Application for Amend to License DPR-3,changing Tech Spec 2.2.1 & Tables 2.2.1,3.3.2 & 3.3-3 to Increase Required Setpoint for Main Steam Line Isolation Trip from 200 Psig to 262.5 Psig.Fee Paid
ML20133C314
Person / Time
Site: Yankee Rowe
Issue date: 09/30/1985
From: Heider L
YANKEE ATOMIC ELECTRIC CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20133C318 List:
References
FYR-85-102, NUDOCS 8510070309
Download: ML20133C314 (3)


Text

!

$ANKEE ATOMIC ELECTRIC COMPANY Te'epho"e (6 ") *' -oo TWX 710-380-7619 j

' ~

1671 Worcester Road, Framingham, Massachusetts 01701 2.C.15.1

jjy

[

h,}

FYR 85-102

_._. f PC #193 September 30, 1985 United States Nuclear Regulatory Commission Washington, DC 20555 Attention:

Office of Nuclear Reactor Regulation

Reference:

(a) License No. DPR-3 (Docket No. 50-29)

Subject:

Request for changes to Technical Specifications 2.2.1 and 3.3.2

Dear Sir:

Pursuant to Section 50.59 of the Commission's Rules and Regulations, the Yankee Atomic Electric Company hereby requests the authorization to make the following changes.

PROPOSED CHANGE Reference is made to the Technical Specifications of License DPR 3.

The specific changes are shown in Attachment A.

A summary of the proposed changes is given below:

.1.

We propose to modify Technical Specification 2.2.1, Table 2.2-1 to include an increase in the required setpoint for the main steam line isolation trip from 200 psig to 262.5 psig.

2.

We propose to modify Technical Specification 3.3.2, Table 3.3-3 to include an increase in the required setpoint for the main steam line isolation trip from 200 psig to 262.5 psig, in order to remain consistent with 1, above.

3.

We propose to modify the Technical Specification bases for the main steam line isolation trip to include the basis for the increased trip setpoint as proposed in 1 and 2, above.

REASON FOR CHANGE The increase in the main steam line isolation trip setpoint is necessary to ensure that the acceptance criteria for the Safe Shutdown System are met for a seismic event.

C

$Mlooc1"oS*$8 3

P

@cc) jcVekL6D

.49o752-t

United States Nuclear Regulatory Commission September 30, 1985 Attention: Office of Nuclear Reactor Regulation Page 2 BASIS FOR CHANGE The proposed new main steam line isolation trip setpoint was based on plant response analyses performed with the RETRAN-02 computer code.

The analyses showed that a 250 psig trip setpoint provided sufficient time for the operators to activate the Safe Shutdown System prior to the dry out of the steam generators following the assumed seismically induced failure of the main steam lines.

Including an appropriate allowance for instrument error above the 250 psig main steam line isolation trip setpoint assumed in the analyses, the Technical Specification limit should be increased to 262.5 psig.

SAFETY CONSIDERATIONS The signific ant hazards consideration is based on the guidance provided by example in 48C?R14870. The changes described herein are classified according to the f311owing example of action involving no significant hazards:

"A change that constitutes at additional limitation, restriction, or control not presently incItoed in the Technical Specifications:

for example, a more stringent suctsillance regiirement."

This change does not result in any ine ease ts the probability or conseguences of a previously analyzed accidet.T., or 19 duce in any way a safety margin. The more stringent requirement on the main s'eam line isolation trip will enhance somewhat the plant response to a ca.n steem line break transient.

In addition, the new setpoint will ens.re tha availability of a secondary system heat sink following a seismic event, unt.1 the Safe Shutdown System is available to provide feedwater to the steam c9 net? tors.

Based on the consideration contained herein, it is co cluded that there is reasonable assurance that operation of the Yankee plant v.'nst/ tent with the proposed Technical Specifications will not endanger the health ano safety of the public. This proposed change has been reviewed by the Nucic.c s'fety Audit and Review Committee.

FEE An application fee of $150.00 is enclosed in accordance with 10CFR170.i?.

o I

l

I United States Nuclear Regulatory Commission September 30, 1985 Attention: Office of Nuclear Reactor Regulation Page 3 SCHEDULE OF CHANGE These changes to the Yankee Technical Specifications will be implemented upon Commission approval. We request approval of this submittal prior to the Core 18 startup, currently scheduled for November 1985.

Very truly yours, YANK E ATOMIC ELECTRIC COMPANY L. H. Heider Vice "reaf danF /Maa.:ger of Operations LHH/dps Attachment COMMONWEALTH OF MASSACHUSETTS)

)ss MIDDLESEX COUNTY

)

Then personally appeared before me, L. H. Heider, who, being duly sworn, did state that he is a Vice President of Yankee Atomic Electric' Company, that he is duly authorized to execute and file the foregoing document in the name and on the behalf of Yankee Atomic Electric Company and that the statements therein are true to the best of his knowledge and belief.