Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20100L925 + (ML20100L925)
- ML20100L927 + (ML20100L927)
- ML20100L931 + (ML20100L931)
- ML20100L937 + (ML20100L937)
- PLA-2361, Forwards Description of Events & Actions for Resolution of Scram Pilot Solenoid Valve Concerns,Results of Evaluation of Scram Pilot Valves by Franklin Research Ctr & Description of Surveillance Program for Valves,In Response to + (ML20100L938)
- ML20100L939 + (ML20100L939)
- RBG-19601, Forwards 412 Oversize Drawings Providing Final Closeout of Confirmatory Items 21,29,32,36,37 & 38 & Partial Close Out of Items 24 & 43,per Instrumentation & Control Sys Branch Request.Aperture Cards Available in PDR + (ML20100L943)
- ML20100L956 + (ML20100L956)
- ST-HL-AE-1195, Revised Final Deficiency Rept Re Cable Tray Hanger Design. Initially Reported on 801205.All Affected Supports & Hangers Replaced W/New Design Using Cold Formed Strut.Bechtel Evaluation Confirms Supports Acceptable + (ML20100L959)
- ML20100L961 + (ML20100L961)
- ML20100L981 + (ML20100L981)
- ML20100L985 + (ML20100L985)
- ML20100L993 + (ML20100L993)
- ML20100M002 + (ML20100M002)
- ML20100M010 + (ML20100M010)
- ML20100M019 + (ML20100M019)
- ML20100M030 + (ML20100M030)
- 2CAN118405, Monthly Operating Rept for Oct 1984 + (ML20100M035)
- ML20100M045 + (ML20100M045)
- ML20100M047 + (ML20100M047)
- ML20100M054 + (ML20100M054)
- RBG-20506, Interim Deficiency Rept DR-286 Re Polarity Pins on Twinax Module Connectors in Containment Electrical Penetrations Supplied by Conax Corp.Interim or Final Status Rept Will Be Provided by 850411 + (ML20100M066)
- RBG-20558, Interim Deficiency Rept DR-281 Re Defective Bearing Support in Concrete Pads for Charcoal Filter Units Supplied by American Air Filter.Final or Interim Status Rept Will Be Provided by 850412 + (ML20100M073)
- ML20100M078 + (ML20100M078)
- RBG-20550, Final Deficiency Rept DR-217 Re Defective Bolting Matl Supplied by Cardinal Industrial Products Corp.Initially Reported on 850222.Item Not Reportable Under 10CFR50.55(e) + (ML20100M095)
- ST-HL-AE-1211, Fifth Interim Deficiency Rept Re Corrosion in Safety Injection Sys Weld.Initially Reported on 831020.Welds in Safety Injection & Containment Spray Piping Sys Will Be Cut Out & Replaced W/Pup Piece.Next Rept by 850830 + (ML20100M102)
- 05000324/LER-1985-003-03, :on 850310,unexpected Primary Containment Group 1 Isolation Occurred During Response Time Testing of Main Turbine Stop Valves.Periodic Test PT-45.1.6-2 & Corresponding Response Time Test Revised + (ML20100M108)
- TXX-4281, Forwards Table Providing Description of 840827 Amend 52 to FSAR + (ML20100M112)
- ST-HL-AE-1215, Final Part 21/deficiency Rept Re Capacitor Terminations in GE ferro-resonant Transformers in Westinghouse 7.5 Kva Inverters.Initially Reported on 840914.Fast-on Terminals Will Be Cut Off & Wire to Solder Lug Will Be Soldered + (ML20100M124)
- ML20100M126 + (ML20100M126)
- ML20100M127 + (ML20100M127)
- ML20100M131 + (ML20100M131)
- ML20100M136 + (ML20100M136)
- HL-5115, Ei Hatch Nuclear Plant - Units 1 & 2 Annual Operating Rept 1995 + (ML20100M159)
- ML20100M160 + (ML20100M160)
- 2CAN029608, Forwards 1995 Annual Rept of SG Tubing Isis,Presenting Results from ANO-2 Second mid-cycle (2P95) Conducted Jan 1995 & Eleventh Refueling Outage (2R11) Conducted Sept 1995 + (ML20100M177)
- ML20100M198 + (ML20100M198)
- ML20100M210 + (ML20100M210)
- ML20100M212 + (ML20100M212)
- ML20100M213 + (ML20100M213)
- ML20100M244 + (ML20100M244)
- W3P84-3381, Responds to Item 4.5.3 of Generic Ltr 83-28, Reactor Trip Sys Reliability. Sys Functional Testing Intervals Consistent W/Achieving High Availability.Final Results Will Be Submitted by 850131 + (ML20100M260)
- 05000327/LER-1985-012, :on 850312,hourly Fire Watch Not Performed within 1 H,Per Tech Spec 3.7.12.Caused by Inoperable Door. Door Repaired & Fire Watch Reestablished + (ML20100M282)
- ML20100M285 + (ML20100M285)
- ML20100M287 + (ML20100M287)
- ML20100M295 + (ML20100M295)
- 05000335/LER-1985-003-02, :on 850307,reactor Trip Occurred During Logic Matrix Test.Caused by Operator Turning Test Switch to Incorrect Position.Note to Be Added to Procedure Methods to Terminate Logic Matrix Test + (ML20100M305)
- LIC-96-0030, Forwards Fort Calhoun Station Performance Indicators, for Jan 1996 + (ML20100M306)
- ML20100M311 + (ML20100M311)
- ML20100M322 + (ML20100M322)
- ML20100M323 + (ML20100M323)