Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20129E612 + (ML20129E612)
- ML20129E613 + (ML20129E613)
- 05000528/LER-1985-030, :on 850425,both ECCS Trains Declared Inoperable Due to Indeterminate Operability of Containment Recirculation Sump Isolation Check Valves.Caused by Failure to Retest Valves Following Disassembly + (ML20129E614)
- ML20129E615 + (ML20129E615)
- ML20129E616 + (ML20129E616)
- ML20129E617 + (ML20129E617)
- ML20129E619 + (ML20129E619)
- 05000361/LER-1996-006, :on 960826,NRC Inspector Observed Local Voltage Meter for Vital Bus Inverter Y003 Indicating 122.5 Volt Ac. Caused by Util Not Providing Quantitative Operability Info. Occurrence Will Be Reviewed + (ML20129E621)
- ML20129E622 + (ML20129E622)
- ML20129E623 + (ML20129E623)
- ML20129E624 + (ML20129E624)
- ML20129E625 + (ML20129E625)
- BECO-LTR-96-084, Requests Extension to 961218 to Respond to GL 96-04, Boraflex Degradation in Spent Fuel Pool Storage Racks + (ML20129E626)
- ML20129E627 + (ML20129E627)
- ML20129E629 + (ML20129E629)
- IA-96-286, Responds to Appeal of Denial of Documents Re Financial Assurance for General Atomics Facilities.Forwards SRM SECY-96-124 + (ML20129E629)
- ML20129E632 + (ML20129E632)
- ML20129E633 + (ML20129E633)
- 05000250/LER-1985-012, :on 850429,during shutdown,generator-main Transformer Lockout Relay Tripped,Resulting in Actuation of ESF Equipment.Caused by Personnel Error.Personnel Counseled. Transformer turn-ratio Tested + (ML20129E634)
- ML20129E635 + (ML20129E635)
- ML20129E636 + (ML20129E636)
- ML20129E638 + (ML20129E638)
- ML20129E639 + (ML20129E639)
- ML20129E641 + (ML20129E641)
- ML20129E642 + (ML20129E642)
- AECM-85-0212, Forwards Preliminary Data in Support of NRC Review of Safety Relief Valve in-plant Test Plan,Per 850626 Telcon.Addl Tests Unnecessary + (ML20129E644)
- ML20129E645 + (ML20129E645)
- ML20129E646 + (ML20129E646)
- ML20129E647 + (ML20129E647)
- ML20129E648 + (ML20129E648)
- ML20129E649 + (ML20129E649)
- ML20129E650 + (ML20129E650)
- ML20129E652 + (ML20129E652)
- ML20129E655 + (ML20129E655)
- ML20129E656 + (ML20129E656)
- ML20129E657 + (ML20129E657)
- NSD-NRC-96-4829, Forwards Rev 8 to GWGL022, AP600 Probabilistic Risk Assessment. Encl 2 in Form of Replacement Pages & Chapters to Be Added to Existing PRA Rept + (ML20129E658)
- ML20129E660 + (ML20129E660)
- ML20129E661 + (ML20129E661)
- ML20129E662 + (ML20129E662)
- ML20129E663 + (ML20129E663)
- ML20129E664 + (ML20129E664)
- ML20129E665 + (ML20129E665)
- ML20129E666 + (ML20129E666)
- B15944, Monthly Operating Repts for Sept 1996 for Millstone Nuclear Power Station Units 1,2 & 3 + (ML20129E667)
- ML20129E668 + (ML20129E668)
- ML20129E669 + (ML20129E669)
- ML20129E672 + (ML20129E672)
- NSD-NRC-96-4851, Submits non-proprietary & Proprietary Drafts of Section 3.0 of AP600 Notrump Verification & Validation Rept + (ML20129E675)
- RBG-21445, Forwards Revs to FSAR Section 1.8,including Discussion of Effect of Revs on Ser.No Impact on Tech Specs Expected.Revs Will Be Included in Future FSAR Amend + (ML20129E678)
- ML20129E679 + (ML20129E679)