ML20118B750
| ML20118B750 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom, Limerick |
| Issue date: | 09/25/1992 |
| From: | Beck G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GL-92-04, GL-92-4, NUDOCS 9210070126 | |
| Download: ML20118B750 (8) | |
Text
.--
l 10 CFR 50.54(f)
GL 92-04 PIIILADELPIIIA ELECTRIC COMPANY NUCLEAR GROUP HEADQUARTERS 955-65 CHESTERBROOK BLVD.
WA','NE, PA 19087 5691 (215) MO-6000 September 25, 1992 NUCLEAR SERVICES DEPARTMENT Docket Nos. 50-277 50-278 50-352 50-353 License Nos. DPR-44 DPR-56 NPF-39 NPF-85 U.S.
Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555
SUBJECT:
Peach Bottom Atomic Power Station, Units 2 and 3 Limerick Generating Station, Units 1 and 2 Response to Generia Letter 92-04, " Resolution of the Issues Related to Reactor Vessel Water Level Instrumentation in BWRs Pursuant to 10 CFR 50.54(f)"
Dear Sir:
~
Attached are our responctes to the " Requested Actions" of the subject Generic Letter 92-04, dated August 19, 1992.
Generic Letter 92-04 requests information regarding the adequacy and corrective actions for Bolling Water Reactor (BWR) water level instrumentation with respect to the effects of noncondensible gases on system operation.
The attached responses are consistent with the guidance provided by the Boiling Water Reactor Owner's Group (BWROG) and the numerous correspondence between the BWROG and the Nuclear Regulatory Commission (NRC).
Philadelphia Electric Company is an active participant in the BWROG and will be closely monitoring and participating in the activities associated with this issue.
\\
T){ j 9210070126 920925 p.
1 PDR ADCCK 05000277 4
g]
P PDR
Document. Control Desk Septembsr 25, 1992 Pago 2 If you have any questions, please contact us.
Very truly yours, hg G.
. Beck, Manager Licensing Section Nuclear Services Department Attachment o:\\11c\\9204cov T. T. Martin, Administrator, Region I, USNRC J. J. Lyash, USNRC Senior Resident Inspector, PBAPS T. J. Kenny, USNRC Senior Resident Inspector, LGS i
t l
l l
i f
l I
I
COMMO!NEALTH OF PENNSYLVANIA ss.
COUNTY OF CHESTER G.
R.
Rainey, being first duly sworn, deposes and says:
That he la Vice President of Philadelphia Electric Company, that he has read-the response to Ger.oric Letter No. 92-04, and knows the contents thereof; and that the Ptatements and matters Set forth therein are true and correct to the best of his knowledge, information and belief.
/_u V
eP sid t
Subscribed and sworn to before me thisc day of jh?fd w dL 6 1992.
A n
/
,, h ch? dVl,\\ Vh,? -
~
%)
/
/
L Notary Public Notag Seej T% erin k dhos co$v -
My Commsso1EcosMy 10. M5
PBAPS Unito 2 and 3, LGS Units 1 and 2 Attachm nt R3eponse to Gsnaric Lottor 92-04 Pags-1 Philadelphia Electric Company Peach Bottom Atomic Powwr Station, Units 2 and 3 Limerick Generating Station, Units 1 and 2 Response to Generic Letter 92-04 The following information represents the Philadelphia Electric Company (PEco) response to the specific " Requested Actions" in Generic Letter 92-04 for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 and Limerick Generating Stativn (LGS), Units 1 and 2.
Requested Action 1 "1.
In light of potential errors resulting from the effects of noncondensible gas, each licensee should determines The impact of potential level indication errors on automatic a.
safety system response during +.11 licensing basis trant ents and accidents; b.
The impact of potential level indication errors on operator's short and long term actions during and after all licensing basis accidents and transients; c.
The impact of potential level indication errors on operator actions prescribed in emergency operating procedures or other affected procedures not covered in (b)."
Responses la.
The Boiling Water Reactor Owners' Group (BWROG) pro.ided to the NRC and each of the member utilities a report entitled "BWR Reactor Vessel Water Level Instrumentation", Revision 1, August, 1992 (Reference 1).
This report addresses the safety impact of potential water level indication errors on automatic system response during all licensing basis transients and accidents.
The report concluded thac for those design basis accidents and transients that require automatic Emergency Core Cooling System (ECCS) initiation on low reactor water level, automatic safety system initiation is assured even with consideration of the postulated effects of the generic concern.
