Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20118B622 + (ML20118B622)
- ML20118B627 + (ML20118B627)
- ML20118B641 + (ML20118B641)
- ML20118B643 + (ML20118B643)
- JPN-92-058, Forwards Application for Amend to License DPR-59,removing SR for Monitoring Iodine in Drywell Atmosphere from Continuous Atmosphere Monitoring Sys,Per Reg Guide 1.45 & NUREG-0123 Re STS for BWRs + (ML20118B647)
- ML20118B649 + (ML20118B649)
- ML20118B650 + (ML20118B650)
- ML20118B656 + (ML20118B656)
- ML20118B666 + (ML20118B666)
- ML20118B679 + (ML20118B679)
- ML20118B681 + (ML20118B681)
- ML20118B700 + (ML20118B700)
- ML20118B702 + (ML20118B702)
- 05000364/LER-1992-007, :on 920525,Unit 2 Reactor Manually Tripped Following Loss of SGFP 2A.Caused by Water in Lube Oil Sys & Slippage of Oil Pump Impeller Inside Pump.Sgfp 2A Bearing Oil Seals Replaced to Reduce Shaft Leakage + (ML20118B713)
- 05000443/LER-1992-014, :on 920901,missed TS Surveillance on Seismic Monitoring Instrumentation Missed.Caused by Inadequate Communication.Operating Mgr Will Review Event W/Each Operating Crew & W/Work Control Supervisor + (ML20118B720)
- ML20118B735 + (ML20118B735)
- ML20118B747 + (ML20118B747)
- ML20118B749 + (ML20118B749)
- ML20118B750 + (ML20118B750)
- 05000440/LER-1992-016-05, :on 920906,identified That Fhb HVAC Supply Fan B Tripped Due to Instrumentation Drift of Differential Pressure Switch.Caused by Equipment Failure.Fhb Exhaust Switches Will Be Shortened from 24 to 3 Months + (ML20118B769)
- 05000423/LER-1992-021-01, :on 920831,discovered That Testing for Loop Stop Valve Not Adequate.Caused by Incomplete Review When Preparing Containment Electrical Penetration Protection Drawing.Backup Breakers for Valves Verified + (ML20118B789)
- 05000333/LER-1992-042, :on 920901,discovered That Fire Watch Posts Not Being Maintained Due to Personnel Error.Posts re-established W/Other Qualified Fire Watch Personnel & Reinforcement of Relevant Requirements Will Be Reviewed + (ML20118B805)
- ML20118B829 + (ML20118B829)
- NRC-92-0116, Responds to Suppl 1 to NRC Bulletin 92-001, Failure of Thermo-Lag 330 Fire Barrier Sys to Perform Specified Fire Endurance Function. Eleven Areas in Plant Identified W/Subj Matl.Roving Hourly Fire Watch Patrol Established + (ML20118B830)
- ML20118B831 + (ML20118B831)
- ML20118B832 + (ML20118B832)
- ML20118B834 + (ML20118B834)
- ML20118B836 + (ML20118B836)
- ML20118B837 + (ML20118B837)
- ML20118B843 + (ML20118B843)
- 05000325/LER-1990-013, :on 900725,determined That Cad/Containment Atmosphere Dilution Subsystem Design Did Not Meet FSAR Re Redundancy of Power Supply for Vaporizer Trains.Caused by Changing Regulatory Commitments.Sys Reviewed + (ML20118B848)
- TXX-9245, Submits Inservice Insp Special Rept on full-length Exams of 4,153 SG Tubes Performed During First Refueling Outage.No Tubes Exceeding 40% through-wall Plugging Limit Noted.Three Tubes Recovered.No Tubes Plugged + (ML20118B851)
- ML20118B858 + (ML20118B858)
- ML20118B859 + (ML20118B859)
- 05000328/LER-1992-012-01, :on 920904,fire Reported at B-phase Main Transformer Neutral Bushing to Main Cr,Resulting in Closing of Isolation Valves as Result of Hi Hi Heater Levels.Caused by Sys Perturbation.Plant Power Reduced + (ML20118B861)
- NRC-92-0102, Comment Supporting Review of Reactor Licensee Reporting Requirements.Endorses NUMARC Comments + (ML20118B881)
- 05000302/LER-1992-019, :on 920902,both Chemical Addition Sys Boric Acid Pumps Declared Inoperable Due to Undersized Thermal Overload Elements.Thermal Overload Elements Replaced W/ Elements Sized to Prevent Tripping + (ML20118B884)
- 05000263/LER-1992-008, :on 920624,1-inch Conduit Fire Barrier Declared Inoperable & on 920831,4-inch Conduit Fire Barrier Declared Inoperable Based on Review of NRC Bulletin 92-001 & Suppl 1. Continuous Fire Watch Established + (ML20118B900)
- 2CAN099209, Forwards Rev to 901009 Application for Amend to License NPF-6,changing TS Re Emergency Power Sys - DG to Incorporate GL 84-15,per Util 920512 Response to NRC Request for Addl Info + (ML20118B902)
- ML20118B904 + (ML20118B904)
- HL-2922, Comment on Proposed Rule Misc (92-3) Re Alternative Means of Dispute Resolution.Util Agrees W/Numarc Comments Entirely + (ML20118B911)
- 05000413/LER-1992-011-01, :on 920830,unexpected ESF Actuation Occurred, Resulting in Auxiliary Feedwater Sys Autostart When DG Load Sequencer 1B Reset.Caused by Use of Defective Procedure. Train B Reset & SG Blowdown Realigned + (ML20118B912)
- TXX-9247, Final Deficiency Rept CP-86-41 Re Effect of Small Break LOCA During Mode 4 Operation.Initially Reported on 860528. Westinghouse Owners Group Program Modified to Eliminate Use of leak-before-break Methodology + (ML20118B915)
- ML20118B916 + (ML20118B916)
- ML20118B918 + (ML20118B918)
- ML20118B919 + (ML20118B919)
- ML20118B926 + (ML20118B926)
- ML20118B930 + (ML20118B930)
- ML20118B933 + (ML20118B933)
- ML20118B935 + (ML20118B935)
- ML20118B939 + (ML20118B939)