ML20129E666

From kanterella
Jump to navigation Jump to search
Forwards LER 85-020-00 & LER 85-021-00
Date released: 05/22/2020 Download: ML20129E666


:on 850429,reactor Vessel Flow Requirement Not Verified Prior to RCS Boron Dilution.Procedure for Filling Reactor Refueling Cavity Revised to Include Verification/ Documentation of Reactor Vessel Flow During RCS Dilution
ML20129E692
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/24/1985
From: Baker K
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
References
Download: ML20129E692 (1)
:on 850429,low Pressure CO2 Fire Suppression Sys for Quadrant 1 of Reactor Cable Tunnel Isolated W/O Fire Watch Coverage.Caused by Personnel Error.Personnel Counseled
ML20129E683
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/24/1985
From: Blind A
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
References
Download: ML20129E683 (3)
Forwards LER 85-020-00 & LER 85-021-00
ML20129E659
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/24/1985
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
Download: ML20129E659 (1)