In addition, the diverse parameter of "High Drywell Pressure" is unaffected and available for those design basis accidents for which this parameter is analyzed to initiate ECCS systems. The analytical basis for the report's conclusions is contained in Section 6.0 (" Safety Analysis") of the report and is summarized in Section 2.2 (" Plant Responses to Postulated Accident Scenaries").
The conclusions docuraented in the BWROG report are applicable to the design of PBAPS, Units 2 and 3, and LGS, Units 1 and 2. This conclusion is based on our review of the report (Reference 1) and the evaluation made by General Electric Company as contained in 1
. _ _. ~
PBAPS Units 2 and 3,, LGS Units 1 and 2
. Attachment Response to Generic Letter 92-04 Page 2
, to the Reference 1 report.
PECo recognizes that there are diff9rences between the designs of the BWR plants and systems cited in the Reference 1 report, and PBAP3, Units 2 and il and LGS, Units'l and 2. As an example, low pressure injection safety systems are initiated by "High Drywell Pressure" and " Low Reactor Pressure" at PBAPS, Units 2 and 3 and LGS, Units 1 and 2.
However, our review of-the BWROG repert and General Electric Company's evaluation of generic applicability in Attachment 2 to this report reinforces PEco's understanding that the basic plant response to the design basis transients and accident events is sufficiently similar to obviate the need for additional plant unique detailed re-analysis.
In addition, based on PEco's understanding of the potential phenomena related to reactor water level instrumentation, plant specific piping geometries of the reactor water level instrumentation systems at PBAPS, Unita 2 and 3 and LGS, Units 1 and 2 will not invalidate the safety analysis provided in the BWROG report.
Based on PEco's review of the Reference 1 report and its evaluation of postulated effects of the generic issue, it is our conclusion that the appropriate automatic safety systems shall respond adequately to mitigate the consequences of a licensing basis accident or transient. Therefore, this generic issue does not present cn immediate safety concern.
Ib.
The Reference 1 report addreases in Section 6.9
(" Operator Responses"), the operator actions that could be anticipated in response to potential water level' indication errors.
Section 6 of the Reference 1 report states that the automatic safety systems will respond as required.
These short term / automatic responses are not anticipated to be interrupted by operator intervention.
At PBAPS, Unite 2 and 3, and LGS, Units 1 and 2, short and long term. actions during and after all licensing basis accidents and transients are directed by the pertinent "Off-Normal Procedure,"
" Operational Transient Procedure," or " Transient Response Implementation Plan (TRIP)" procedures (i.e., TRIP procedures are the plant specific emergency operating procedures) (ON/OT/T). ~The latest version of PEco's TRIP. procedures incorporate guidance provided in the NRC approved Emergency Procedure Guidelines (EPGs),
Rev. 4.
Guidance on the possible effects of noncondensible gases in the instrument' reference-legs has been provided to the appropriate plant operations personnel through shift training bulletins (at LGS, Units 1 and 2,
" Shift Training Documentation," SOL-92-070, issued August 26, 1992, and, at PBAPS, Units 2 and 3, " Required Reading Bulletin," RE-92-22B-LO/NLO, issued August 31, 1992).
This interim guidance information has sensitized the crerators to the possible concerns with inaccurate watar level readings following a
..m
~.
PLAPS' Units 2-and 3, LGS Units l'and 2 Attochment
+
Response to Generic Letter 92-04
-Page 3 rapid depressurization while not. necessitating a change to the existing long term guidance provided in the ON/OT/T procedures.
Ic.
As stated in Section 6.9 of the Reference 1 report and the response to item lb. above, the operators have adequate information in the present ON/OT/T procedures as augmented by the recent shift training bulletins in crder to ensure that the potential level errors will not result in improper ope * *or actions.
The Emergency Procedures Committee of a BWROG is continuing to review the potential need for any acuational guidance to the EPGs to further address the potential water level indication errors. The review of the EPGs and consideration
,f enhancements to the existing station ON/OT/T procedures will take into account the information from the BWROG long term program discussed in the Reference 2 letter, and the analysis and testing regarding the causes and effects of noncondensible gases in the reactor water-level instrumentation cystem's reference legs.
Requested Actian 2 "2.
Based upon the results of (1), above, each licensee should notify the NRC of short term actions taken, such as a.
Periodic monitoring of level instrumentation system leakage;
- and, b.
Implementation of procedures and operator training'to assure that potential level errors will not result in improper operator actions."
Response
2a.
Station procedures currently include requirements to perform " leak
- inspections" on accessible process lines of the reactor water level instrumentation system after each refueling outage, prior.to plant startup.
In addition, instrument surveillances and maintenance practices require inspection of the asec ciated instrumenc.
components for leakage, prior to return to service, following any disturbance of the process boundary.
