Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20128B646 + (ML20128B646)
- ML20128B647 + (ML20128B647)
- ML20128B648 + (ML20128B648)
- ML20128B649 + (ML20128B649)
- ML20128B650 + (ML20128B650)
- 05000361/LER-1985-033, :on 850527,control Room Isolation Sys Train B Spuriously Actuated by Apparent Noise Spike on Control Room Radiation Monitor 2/3 RI-7825.Possibly Caused by Electrical Noise Spike.Detailed Study in Progress + (ML20128B651)
- RBG-21-400, Forwards Revs to Fsar,Responding to Fire Protection Concern Identified During Recent Review of Proposed Tech Specs.Revs Will Be Included in Future FSAR Amend + (ML20128B655)
- ML20128B656 + (ML20128B656)
- ML20128B657 + (ML20128B657)
- 05000454/LER-1992-002-01, :on 920403,discovered Loss of One of Two ESF Unit Crossties.Caused by Personnel Error.Procedure for cross-tie Breakers Revised + (ML20128B660)
- ML20128B661 + (ML20128B661)
- RBG-21-291, Forwards Rev to FSAR on Leakage Control Sys.Design Change Implemented to Replace Leakage Rate Converter W/Programmable Controller to Provide Addl Operational Flexibility.Rev Will Be Included in Future FSAR Amend + (ML20128B662)
- ML20128B663 + (ML20128B663)
- ML20128B664 + (ML20128B664)
- ML20128B665 + (ML20128B665)
- ML20128B668 + (ML20128B668)
- PM-91-038, Rev 0 to PM 91-038, Steam Leak Detection Sys Upgrade for Hpci,Rcic,Rwcu & Rhr + (ML20128B669)
- LD-92-116, Forwards Draft Matl Intended to Provide Specific Examples of Tier 1 Matl & Related Info as Basis to Discuss ITAAC at 921209 Meeting W/Nrc.Info Includes,Groundrules Used to Prepare Design Description & ITAAC & Status of Dser Items + (ML20128B670)
- ML20128B671 + (ML20128B671)
- ML20128B674 + (ML20128B674)
- ML20128B675 + (ML20128B675)
- PLA-3882, Forwards Change FF to Physical Security Plan.Encl Withheld (Ref 10CFR73.21) + (ML20128B678)
- ML20128B680 + (ML20128B680)
- ML20128B681 + (ML20128B681)
- ML20128B682 + (ML20128B682)
- ML20128B683 + (ML20128B683)
- ML20128B684 + (ML20128B684)
- ML20128B686 + (ML20128B686)
- ML20128B687 + (ML20128B687)
- IR 05000282/1992021 + (ML20128B688)
- ML20128B689 + (ML20128B689)
- ML20128B690 + (ML20128B690)
- PLA-3883, Forwards Change G to Security Training & Qualification Plan. Encl Withheld (Ref 10CFR73.21) + (ML20128B694)
- BVY-93-008, Informs That Rev 7 to NUREG-1021 Have Been Reviewed & Will Be Used to Conduct SRO Exams to Be Administered in Feb + (ML20128B695)
- ML20128B696 + (ML20128B696)
- ML20128B697 + (ML20128B697)
- IR 05000255/1992023 + (ML20128B698)
- ML20128B699 + (ML20128B699)
- ML20128B700 + (ML20128B700)
- ML20128B703 + (ML20128B703)
- ML20128B704 + (ML20128B704)
- ML20128B705 + (ML20128B705)
- IR 05000155/1992024 + (ML20128B706)
- ML20128B707 + (ML20128B707)
- NRC-84-2486, Part 21 & Final Deficiency Rept CQL-8255,NCR 84-2486,Item 190 Re Deformed Solder Lugs in 7.5 Kva Inverter Capacitor Terminations Supplied by Westinghouse.Initially Reported on 841024.Revised Pull Test Criterion Implemented + (ML20128B708)
- ML20128B709 + (ML20128B709)
- ML20128B711 + (ML20128B711)
- ML20128B712 + (ML20128B712)
- ML20128B715 + (ML20128B715)
- ML20128B716 + (ML20128B716)
- ML20128B718 + (ML20128B718)