,-
l'
D. M. Smith
2
No reply to this letter is required, but should you have any questions regarding this
examination, please contact me at 610-337-5211.
Sincerely,
.
O N [. /,
Glenn W. Meyer, Chief
Operator Licensing and
Human Performance Branch
Division of Reactor Safety
Docket Nos. 50-352,50-353
Enclosure:
NRC Region l Combined Examination Inspection Report 50-352/97-02 (OL)
and 50-353/97-02 (OL) w/ Attachments 1-4
cc w/ encl; w/o Attachments 1-4:
G. A. Hunger, Jr., Chairman, Nuclear Review Board and Director - Licensing
W. MacFarland, Vice President - Limerick Generating Station
J. L. Kantner, Regulatory Engineer - Limerick Generating Station
Secretary, Nuclear Committee of the Board
Commonwealth of Pennsylvania
l