Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133C274 + (ML20133C274)
- 05000259/LER-1985-034, :on 850629,discovered That 850122 Charcoal Sample Not Shipped Offsite for Vendor Analysis.Sample Lost. Administrative Controls Prepared to Add More Assurance That All Samples Properly Handled + (ML20133C276)
- ML20133C277 + (ML20133C277)
- ML20133C285 + (ML20133C285)
- ML20133C289 + (ML20133C289)
- ML20133C290 + (ML20133C290)
- ML20133C291 + (ML20133C291)
- ML20133C293 + (ML20133C293)
- ML20133C294 + (ML20133C294)
- ML20133C295 + (ML20133C295)
- B11722, Confirms That Portions of CRD Mechanism Do Not Contain Any cold-worked Austenitic Stainless Steel,Including Portions Which Are Part of Rcpb.Requirements of 10CFR50,App a, Criterion 26 Met,Per SER Confirmatory Item 16 + (ML20133C296)
- B11714, Forwards Review of Integrated Safety Assessment Program, Topics 2.29, Feedwater Coolant Injection Assessment Study, 2.30, MSIV Closure Test Frequency & 2.31, LPCI Lube Oil Cooler Test Frequency, Per NRC 850731 Request + (ML20133C300)
- ML20133C302 + (ML20133C302)
- B11534, Forwards Six Requests for Deviations from Branch Technical Position BTP Cmeb 9.5-1 on Guidelines Re Fire Protection,Per Util 840216 Commitment & 840309 Cmeb Review Meeting.Agenda for Meeting & Supporting Documentation Also Encl + (ML20133C305)
- ML20133C306 + (ML20133C306)
- ML20133C307 + (ML20133C307)
- IR 05000312/1985015 + (ML20133C308)
- ML20133C310 + (ML20133C310)
- ML20133C311 + (ML20133C311)
- ML20133C312 + (ML20133C312)
- ML20133C314 + (ML20133C314)
- ML20133C315 + (ML20133C315)
- ML20133C318 + (ML20133C318)
- ML20133C319 + (ML20133C319)
- ML20133C320 + (ML20133C320)
- ML20133C321 + (ML20133C321)
- ML20133C322 + (ML20133C322)
- IA-85-320, Responds to FOIA Request for Documents Re Vogtle & Hatch Nuclear Power Plants.Request Referred by DOJ Along W/Two NRC Records in DOJ Files.Documents on App Encl + (ML20133C322)
- ML20133C325 + (ML20133C325)
- ML20133C326 + (ML20133C326)
- ML20133C327 + (ML20133C327)
- ML20133C328 + (ML20133C328)
- AECM-85-0291, Forwards Response to NRC Questions Raised in 850815 Telcon Re Generic Ltr 83-28,Item 1.2.Balance-of-plant Points N30N026A,B & C Added to balance-of-plant Computer post-trip Log Will Provide Actual Turbine Bypass Valve Position Info + (ML20133C329)
- ML20133C330 + (ML20133C330)
- ML20133C332 + (ML20133C332)
- ML20133C333 + (ML20133C333)
- ML20133C334 + (ML20133C334)
- B11745, Forwards Response to SER Confirmatory Item 26 Re Administrative Control Over Doors in Secondary Containment. Encl Info Should Resolve Concerns Identified in NRC + (ML20133C336)
- ML20133C337 + (ML20133C337)
- 3F0985-18, Responds to Violations Noted in Insp Rept 50-302/85-33. Corrective Actions:Action Statement Logged & Grab Samples Commenced on 24 H frequency,SP-135B Performed Satisfactorily on 850724 & Valve EFV-7 Placed in Open Position + (ML20133C338)
- ML20133C339 + (ML20133C339)
- U-600254, Forwards Info Justifying Deletion of Automatic Pump Suction Transfer Feature from RCIC & Hpcs,Per SER Section 7.8 + (ML20133C340)
- ML20133C342 + (ML20133C342)
- ML20133C343 + (ML20133C343)
- ML20133C345 + (ML20133C345)
- ML20133C348 + (ML20133C348)
- ML20133C351 + (ML20133C351)
- ML20133C354 + (ML20133C354)
- ML20133C355 + (ML20133C355)
- ML20133C357 + (ML20133C357)
- B16120, Informs That Commitment B15682-MP3-2 Will Be Incorporated Into 10CFR50.54(f) Review to Be Completed Prior to Startup from Current Outage + (ML20133C358)