The. appropriate personnel at PBAPS, Units 2 and 3, and LGS, Units 1 and 2, have been sensitized to the possible contribution of system leakage to the postulated =
migration of noncondensible gases into the referenct, legs in order to assure that this concern is weighed in decisions associated with system maintenance activities.
Based on the Reference 1 report and available information on this
-generic concern, no additional periodic surveillance procedures for inspection for system seepage from the refsrence legs of the reactor water level instrumentation system is planned at this time.
i PBAPS Unitre 2 cnd 3, LGS Unito 1 cnd 2 Attachment R cponto to G2noric Lotter 92-04 Pega 4 The BWROG long term program (Reference 2) has been established to determine the actual mechanzam and effects of noncondensible gas migration into the reference legs. Appropriate actions shall be taken based upon the BWROG's conclusions.
The configuration of the reactor water level instrumentation systems at PBAPS, Unite 2 and 3 and LGS, Units 1 and 2 have been reviewed and provided to the BWROG to be factored into the test configurations in the BWROG program.
2b.
Currently, our understanding of the postulated effects of noncondensible gases in the reference legs of the reactor water level instrumentation has been based on cons <rvative analyses. The BWROG program (Reference 2) will evaluate the possible effects of the generic concern and identify any pertinent causal factors.
Following completion of the BWROG program, the need and identification of any corrective actions will be better defined.
Based on the available information, no changes to the ON/OT/T procedures are currently being implemented in reeponse to the subject generic concern.
In the interim, PECo has informed its operators of available information and guidance through shift training bulletins.
An industry chronology and technical discussion, based on information presented to the NRC by the BWROC has been supplied to the appropriate training personnel and will
-e addressed as an emergent issue at both stations for the operator training programs.
It should be noted that PECo does have post-accident TRIP Pre *-dures, T-255 (LGS) and T-260 (PBAPS), for backfilling reactor water level instrument system reference legs at both stations.
These post-accident procedures are available for implementation to restore accurate water level indication.
Requested Action 3 "3.
Each liceneee should provide its plans and schedule for corrective actions, including any proposed hardware modifications necessary to ensure the level instrumentetirn syttem doeinn is c? high functional reliability for long term operation. bince this instrumsntation playa an important role in plant safety and is required for both normal and accident conditions, the start recommends that each utility implement its longer term actions to assure a level instrumentation system of high functional reliability at the first opportunity but prior to starting up after the next refueling outage commencing 3 months after the date of this letter."
I 1
PBAPS Units 2 and 3, LGS Units 1 and 2 Attachm:nt Response to Generic Letter 92-04 Page 5 I
Response
3.
PEco endorses the BWROG plans originally provided in the Reference 2 BWROG letter to the NRC.
We reaffirm our support of the BWROG plan by endorsing the BWROG letter of September 24, 1992 (Reference 3). Therefore, PECo has not scheduled any hardware modifications in response to this generic issue.
Currently, our understanding of the postulated effects of noncondensible gases in the reference lege of the reactor water level instrumentation has been based on analyses assuming conservative conditions. As the BWROG's investigation has progressed, more information has become available to suggest that the actual effects of noncondensible gas saturatien into the reactor water level instrumentation reference legs will be greatly reduced below the bounding errors presented in the BWROG report (Reference 1).
The BWROG program (Reference 2) has been designed to evaluate the actual dynamic effects of the generic concern through the use of testing and analysis. The goal of this program is to identify any pertinent causal factors and the requirements for procedural or hardware modifications for PBAPS, Units 2 and 3 and LGS, Units 1 and 2.
If the BWROG program indicates that either procedural or herdware modifications are necessary to assure that the level instrumentation is of high functional reliability, a review of the proposed changes will be conducted and a schedule will be provided to the NRC at that time.
PECo is an active participant in the BWROG activities regarding this issue and will monitor the progress of the BWROG on this issue and continue to review possible hardware modifications.
Referencest 1)
BWROG Report No. GENE-770-15-0692 titled "BWR Reactor vessel Water Level Instrumentation" transmitted in BWROG Letter No. BWROG-92074 from G.
J.
Beck (BWROG/RRG) to W.
T.
Russell (NRC), dated August 28, 1992.
2)
BWROG Letter No. BWROG-92072 from G.
J. Beck (BWROG/RRG) to W.
T.
Ruceell (NRC), dated August 12, 1992.
3)
BWROG Letter No. BWROG-92082 from G.
J. Beck (WJROG/RRG) to USNRC, dated September 24, 1992, o:\\lic\\gl9204 1
_