Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000312/1985021 + (ML20134F339)
- ML20134F340 + (ML20134F340)
- ML20134F342 + (ML20134F342)
- ML20134F344 + (ML20134F344)
- ML20134F345 + (ML20134F345)
- ML20134F347 + (ML20134F347)
- ML20134F349 + (ML20134F349)
- ML20134F350 + (ML20134F350)
- ML20134F351 + (ML20134F351)
- HL-5250, Requests NRC Authorization of Alternative Exam Per Provisions of 10CFR50.55(g)(6)(ii)(A)(5) for Shell Welds on Plant,Unit 2 + (ML20134F354)
- B11657, Forwards Tech Spec Page 3-4a Inadvertently Omitted from Attachment 1 of 850709 Submittal Re Proposed Changes to Tech Specs in Response to Generic Ltr 83-43 Covering Reactor Coolant Loops + (ML20134F356)
- ML20134F357 + (ML20134F357)
- ML20134F358 + (ML20134F358)
- ML20134F360 + (ML20134F360)
- ML20134F361 + (ML20134F361)
- ML20134F363 + (ML20134F363)
- ML20134F365 + (ML20134F365)
- BVY-96-135, Responds to NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs. Provides Info Requested Re Actions Taken to Reduce Potential for ECCS Strainer Clogging + (ML20134F370)
- ML20134F371 + (ML20134F371)
- ML20134F372 + (ML20134F372)
- ML20134F373 + (ML20134F373)
- ML20134F375 + (ML20134F375)
- ML20134F376 + (ML20134F376)
- ML20134F377 + (ML20134F377)
- ML20134F378 + (ML20134F378)
- ML20134F379 + (ML20134F379)
- ML20134F381 + (ML20134F381)
- ML20134F382 + (ML20134F382)
- ML20134F383 + (ML20134F383)
- ML20134F384 + (ML20134F384)
- ML20134F386 + (ML20134F386)
- ML20134F387 + (ML20134F387)
- ML20134F388 + (ML20134F388)
- ML20134F389 + (ML20134F389)
- ML20134F390 + (ML20134F390)
- ML20134F391 + (ML20134F391)
- U-600221, Forwards Rev a to Clow Corp Rept 6-18-85, Purge & Vent Valve Operability Qualification Analysis, Per 850715 Commitment & SER Confirmatory Issue 69ii.Valves Meet Criteria of NUREG-0800 & TMI Action Plan Item II.E.4.2 + (ML20134F392)
- ML20134F393 + (ML20134F393)
- ML20134F395 + (ML20134F395)
- BECO-LTR-96-090, Advises That Written Summary Report Will Be Submitted to NRC Re GL 96-06, Assurance of Equipment Operability & Integrity During Design-Basis Accident Conditions, within 120 Days + (ML20134F396)
- AECM-85-0252, Responds to NRC 850705 Request for Addl Info Re Structural Analyses Presented in Application for Amend to License NPF-29,authorizing Installation of High Density Spent Fuel Racks.Info Re Numerical Solution of Dynamic Analyses Encl + (ML20134F397)
- ML20134F398 + (ML20134F398)
- ML20134F399 + (ML20134F399)
- ML20134F400 + (ML20134F400)
- ML20134F401 + (ML20134F401)
- ML20134F404 + (ML20134F404)
- ML20134F405 + (ML20134F405)
- ML20134F406 + (ML20134F406)
- ML20134F407 + (ML20134F407)
- ML20134F408 + (ML20134F408)
- ML20134F410 + (ML20134F410)