Provides Confirmation of Specific Commitments,Per 960702 Request Re Rev to Plant UFSAR to Reflect New SFP Rate of Evaporation.Amend 12 to UFSAR Will Be Provided by 961206
ML20115H482
Person / Time
Site: Sequoyah  
Issue date: 07/17/1996
From: Shell R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9607230149
Download: ML20115H482 (3)


Text

f

=

i e

l l

l IUA l

Tennessee Vahey Authonty Post Oft:ce Box 2000 Soddy Dasy Tennessee 37379 July 17,1996 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEOUOYAH NUCLEAR PLANT (SON) - SPENT FUEL POOL (SFP) SURVEY RESPONSE i

The purpose of this letter is to provide confirmation of specific commitments as requested in the NRC !etter to TVA dated July 2,1996. The NRC letter requested TVA to commit to the following: (1) provide a revision to the SON Updated Final Safety Analysis Report (UFSAR) to reflect the new SFP rate of evaporation, (2) provide a revisicn to the UFSAR for the recently completed SFP rerack project, and (3) revise the appropriate procedure that instructs the operators to stop the SFP cooling pumps.

TVA will provide to NRC Amendment 12 of the SON UFSAR by December 6,1996.

Amendment 12 willinclude Items 1 and 2 above. Item 3 is complete. System Operating Instruction 78.1, " Spent Fuel Pit Coolant System," has been revised to delete the caution to secure SFP cooling pumps at 180 degrees Fahrenheit.

Commitments contained in this letter are provided in the attached enclosure. Please direct questions concerning this issue to Bill Ludwig at (423) 843-7460.

Sincerely,

(

R. H. Shell l

Manager SON Site Licensing p3D Enclosure cc: See page 2 9607230149 960717 PDR ADOCK 05000327 I

K PDR l

i i

l.-

I ll * '

l y

I I

U.S. Nuclear Regulatory Commission f

l Page 2.-

[

July 17,1996

.l l

I 1

-[

l' cc (Enclosure):

l

- Mr. R. W. Hernan, Project Manager i

Nuclear Regulatory Commission

. One White Flint, North t

11555 Rockville Pike -

Rockville, Maryland 20852-2739 l

NRC Resident inspector Sequoyah Nuclear Plant i

2600 Igou Ferry Road Soddy Daisy, Tennessee 37379-3624 l

Regional Administrator U.S. Nuclear Regulatory Commission Region 11 i

101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 2711

-)

i

'1

)

l 1

i I.

I l

i

p

[-

l ENCLOSURE TVA will provide NRC Amendment 12 of the SON Updated Final Safety Analysis Report by December 6,1996, that will include the new spent fuel pool (SFP) rate of evaporation and will incorporate the recently completed SFP rerack project description, i