- 05000237/LER-1984-024, :on 841207,secondary Containment Momentarily Broken.Cause Not Determined.Turbine Bldg Door Immediately Closed.No Problem W/Electrical Controls for Doors Discovered + (ML20115H342)
- NRC-96-0071, Forwards Response to NRC Re Violations Noted in Insp Rept 50-341/96-04.C/A:developed Hydraulic Computer Models of SW Sys + (ML20115H344)
- ML20115H350 + (ML20115H350)
- ML20115H357 + (ML20115H357)
- RC-96-0176, Responds to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over SR Equipment + (ML20115H389)
- ML20115H396 + (ML20115H396)
- ML20115H399 + (ML20115H399)
- ML20115H402 + (ML20115H402)
- W3P85-1217, Monthly Operating Rept for Mar 1985 + (ML20115H408)
- ML20115H410 + (ML20115H410)
- 3F0796-01, Monthly Operating Rept for June 1996 for Crystal River Unit 3 + (ML20115H417)
- ST-HL-AE-5428, Requests Approval of Attached Request for Incorporation of Portion of ASME O&M Code Governing Valve Seat Leakage Testing of Containment Isolation Valves Into STP Inservice Test Program + (ML20115H423)
- RBG-43093, Monthly Operating Rept for June 1996 for River Bend Station Unit 1 + (ML20115H437)
- TXX-9640, Monthly Operating Rept for June 1996 for Comanche Peak Electric Station + (ML20115H447)
- NRC-96-0070, Monthly Operating Rept for June 1996 for Fermi 2 + (ML20115H460)
- 05000263/LER-1992-011-01, :on 920922,determined That Existing Elevator Could Have Damaged Safe Shutdown Equipment During Design Bases Seismic Event.Caused by Inadequate Original Design.New Elevator Will Be Installed + (ML20115H464)
- ML20115H471 + (ML20115H471)
- ST-HL-AE-5422, Discusses Review of Operations QA Plan Change QA-027 + (ML20115H472)
- ML20115H482 + (ML20115H482)
- ML20115H487 + (ML20115H487)
- ST-HL-AE-5418, Forwards from Westinghouse Responding to NRC Concerns of RHR Removal Lines.Resolution to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to RCS Provided + (ML20115H495)
- 05000254/LER-1992-023-01, :on 920920,determined That Heat Transfer Capability of 1B & 2B HX Did Not Meet Design Requirements. Caused by Fouling & Silt Accumulation on Rhrsw.Routine Two Pump Flushing Will Be Performed + (ML20115H496)
- ML20115H498 + (ML20115H498)
- ML20115H502 + (ML20115H502)
- ML20115H511 + (ML20115H511)
- ML20115H514 + (ML20115H514)
- 0CAN109203, Forwards Rev 26 to ANO Units 1 & 2 ISP Per 10CFR50.54(p). Rev Withheld (Ref 10CFR73.21) + (ML20115H516)
- ML20115H522 + (ML20115H522)
- ML20115H528 + (ML20115H528)
- ML20115H534 + (ML20115H534)
- 05000354/LER-1996-019, :on 960614,LPCI Has Not Been Appropriately Tested as Specified in TS SR 4.5.1.c.1.Caused by Ineffective Reviews of Procedures That Implement TS Requirements. Procedures Implementing TS Sr,Will Be Reviewed + (ML20115H545)
- PY-CEI-NRR-2072, Monthly Operating Rept for June 1996 for Perry Nuclear Power Plant Unit 1 + (ML20115H547)
- ML20115H558 + (ML20115H558)
- ML20115H565 + (ML20115H565)
- 05000354/LER-1992-010-02, :on 920924,primary Containment Isolation Actuation Occurred Due to Procedural Deficiency.Incident Will Be Reviewed W/All Personnel Involved in Design Change Package Preparation & Review + (ML20115H592)
- ML20115H604 + (ML20115H604)
- ML20115H610 + (ML20115H610)
- ML20115H617 + (ML20115H617)
- ML20115H630 + (ML20115H630)
- ULNRC-03401, Provides Addl Info Supporting 960417 Amend Application & Mod to Replace Digital Portions of Ms & FW Isolation Sys W/Digital Processor Equipment,In Response to Discussions W/ NRC Project Manager for Plant + (ML20115H635)
- ML20115H636 + (ML20115H636)
- 05000263/LER-1996-007-01, :on 960615,reactor Scram Resulted from Electrical Short in Generator Condition Monitor.Corrected Wiring Error + (ML20115H640)
- NSD-NRC-96-4473, Forwards Three Copies of Westinghouse Response to NRC RAI on AP600 Design Certification Topics + (ML20115H649)
- ML20115H650 + (ML20115H650)
- ML20115H651 + (ML20115H651)
- ML20115H655 + (ML20115H655)
- 05000298/LER-1992-003, Provides Supplemental Info on Rev 0 to LER 92-003 Re Degradation in safety-related Battery Cells,Per NRC Info Notice 89-017.Existing Monitoring of Battery Cells Provides Ample Advanced Notification of Need to Replace Cells + (ML20115H658)
- ML20115H661 + (ML20115H661)
- ML20115H664 + (ML20115H664)
- U-602057, Special Rept:On 920921,generator Output Breaker Failed to Close on Four Attempts.Caused by Bent Protective Cover Over Auxiliary Switches & anti-pump Coil.Output Breaker Racked to Test Position & Sucessfully Cycled Three Times + (ML20115H686)