Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000336/LER-1996-021-01, :on 960227,snubber Failure in Pressurizer Spray Line Occurred.Caused by Corrosion.Replaced Snubber Serial 12883 W/Identical Model PSA-1 Snubber + (ML20117G607)
- ML20117G613 + (ML20117G613)
- ML20117G618 + (ML20117G618)
- ML20117G624 + (ML20117G624)
- ML20117G626 + (ML20117G626)
- ML20117G628 + (ML20117G628)
- 1CAN089604, Requests Withdrawal of Request Relief from ASME Code Re Prolongs Hold Times for Class 1 Hydrostatic Examinations for ANO-1 + (ML20117G640)
- 3F0896-18, Application for Amend to License DPR-72,by Submitting TS Change Request 208 Wich Proposes to Establish New TS LCO Applicable to Control Complex Habitability Envelope Allowing Breaches to Exist + (ML20117G651)
- ML20117G653 + (ML20117G653)
- ML20117G661 + (ML20117G661)
- ML20117G666 + (ML20117G666)
- ML20117G669 + (ML20117G669)
- ML20117G676 + (ML20117G676)
- ML20117G678 + (ML20117G678)
- ST-HL-AE-5451, Responds to NRC Re Violations Noted in Insp Repts 50-498/96-04-01 & 50-498/96-04-04.Corrective Actions: OPOP03-ZG-0009 Was Revised to Include Action Step Requiring I&C to Place Narrow Range Hot Leg Level Instruments in Svc + (ML20117G686)
- ML20117G707 + (ML20117G707)
- ML20117G708 + (ML20117G708)
- ML20117G712 + (ML20117G712)
- ML20117G726 + (ML20117G726)
- ML20117G729 + (ML20117G729)
- RC-96-0223, Responds to Violations Noted in Insp Rept 50-395/96-02. Corrective Actions:Removed Scaffolding,Canceled Storage Area Request Number 476 & Reviewed Subject Violation W/Personnel + (ML20117G730)
- RBG-43161, Application for Amend to License NPF-47 Revising TS Re Engineered Safety Systems Which Address Core Reactivity & Power + (ML20117G737)
- ML20117G740 + (ML20117G740)
- 2CAN089609, Application for Amend to License NPF-6,revising Section 5.0, Design Features & Would for Most Part,Adopt NUREG-1432 Rev 1,improved, Std Tech Specs for C-E Plants, for Section of TS + (ML20117G750)
- ML20117G758 + (ML20117G758)
- ML20117G760 + (ML20117G760)
- ML20117G762 + (ML20117G762)
- L-85-174, Forwards Annual Nonradiological Environ Monitoring Rept for 1984 + (ML20117G763)
- ML20117G766 + (ML20117G766)
- LIC-96-0124, Responds to NRC Re Violations Noted in Insp Rept 50-285/96-05.Corrective Actions:Operations Met W/Shift Supervisors to Discuss Maintaining Big Picture & Ensuring Proper Command & Control + (ML20117G769)
- ML20117G771 + (ML20117G771)
- BSEP-96-0258, Semi-Annual Radioactive Effluent Release Rept 960101-0630 + (ML20117G774)
- ML20117G778 + (ML20117G778)
- ML20117G781 + (ML20117G781)
- ML20117G787 + (ML20117G787)
- 05000335/LER-1996-010, :on 960730,upper & Lower Detector Leads for Linear Range Ni Were Reversed on Channels A,C & D.Mod Package for Replacement of RPS Ni Drawers Contained Design Error.Drawers Have Been Reconnected & Retested + (ML20117G788)
- ML20117G789 + (ML20117G789)
- ML20117G790 + (ML20117G790)
- ML20117G800 + (ML20117G800)
- ML20117G805 + (ML20117G805)
- ML20117G810 + (ML20117G810)
- 05000271/LER-1996-011, :on 960416,check Valves Not Included in IST Program.Caused by Failure to Perform Comprehensive Sys/ Component Reviews During Past IST Program Scope Reviews. Reviewed IST Program & Prepared Basis Document + (ML20117G813)
- ML20117G818 + (ML20117G818)
- ML20117G822 + (ML20117G822)
- ML20117G832 + (ML20117G832)
- ML20117G846 + (ML20117G846)
- ML20117G856 + (ML20117G856)
- ML20117G861 + (ML20117G861)
- ML20117G868 + (ML20117G868)
- ML20117G881 + (ML20117G881)
- 05000341/LER-1996-007, :on 960419,RCIC Sys Declared Inoperable Due to Turbine Shaft Gland Leakage.Caused by Steam Leakage Past Seat of RCIC Turbine Steam Admission Valve + (ML20117G886)