Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BSEP-92-0024, Forwards Request for Temporary Waiver of Compliance from TS 3.3.3, ECCS Actuation Instrumentation When in Operational Condition 4, to Permit One Channel from Each of Two Trip Sys to Be Inoperable Simultaneously for Up to 12 H + (ML20115A930)
- ML20115A933 + (ML20115A933)
- ML20115A935 + (ML20115A935)
- RBG-43059, Submits Response to NRC Request for Addl Info on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (ML20115A936)
- BECO-LTR-92-117, Monthly Operating Rept for Sept 1992 for Pilgrim Nuclear Power Station + (ML20115A939)
- ML20115A941 + (ML20115A941)
- ML20115A942 + (ML20115A942)
- ML20115A944 + (ML20115A944)
- ML20115A945 + (ML20115A945)
- ML20115A946 + (ML20115A946)
- ML20115A949 + (ML20115A949)
- ML20115A951 + (ML20115A951)
- ML20115A952 + (ML20115A952)
- ML20115A960 + (ML20115A960)
- ML20115A967 + (ML20115A967)
- 1CAN079601, Requests Relief from Requirements of ASME B&PV Code,Sections III & XI Due to Flaws in SW Piping,Iaw 10CFR50.55a & Guidance Provided in GL 90-05 & GL 91-18 + (ML20115A969)
- ML20115A971 + (ML20115A971)
- 1CAN079603, Requests Relief from Section IWA-5213 of ASME Section XI IST Requirements Because 10 Minute Hold Time Could Not Be Reasonably Obtained on Certain Sections of Train a EFW W/O Undue Hardship & Expense + (ML20115A976)
- ML20115A978 + (ML20115A978)
- ML20115A986 + (ML20115A986)
- ML20115A988 + (ML20115A988)
- ML20115A996 + (ML20115A996)
- ML20115B000 + (ML20115B000)
- ML20115B001 + (ML20115B001)
- ML20115B002 + (ML20115B002)
- ML20115B005 + (ML20115B005)
- ML20115B007 + (ML20115B007)
- ST-HL-AE-4228, Responds to Violations Noted in Insp Repts 50-498/92-24 & 50-499/92-24.Corrective Actions:Design Change to Install Isolation/Equalization Valves to Facilitate Calibr & Restoration of Chiller Switches Will Be Completed by 921231 + (ML20115B008)
- ML20115B009 + (ML20115B009)
- ML20115B010 + (ML20115B010)
- ST-HL-AE-5408, Forwards Results for Hot,Full Flow Rod Drop Testing in Unit 1 for Cycle 6,performed on 960518 & Hot Full Flow Rod Drop Testing of New Cycle 7 Core,Performed on 960608,per NRC Bulletin 96-001 + (ML20115B016)
- ML20115B017 + (ML20115B017)
- ML20115B018 + (ML20115B018)
- ML20115B024 + (ML20115B024)
- ML20115B025 + (ML20115B025)
- ML20115B031 + (ML20115B031)
- ML20115B032 + (ML20115B032)
- L-92-286, Monthly Operating Repts for Sept 1992 for St Lucie Units 1 & 2 + (ML20115B037)
- ML20115B039 + (ML20115B039)
- ML20115B042 + (ML20115B042)
- ML20115B057 + (ML20115B057)
- U-602596, Provides Addl Info for Amend to Incorporate Proposed Change to CPS Ts, ,be Reviewed on Schedule Sufficient to Support Sixth Refueling Outage Currently Scheduled to Begin 961013 + (ML20115B069)
- ML20115B073 + (ML20115B073)
- ML20115B088 + (ML20115B088)
- ML20115B094 + (ML20115B094)
- ML20115B096 + (ML20115B096)
- ML20115B098 + (ML20115B098)
- ML20115B102 + (ML20115B102)
- ML20115B105 + (ML20115B105)
- ML20115B106 + (ML20115B106)
- ML20115B110 + (ML20115B110)