Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133P516 + (ML20133P516)
- ML20133P517 + (ML20133P517)
- ML20133P518 + (ML20133P518)
- ML20133P520 + (ML20133P520)
- ML20133P521 + (ML20133P521)
- ML20133P522 + (ML20133P522)
- IR 05000333/1985026 + (ML20133P524)
- ML20133P525 + (ML20133P525)
- ML20133P526 + (ML20133P526)
- 05000219/LER-1996-015, :on 961220,determined RWCU Isolation Valves May Not Operate During Line Break Due to non-conservative Analysis.Provided Interim Guidance to Licensed Operators Re RWCU Sys & Bypassed Thermal Overloads + (ML20133P527)
- ML20133P528 + (ML20133P528)
- ML20133P529 + (ML20133P529)
- ML20133P531 + (ML20133P531)
- ML20133P532 + (ML20133P532)
- ML20133P533 + (ML20133P533)
- 05000373/LER-1996-020-04, :on 961217,discovered Div 2 Piping Supplying RHR Heat Exchanger Out of Design Basis.Cause Indeterminate. Installed Keep Fill Sys to Eliminate Potential for Water Hammer During Design Basis Events + (ML20133P534)
- ST-HL-AE-1464, Forwards Response to Draft Ser/Fsar Chapter 7A,Item II.F.2 Open Items.Listed Items Correspond to Internal List of Items for Completion Given to Np Kadambi by Me Powell on 851008. Marked-up FSAR Pages Will Be Incorporated Into Amend + (ML20133P535)
- ML20133P536 + (ML20133P536)
- ML20133P539 + (ML20133P539)
- ML20133P540 + (ML20133P540)
- ML20133P542 + (ML20133P542)
- ML20133P543 + (ML20133P543)
- 05000373/LER-1996-021-03, :on 961217,identified Inconsistency Between TS Clarification Re Main Control Room Atmospheric Control Sys (Mcracs) Radiation Monitoring Sys & TS 3.4.7.1.Caused by Inadequate Review.Will Issue Supplemental LER + (ML20133P544)
- ML20133P545 + (ML20133P545)
- ML20133P547 + (ML20133P547)
- ML20133P548 + (ML20133P548)
- ML20133P549 + (ML20133P549)
- ML20133P550 + (ML20133P550)
- ML20133P551 + (ML20133P551)
- IR 05000285/1985018 + (ML20133P552)
- ML20133P555 + (ML20133P555)
- ML20133P556 + (ML20133P556)
- ML20133P557 + (ML20133P557)
- ML20133P559 + (ML20133P559)
- ML20133P561 + (ML20133P561)
- ML20133P562 + (ML20133P562)
- ML20133P563 + (ML20133P563)
- PNO-I-97-007A, on 970122,update of Status of Lost Package Containing 1 Mci of I-125 Occurred.Vial Verified to Be Missing Vial by Licensee.State of MD Notified by Region I + (ML20133P565)
- ML20133P566 + (ML20133P566)
- ML20133P568 + (ML20133P568)
- ML20133P570 + (ML20133P570)
- PNO-I-97-008, 970123,manual Reactor Scram Initiated at FitzPatrick Nuclear Plant,When Decreasing Lake Intake Water Level Indication Noted.All Rods Inserted & Sys Functioned as Required + (ML20133P572)
- ML20133P573 + (ML20133P573)
- ML20133P575 + (ML20133P575)
- ML20133P576 + (ML20133P576)
- ML20133P579 + (ML20133P579)
- 05000311/LER-1985-013-01, :on 850706,generator Field Ground Alarm Received During Testing of Diesel Generator 2B.Caused by Malfunctioning Field Ground Relay.Mechanical Latch Associated W/Relay Aligned & Tested + (ML20133P581)
- ML20133P582 + (ML20133P582)
- PNO-III-85-063A, investigation Concluded That Vibration in South Reactor Feeder Pump Turbine,Plus Inadequate Securing of Outboard Bearing Cap Caused Turbine Failure.Study of Problem Continuing + (ML20133P583)
- ML20133P584 + (ML20133P584)
- PNO-III-97-004, on 970124,truck Carrying Four U Hexafluoride Cylinders in Accident Occurred.Truck Transporting Cylinders from Portsmouth Gaseous Diffusion Plant to Siemens Power Corp in Richland,Washington + (ML20133P587)